Identify a Bottleneck
Introduction Every day whether at work or at home, there are things that we do that can be improved upon. One way to improve upon them is to look at the processes and identify any issues or bottlenecks. Bottlenecks can occur at any point within the process from preparation to the completion of the process. To steam line a process it is imperative to identify possible issues where bottlenecking occurs. My flow chart for this assignment looked at the time it took me to get ready for work in the morning and getting to work on-time.
Bottleneck
While collecting the data for my flow chart, I found some areas in which bottlenecks occurred. The first occurred when my youngest son would wake-up prior to me getting into the shower. When this happened, my oldest son and myself were spending a good deal of time tending to him and find something to occupy him so that we could get ready. Being that he is three-years-old it can take much effort finding something to keep him occupied. The second bottleneck that occurred was when my oldest son would shower before me and would take an extended shower. I would be awake and sitting idle, not being able to get anything accomplished, waiting for him to finish. This extended shower cut into my available time to get ready in the morning and I found myself rushing to get out the door.
Conclusion
When an issue such as a bottleneck occurs and is identified, the following steps should be taken. First examine where the bottleneck is occurring and why. Once this is done the next step is to find out the best way to correct the issue or resolve the bottleneck. Because I have identified two bottlenecks within my process of getting ready for work, I now should focus on how to find the best means in which to correct

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Since the beginning the team decided to try an aggressive strategy to win the game, assuming a riskier position with higher potential benefits and costs. For that, it was necessary to identify key parameters of the process and design a dashboard to analyze the information and make decisions in a faster way. The key parameters we started monitoring were demand (jobs accepted), stations utilization and lead times of the entire process. The first goal was to balance the line and satisfying the demand.…

    • 855 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Identify a resource currently used in your organisation that is not operating at peak performance. Describe how you can help your organisation implement alternative approaches to improving this resource usage and eliminate some of the inefficiencies and waste that currently exist.…

    • 468 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Ops 561- Week 5

    • 1010 Words
    • 5 Pages

    In week one of this class, I was tasked to design a flowchart for a process in my daily life that I can improve. I chose my morning routine before work. My goal is to get out of the house by 7:38am Monday-Friday in order to catch my bus for work at 7:41am. I have trouble keeping track of time, usually missing the bus about one time every two weeks. I have discovered through the flowchart in week one, that my entire process has serious flaws. All of the bottlenecks were identified and improved upon as necessary. After collecting data over the past four weeks, I see changes in the process, using time as the metric. This paper will display the data that has been collected, as well as the calculations for the control limits, discuss the effect of the seasonal factors, and discuss the confidence intervals and their usefulness.…

    • 1010 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Shuzworld Analysis

    • 5851 Words
    • 19 Pages

    A. Workflow: Shuzworld produces Rugged Wear Work Boots at its Shanghai production facility using an 8-step process and an assembly line of 8 workstations. Each workstation performs a single task that can range from 3 minutes to 10 minutes to complete, resulting in a total time of 46 minutes to fully assemble one pair of steel-tipped work boots. The facility has a budget to produce 6 work boots an hour, with a 40-hour work week (48 work boots a day). The following table shows the task schedule, along with the time required for each task and predecessor information to complete the 8-step process. The graph shows the current layout of the 8 workstations in the production line:…

    • 5851 Words
    • 19 Pages
    Powerful Essays
  • Satisfactory Essays

    This week students need to select a process improvement project to work on during this course. There are four parts to this mini-project that you will do throughout this course (read all four parts due Week 2, 4, 6, and 8 before continuing with this assignment to understand how this breaks down in the coming weeks - link). Students may select something at work (i.e. a process or quality issue that can be pursued to help grow your career) or it may be something that will simply make your life easier at home (i.e. getting ready in the morning/evening for work, cooking a meal, etc.).…

    • 560 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Qdc1 Study Guide

    • 3244 Words
    • 13 Pages

    Identify procedures that lead to process improvement. customer satisfaction, achieving higher quality, reducing waste, reducing cost, increasing productivity, and reducing processing time.…

    • 3244 Words
    • 13 Pages
    Powerful Essays
  • Satisfactory Essays

    The data below reflects a timed metric to validate the sorting and preparation of three loads of laundry; Denim, Polyester, and Whites. The process flow improvement will be to add one person per week to the sorting task to measure time.…

    • 1027 Words
    • 5 Pages
    Satisfactory Essays
  • Good Essays

    Ops 571 Bottlenecks

    • 701 Words
    • 3 Pages

    Waking up and getting out of the door to work in the morning is a process that takes several steps to complete. In order to get out of the house in less than one hour and fifteen minutes several of these step must be altered or eliminated from the process. In every process there are steps that slow down the process called bottlenecks. Examining the entire process closely and identifying bottlenecks is the first step to creating a process that is efficient and productive.…

    • 701 Words
    • 3 Pages
    Good Essays
  • Better Essays

    Ops 571 Week 5

    • 1070 Words
    • 5 Pages

    Process control is a major factor in ensuring that a process is working to its maximum potential. Sometimes process control means that one must conduct research to see how a process improvement can be implemented. Process improvement normally results in adjusting and modifying particular tasks or steps in a process to make them run more efficiently and smoothly. According to Chase, Jacobs, and Aquilliano, it is very important to put metrics in place so that you can determine if improvements are needed for a particular process (Chase, Jacobs, and Aquilliano, 2006). Over the last five weeks, I have observed the task of getting ready for work. After collecting data for analysis, I have enough information to develop a process improvement plan. In this paper, the control limits will be reviewed and any applicable seasonal factors that could impact the historical data will be discussed.…

    • 1070 Words
    • 5 Pages
    Better Essays
  • Good Essays

    National Cranberry

    • 620 Words
    • 3 Pages

    2. To address the wait time issue, NCC will need to analyze the plant operations to pin-point the bottlenecks and find ways, e.g. redesign the plant, invest in resources, to reduce these bottlenecks.…

    • 620 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Accounting Costs

    • 690 Words
    • 3 Pages

    Find ways to increase the capacity of the bottleneck, ensure there is minimal lost time at the bottleneck due to breakdowns and set-ups, focus business process improvement efforts on the bottleneck.…

    • 690 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Littlefield Case Study

    • 875 Words
    • 4 Pages

    Before the simulation started, our team created a trend forecast, using the first 50 days of data, showing us that the bottleneck station was at Station 1. On day 50 of the simulation, my team, 1teamsf, decided to buy a second machine to sustain our $1,000 revenue per day and met our quoted lead time for producing and shipping receivers. On day 97, we changed Station 2’s scheduling rule to priority step 2. We noticed that the bottleneck was not just at station 1, but at all stations, and that buying a new machine would not be the right choice to make, but rather, changing the way in which the station’s processing is queued would be the better option. By doing this, we could produce all incoming kits with a priority enabling an even flow of kits to Station 3. At day 97, our team ranked first in the overall standing, and wanted to try to maintain this standing for the rest of the simulation.…

    • 875 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    The Goal Book Questions

    • 558 Words
    • 3 Pages

    First, they had to find the bottlenecks and non-bottlenecks. Second, the processes at bottlenecks were changed. Third, they subordinated everything to these changes and decisions. Fourth, they elevated the system constraints.…

    • 558 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Cranberry and Berries

    • 1276 Words
    • 6 Pages

    1. In the current flow of the process, identify the bottleneck areas. What recommendations, both short-term and long-term, would you make to solve the bottleneck problem?…

    • 1276 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    Transition: For these kinds of tasks, we need the cure of procrastination: the three step method I experimented on myself.…

    • 368 Words
    • 2 Pages
    Satisfactory Essays