ERP AND MRP
CH14.QXD

9/24/07

11:56 AM

Page 435

.

14

Chapter
Enterprise resource planning (ERP)

Source: Northampton Symphony Orchestra

Introduction
One of the most important issues in planning and controlling operations is managing the sometimes vast amounts of information generated by the activity. It is not just the operations function that is the author and recipient of this information, almost every other function of a business will be involved. So, it is important that all relevant information that is spread throughout the organization is brought together. Then it can inform planning and control decisions such as when activities should take place, where they should happen, who should be doing them, how much capacity will be needed and so on.
This is what enterprise resource planning (ERP) does (see Figure 14.1). It grew out of a set of calculations known as material requirements planning (MRP), which is also described in this chapter.

Topic covered in this chapter
Supply chain planning and control
The market requires... specified time, quantity and quality of products and services
The operation supplies... the informational ability to deliver products and services

Operations strategy Design

Operations management Planning and control

Figure 14.1 This chapter covers enterprise resource planning (ERP)

Improvement

CH14.QXD

9/24/07

11:56 AM

Page 436

.

436

Part Three Planning and control

Key questions

???

I

What is ERP?

I

How did ERP develop?

I

What is MRP?

I

What is MRP II?

I

How is ERP developing?

Operations in practice
SAP at Rolls-Royce

GO TO
WEB!

14A

Rolls-Royce is one of the world’s largest manufacturers of the gas turbines that are used to propel civil aircraft, military aircraft, ships, and in power generation as well as many other uses. They are exceptionally complex products, typically with around 25,000 parts and hundreds of assemblies and sub-assemblies. Their production is equally complex with over 600 external suppliers and thousands of work centres in many different locations, which is why Rolls-Royce was one of the earliest users of computers to help with planning. Traditionally the company had developed its own software; however, this had become increasingly expensive compared with buying off-the-shelf systems. It was also risky because customized and complex software could be difficult to update and often could not exchange or share data. So the company decided to implement a standard ERP system from the market-leading German SAP company.
Because it was a ‘commercial’ off-the-shelf system it would force the company to adopt a standardized approach. Also it would fully integrate all the company’s systems and updates would be made available by SAP.
Finally, the whole organization would be able to use a single database, reducing duplication and errors. The database modules included product information, resource information (plant assets, capacities of machines, all human resource data, etc.), inventory, external suppliers, order-processing information and external sales.
Yet the company knew that many ERP implementations had been expensive disasters. ‘We were determined to ensure that this did not happen in RollsRoyce,’ said Julian Goulder, who led the implementation.
‘The project was too important to us; it was the largest single element within our strategic investment plan. So we had a core technical team that led the design of the

Source: Rolls-Royce plc

1

systems and a large implementation team that was spread around the businesses. We always made sure that we communicated the changes throughout the company and used extensive education and training. We also phased the implementation to avoid any risky “big-bang” approach. There was an extensive data “clean-up” to ensure accuracy and integrity of existing information, and all existing processes were reviewed and standardized. In fact, this implementation forced us to re-examine all of our processes, to make sure that they fitted the SAP system. Within operations we have already seen a significant reduction in inventory, improved customer service and substantially improved business information and controls.’

9/24/07

11:56 AM

Page 437

.

Chapter 14 Enterprise resource planning (ERP)

What is ERP?

Source: SAP

CH14.QXD

Enterprise resource planning (ERP)
The integration of all significant resource planning systems in an organization that, in an operations context, integrates planning and control with the other functions of the business.

Materials requirement planning (MRP)
A set of calculations embedded in a system that helps operations make volume and timing calculations for planning and control purposes.

