Pm 586 - Project Cost and Schedule
Work Breakdown Structure – Quiz 1
See tutorial in Week 1 lecture.
a) In order to accommodate the smaller budget, the project manager will extend the schedule because the resources are not as efficient and/or reduce the scope. The triple constraint should always be balanced.
b) The quality is reduced because there are less resources to accomplish the task in a high-quality fashion. (TCO B) You are a project manager for a new Hardware Software Project. You just received the project charter and established your scope statement. Within the scope statement you defined some of the key components to meet the overall project objective. Establishing requirements will be critical to define and get approved. The hardware will be new for your company, so you will need to ensure the vendor is selected and the hardware is appropriately installed into your environment. The supporting software will need to be designed and coded. It will also need to be installed and tested on the system. To ensure the users know how to use the new software, training will be needed for managers and the associates. You have assembled your team of experts, and they are anxious to get started.
a) To ensure you have a clear scope for your team, create a 2-level WBS. Don’t forget to include your WBS numbering. b) In your WBS, how many work packages have been created? | | | Student Answer: | | WBS#DESCRIPTION RESPONSIBILITY DELIVERABLE 0.0 Hardware/Software PM – John 1.1 HW Vender Selection PM- John Selected Vendor 2.0 Design Software Peter Software Design 3.0 Code Software Paul Coded Software 3.1 Install Software Peter Installed Software 3.2 Test Software Peter Tested Software 3.3 Train Staff Mary Trained Staff | | Instructor Explanation: | Chapter 4, and Week 2 Lecture.
a) Answers may vary. Confirm a 2 level WBS, also confirm WBS numbering are correct.
Sample:
Develop Hardware Software Project
1.0 Requirements
2.0 Hardware
2.1 Select vendor
2.2 Install hardware
3.0 Software

You May Also Find These Documents Helpful

  • Satisfactory Essays

    The Berkshire Hills Bancorp is the parent of Berkshire Bank. The organization has approximately $6.0 billion in assets and 90 full service branch offices in Massachusetts, New York, Connecticut, and Vermont providing personal and business banking, insurance, and wealth management services. (Berkshire Hills Bancorp, 2014). The organization has a hiring process that needs updating to be able to identify the best candidate for the open positions.…

    • 567 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Nt1330 Unit 6 Paper

    • 579 Words
    • 3 Pages

    Complete a “WBS of all the work that must be done to complete the project” (Wysocki, 2009).…

    • 579 Words
    • 3 Pages
    Powerful Essays
  • Satisfactory Essays

    Proj586 - Week 2 Quiz

    • 932 Words
    • 4 Pages

    a) If the project scope is increased, what are the likely steps that the project manager would take with regards to the other triple constraints? Why? (15 points)…

    • 932 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    To complete this project you are required to initiate, plan, implement, monitor, finalise and review a straightforward work-related project based on a provided Scenario.…

    • 5764 Words
    • 24 Pages
    Powerful Essays
  • Powerful Essays

    Proj586 Project

    • 2037 Words
    • 9 Pages

    Congratulations! You have just completed the project charter, scope statement and WBS. Now that you know what needs to be done, as the Project Manager, you are now ready to begin planning your project.…

    • 2037 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Prepare a 2-3 page plan for gathering requirements. Build on the systems development selected in Week Two. Begin gathering the requirements for the project. State any assumptions you make. State the difficulties of gathering the requirements.…

    • 409 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Any restriction that defines a project’s limitation in project management is a constraint. Three project constraints- scope, cost and schedule are also known as the triple constraints or the project management triangle. Each of these constraints relates to each other and cannot be altered without affecting at least one of the others.…

    • 251 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Date constraints –> Date constraints establishes time milestones or benchmarks on a project that the entire construction team works toward…

    • 3773 Words
    • 12 Pages
    Powerful Essays
  • Powerful Essays

    developed a draft of a project implementation life cycle that has 26 steps. You are to…

    • 7169 Words
    • 46 Pages
    Powerful Essays
  • Better Essays

    4. The planning and control of the whole process is inadequate. The size of the whole operation becomes disproportionate to its outcome. Too much energy and time is devoted to recording waste…

    • 1110 Words
    • 5 Pages
    Better Essays
  • Good Essays

    homework 1

    • 2685 Words
    • 11 Pages

    a. not equally productive in all tasks because the production possibilities frontier is bowed out.…

    • 2685 Words
    • 11 Pages
    Good Essays
  • Satisfactory Essays

    Read Me First

    • 1484 Words
    • 6 Pages

    One of the hallmarks of a successful technology project is having a clear idea of what will be delivered at project completion. A project charter and detailed project requirements help make this clear. As a project manager, you must continually manage according to this idea and make sure that the scope of the effort does not deviate from the goal.…

    • 1484 Words
    • 6 Pages
    Satisfactory Essays
  • Powerful Essays

    Pm 586: Project Part 1

    • 839 Words
    • 4 Pages

    To deliver to the company a completely operational 25,000 square foot manufacturing and distribution facility. To install all plant equipment and complete testing to ensure that all plant equipment is working to specifications. To complete an extensive walk-through one week prior to sign off by production management.…

    • 839 Words
    • 4 Pages
    Powerful Essays
  • Good Essays

    Architectural decisions- Hardware specifications - Hardware design - Hardware documentation - Integration first phase - Serial I/O drivers - System hard/software test -Network interface - Integrated acceptance testing.…

    • 576 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Internship -Report

    • 451 Words
    • 2 Pages

    Use this style for all paragraphs. It is 1.5 line spacing, with each new paragraph indented 0.35”. Use of styles is encouraged to ensure a consistent appearance to your document. Any change to the style is propagated throughout the document, reducing the time required to change the appearance of the document.…

    • 451 Words
    • 2 Pages
    Satisfactory Essays

Related Topics