Purpose of Power System Protection
Purpose of POWER System protection
The purpose of any power system is to generate, transmit, and distribute electricity to the consumer in a manner that is safe, reliable, and economical; both in the short and long term. Under normal operating conditions, the currents, voltages, power, and energy associated with such systems are all matched to meet the system’s design requirements with respect to reliability, quality, safety, and economy.
To ensure maximum returns on the large or expensive investments in the components which go to make up the power system and to keep the customers satisfied with reliable (i.e., adequate and secure) service, the power system must be kept in operation continuously without major breakdowns and consequently without violating the design limits (because of abnormal currents, voltages, or power). This can be achieved in two ways: (i) Implement a system adopting/using components, which should not fail (i.e., failure-free components) and requires the least or nil maintenance to maintain the adequacy and security of supply. By common sense, implementing such a system is neither economical nor feasible, except for small systems. (ii) Foresee or anticipate any possible/credible effects or failure events that may cause long term shutdown of a system, which in turn may take longer time to bring back the system to its normal course. The main idea is to restrict or minimise the disturbances during such failures or events to a limited area and continue power supply in the balance/unaffected areas.
The second approach is the one commonly used in practical power systems. To realise it, special equipment is normally installed to continuously monitor the power system to detect undesired conditions that present a threat to system reliability (adequacy and security) and take (initiate) action to remove the threat from the system with minimal adverse effects (i.e., detect abnormalities that can possibly happen in various sections of a power

You May Also Find These Documents Helpful

  • Better Essays

    D1 Unit 4 Essay

    • 1719 Words
    • 7 Pages

    Qu6. Analyse the need for selecting the different voltages used for different parts of the generation, transmission and distribution systems drawn for Qu.5.…

    • 1719 Words
    • 7 Pages
    Better Essays
  • Powerful Essays

    AIS Review Sheet

    • 2832 Words
    • 12 Pages

    4) Defense in Depth: Employ multiple layers of controls in oorder to avoid having a single point of failure…

    • 2832 Words
    • 12 Pages
    Powerful Essays
  • Satisfactory Essays

    4. Is creating redundancy for systems such as Active Directory or Web servers a part of the DRP or…

    • 246 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    ACCT 301 Week2 Homework

    • 527 Words
    • 3 Pages

    b. Risk assessment: this just means they check there controls for weaknesses regularly and fix any discrepancies with stronger controls.…

    • 527 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    4. Is creating redundancy for systems such as Active Directory or Web servers a part of the…

    • 314 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    caregroup

    • 721 Words
    • 4 Pages

    In order to be properly prepared for an outage in the magnitude of what transpired to the…

    • 721 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    LOTF Symbolism Essay

    • 5825 Words
    • 24 Pages

    together to both power systems that they mean different things for each of them. The aim of…

    • 5825 Words
    • 24 Pages
    Powerful Essays
  • Better Essays

    3. Identify and implement preventative controls and measures to increase availability, decrease the disruption effects, and reduce the cost of contingency.…

    • 805 Words
    • 4 Pages
    Better Essays
  • Good Essays

    Anticipate danger and manage risks by carrying out assessments, avoiding hazards and carrying out health and safety checks…

    • 928 Words
    • 4 Pages
    Good Essays
  • Good Essays

    student

    • 287 Words
    • 1 Page

    5. Which of the seven domains of a typical IT infrastructure is easy to implement risk mitigation solutions but difficult to monitor and track effectiveness? WAN…

    • 287 Words
    • 1 Page
    Good Essays
  • Good Essays

    The smart grid enables information to flow back and forth between electric power providers and consumers and…

    • 705 Words
    • 3 Pages
    Good Essays
  • Good Essays

    The advantages this broader perspective provides to planners is that they understand the symbiotic relationship between technologies and with this knowledge can create contingency plans in the event of a malfunction or any situation that would stop the technology from functioning. Planners can perform a risk analysis to identify technologies (including humans) that are most vulnerable to malfunction (this would include component failure, act-of-God, and human error) and prepare accordingly by having back-up components. Additionally, in the event of component failure, the planners are able to more accurately troubleshoot the system by knowing what stage is responsible for what function.…

    • 5204 Words
    • 149 Pages
    Good Essays
  • Good Essays

    Real power reserves will then be further discussed. Reserve is categorized into two, normal operation reserve and disturbance reserve at which it is dependent on the cause of the reserve requirement. It is based on how fast the reserve capacity is available for the system operation. Firstly, the instantaneous reserve consists of frequency control reserve and momentary disturbance reserve, at which available within 30 sec. Frequency control reserve keeps the frequency within tolerance ± 0.1 Hs where used frequency control reserve is after 15mins replaced by fast reserve. Furthermore, momentary disturbance reserve replaces the lost production of tripped units or outages of important transmission lines. The same goes to momentary disturbance reserve at which 15mins is needed for replacing with fast disturbance reserve. NORDEL has PD1b with 200 MW less than the decisive fault case, relying on the consumption, frequency and voltage…

    • 949 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    As a result of reforms in the power sector many new Distribution Companies have started their operations. Apart from improving financial viability, reduction of T&D losses the distribution reforms have been identified as a key area in terms for fulfilling consumers‘ expectations in terms of service delivery in the area of Reliability and Quality of power supply. Reliability and Quality of power supply were rarely an issue till recent past and little or no attention was paid to these aspects of power supply. If consumers‘ expectations are not fulfilled in respect of Reliability and Quality of power supply there is resentment and they are reluctant to pay for the service. On the other hand if the expectations are met or surpassed the consumers are satisfied and willingness to pay increases by sharing the tariff hike. This in turn helps to tone up the financial viability of the DISCOMs (Distribution Companies). Reliability has to do with continuous and uninterrupted power supply i.e. total loss of voltage. Reliability does not cover voltage sags, swells, impulses or harmonics. Reliability indices typically consider such aspects as –     Number of consumers Connected load Duration of the interruptions measured Quantum of power interrupted and…

    • 2760 Words
    • 12 Pages
    Powerful Essays
  • Good Essays

    Fault Analysis

    • 710 Words
    • 3 Pages

    The fault analysis of a power system is required in order to provide information for the selection of switchgear, setting of relays and stability of system operation. A power system is not static but changes during operation (switching on or off of generators and transmission lines) and during planning (addition of generators and transmission lines). Thus fault studies need to be routinely performed by utility engineers (such as in the TNB).…

    • 710 Words
    • 3 Pages
    Good Essays