The SAP company has become one of the leading suppliers of ERP and related systems

An easy way of thinking about enterprise resource planning is to imagine that you have decided to hold a party in two weeks’ time and expect about 40 people to attend. As well as drinks, you decide to provide sandwiches and snacks. You will probably do some simple calculations, estimating guests’ preferences and how much people are likely to drink and eat.
You may already have some food and drink in the house which you will use, so you will take this into account when making your shopping list. If any of the food is to be cooked from a recipe, you may have to multiply up the ingredients to cater for 40 people. Also, you may wish to take into account the fact that you will prepare some of the food the week before and freeze it, while you will leave the rest to either the day before or the day of the party. So, you will need to decide when each item is required so that you can shop in time. In fact, planning a party requires a series of interrelated decisions about the volume (quantity) and timing of the materials needed.2 This is the basis of materials requirement planning. It is a process that helps companies make volume and timing calculations (similar to the party, but on a much larger scale, and with a greater degree of complexity). But your planning may extend beyond
‘materials’. You may want to rig up a sound system borrowing a friend’s speakers – you will have to plan for this. The party also has financial implications. You may have to agree a temporary increase to your credit card limit. Again, this requires some forward planning and calculations of how much it is going to cost and how much extra credit you require. Both the equipment and financial implications may vary if you increase the number of guests. But if you postpone the party for a month, these arrangements will change. There are also other implications of organizing the party. You will need to give friends, who are helping with the organization, an idea of when they should come and for how long. This will depend on the timing of the various tasks to be done (making sandwiches, etc.).
So, even for this relatively simple activity, the key to successful planning is how we generate, integrate and organize all the information on which planning and control depends. Of course, in business operations it is more complex than this. Companies usually sell many different products to many hundreds of customers who are likely to vary their demand for the products. This is a bit like throwing 200 parties one week, 250 the next and 225 the following week, all for different groups of guests with different requirements who keep changing their minds about what they want to eat and drink. This is what ERP does – it helps companies
‘forward plan’ these types of decisions and understand all the implications of any changes to the plan.

437

CH14.QXD

9/24/07

11:56 AM

Page 438

.

Part Three Planning and control
Bill of material (BOM)
A list of the component parts required to make up the total package for a product or service together with information regarding their level in the product or component structure and the quantities of each component required. Master production schedule (MPS)
The important schedule that forms the main input to material requirements planning, it contains a statement of the volume and timing of the end products to be made.

Manufacturing resource planning (MRPII)
An expansion of material requirements planning to include greater integration with information in other parts of the organization and often greater sophistication in scheduling calculations.

Web-integrated ERP
Enterprise resource planning that is extended to include the ERP type systems of other organizations such as customers and suppliers.

GO TO
WEB!

14B

The origins of ERP
Enterprise resource planning is the latest, and the most significant, development of the original MRP philosophy. The (now) large companies which have grown almost exclusively on the basis of providing ERP systems include SAP and Oracle. Yet to understand ERP, it is important to understand the various stages in its development, summarized in Figure 14.2.
The original MRP became popular during the 1970s, although the planning and control logic that underlies it had, by then, been known for some time. What popularized MRP was the availability of computer power to drive the basic planning and control mathematics. It uses product information in the form of a bill of material (BOM), which is similar to the
‘component structure’ discussed in Chapter 5, together with demand information in the form of a master production schedule (MPS).
Manufacturing resource planning (MRP II) expanded out of MRP during the 1980s.
Again, it was a technology innovation that allowed the development. Local area networks
(LANs, see Chapter 8), together with increasingly powerful desktop computers, allowed a much higher degree of processing power and communication between different parts of a business. Also MRP II’s extra sophistication allowed the forward modelling of ‘what-if ’ scenarios. The strength of MRP and MRP II lay always in the fact that they could explore the consequences of any changes to what an operation was required to do. So, if demand changed, the MRP system would calculate all the ‘knock-on’ effects and issue instructions accordingly.
This same principle applies to ERP, but on a much wider basis. ERP systems allow decisions and databases from all parts of the organization to be integrated so that the consequences of decisions in one part of the organization are reflected in the planning and control systems of the rest of the organization (see Figure 14.3). The potential of web-based communication has provided a further boost to ERP development. Many companies have suppliers, customers and other businesses with which they collaborate which themselves have ERP-type systems. An obvious development is to allow these systems to communicate.
However, the technical as well as organizational and strategic consequences of this can be formidable. Nevertheless, many authorities believe that the true value of ERP systems is fully exploited only when such web-integrated ERP (known by some people as ‘collaborative commerce’ or c-commerce) becomes widely implemented.

