Montarius White
BSA/376
3/02/2015
Deborah Marshall
Abstract
The health care system is full of growth and change. Health care managers have become a lot more involved with project management. I think that part of the growth development in the health care business has to do with creating brand new medical patients, patient databases for health charts and technological enhances and this paper involves the six activities: coding, testing, installation, documentation, training, and support and also this assignment is a discussion on the conversion from the design stage to the implementation phase.
Coding
Transformations should be implemented into the code and area testing, and other suitable system quality assurance and validation developments should be performed. The coding will be carried out in little increments to guarantee the validity of the system. I believe that in this stage the code is the primary focus for the creator, and this is the longest staged in the system development phases. The objective of the coding stage is to translate the design of the EHR system into code in the provided programming languages. For a given creation, the target of this phase is to implement the design in the best possible way Satzinger, J. W., Jackson, R. B., & Burd, S. D. (2009).
The code is a process whereby the specifications developed in previous steps are turned into functioning computer codes. Once the code has been developed, it is tested against the requirements to guarantee that the system is solving the needs discussed and collected during the requirements stage and throughout the staged department testing and system testing, the approved testing is completed. Testing is the development of analyzing a product to see what defects it contains. I feel that this is the time where majority of the programmers will sit down in front of computers and do coding. During the code phase, each program will be tested