INTRODUCTION
Nepal is being ravaged by the electricity crisis. The electricity crisis of this millennium began in 2006. Nepal saw the last electricity crisis of the last millennium in 1999 and, with the commissioning of Khimti project in 2000, there was no load shedding through till 2005. Nepal was grappling with the problem of flood in the first week of August 2008, with resultant loss of life and limb as well as property in the hilly areas and Terai of the west Nepal. NEA was imposing a load shedding of 2 hours each day, two days a week. With effect from 27th August, 2008 the load shedding hours was increased to 16.5 hours/week. The increase of load shedding by more than 4 times was ascribed to (a) inability to import power from India, due to collapse of a particular transmission tower in east Nepal caused by the breach of Koshi embankment, and consequent flooding of the area and (b) low water level in Kulekhani reservoir. There was one more reason behind the “augmentation” of load shedding hours which can be gleaned by studying following table closely .
Why Load Shedding?
It is rather normal for people to wonder why we have to put up with load shedding in a country that is endowed with an economic potential of 43,000 MW of hydropower. It is more surprising, knowing that relevant officials did have prior knowledge of what will be the demand for electricity in the country in specific years to come.
NEA and other policy makers must have been in a position to prepare plans for an increase in generation. However, it is saddening to note that generation expansion has not kept pace with consumption growth. One of the problems behind this is the failure to complete project construction and commission in time – Middle Marsyangdi project is a prime example which was supposed to be completed in 2004 originally. However, looking at the magnitude of power deficit, it is not difficult to see that even with this