Located North Ireland, the town of Mostalivo has been blessed with many natural creation and landscape as snowy mountain whole year long and beautiful mountain view. However, the area is not well populated and most of the place is inhabited. Therefore, the local authority starts a new campaign to redevelop the town and facilities there. As the newly appointed manager of the project, a project plan is required with sufficient information and proposal from the investigation stage of the area to the completion of the new town.
The plan is to redevelop the town without disturbing the natural cycle and minimize the pollution and waste from the town. The plan also focuses on long term development as constant construction will heavily damage the nature.
II. Project Scope Statement
2.1 Project objectives
The project emphasizes on 2 objectives:
To renovate the town into a high class resort with terrain park at cost not exceed $1,478,000
To maintain the ecosystem in the area after human’s interfere and avoid natural disaster
2.2 Deliverables
To develop the endorsed resort and park occupying the site of 115.00 hectares
To establish the additional raise of capacity for 8000 to 10000 visitors
To develop new resort along the mountain and terrain park near the mountain side
To develop a trail system, lift system, weather forecast system and snow density control system.
2.3 Milestones
1. Permits approved- 14th June, 2015
2. Inspections and plan finalization-7th July, 2015
3. Construction and Final inspection – 7th May 2016
4. Opening ceremony- 21st July 2016
2.4 Technical requirements
Terminal speed:
The maximum speed for a fixed geometry and nominal parameters as the following formula:
With slope angle, , mass of rider, m, a drag coefficient of , frontal area, A, density of air, , and kinetic friction coefficient, , the terminal speed is .
Equivalent fall height (EFH):
The vertical height of fall that results in a speed at impact on a