Increasing impact on the whole supply network

438

Web-integrated enterprise resource planning (collaborative commerce, c-commerce)
Enterprise resource planning (ERP)
Manufacturing resource planning (MRP II)
Material requirements planning (MRP)
Increasing integration of information systems

Figure 14.2 The development of ERP

9/24/07

11:56 AM

Page 439

.

Chapter 14 Enterprise resource planning (ERP)

Senior management and stakeholders
Strategic
reporting applications Financial applications Suppliers

Delivery and logistics applications

Integrated database Purchasing and supply applications Front-office staff Sales and marketing applications

Operations applications Back-office staff CH14.QXD

Customers

Service applications Human resource management applications
Employees

Figure 14.3 ERP integrates information from all parts of the organization

Materials requirements planning (MRP)
Materials requirements planning systems typically require certain data records which the
MRP program checks and updates. Figure 14.4 shows the information required to perform
MRP and some of the outputs from it. The most obvious inputs are customer orders and forecast demand. MRP performs its calculations based on the combination of both firm and forecast orders. All other requirements calculated within the MRP process are derived from these demands (MRP is what we described in Chapter 10 as a dependent demand system).

Demand management
Taken together, the management of customer orders and sales forecasts is called ‘demand management’. This is a set of processes which interfaces with the customer market.

Customer orders

Master production schedule Forecast demand

Bills of materials

Materials requirements planning

Inventory records

Purchase orders

Materials plans

Works orders

Figure 14.4 Materials requirements planning (MRP) schematic

439

CH14.QXD

9/24/07

11:56 AM

Page 440

.

440

Part Three Planning and control

Depending on the business, these processes may include sales order entry, demand forecasting, order promising, customer service and physical distribution. For example, if you place an order on the internet and ring up a week later to check why your purchase has not arrived, you will deal with a call centre service operator. He or she can access the details of your particular order and advise why there might have been a hold-up in delivery. In addition, you could be given a delivery promise and information regarding the mode of delivery.
That single interaction with a customer triggers a chain of events. The item has to be picked from a warehouse; a stores operator must therefore be given the appropriate information, the delivery must be booked and so on. If demand information is not available or communicated, any subsequent plans will be misleading. Therefore we now need to consider some of the implications of managing demand on MRP.
Customer orders

Sales functions typically manage a dynamic, changing order book made up of confirmed orders from customers. Of particular interest to the MRP process are the records of exactly what each customer has ordered, how many they have ordered and when they require delivery. But customers may change their minds after having placed their orders and because customer service and flexibility are increasingly important competitive factors, MRP must be able to react to this. Considering that each of several hundred customers may make changes to their sales orders, not once but possibly several times after the order has been placed, managing the sales order book is a complex and dynamic process.
Forecast demand

Using historical data to predict future trends, cycles or seasonality is always difficult. Driving a business using forecasts based on history has been compared to driving a car by looking only at the rear-view mirror.3 In spite of the difficulties, many businesses have no choice but to forecast ahead. Take automotive manufacturers, for example. To satisfy customers’ demands for delivery speed, at the time a customer places an order the company has already made estimates of the models, the engines and the colours it thinks will be sold. The customer can, at the time of ordering, choose from a wide range of options in terms of upholstery, audio systems and glass tinting, etc., all of which can be added to the main assembly, effectively giving the impression of customization. The manufacturer has to predict ahead the likely required mix of models and colours to manufacture and the likely mix of options to purchase and have available in inventory.
Combining orders and forecasts

A combination of known orders and forecasted orders is used to represent demand in many businesses. This should be the best estimate at any time of what reasonably could be expected to happen. But the further ahead you look into the future, the less certainty there is about demand. Most businesses have knowledge of short-term demand, but few customers place orders well into the future. Based on history and on market information, a forecast is put together to reflect likely demand, although different operations will have a different mix of known and forecast orders. A make-to-order business, such as a jobbing printer, will have greater visibility of known orders over time than a make-for-stock business, such as a consumer durables manufacturer. Purchase-to-order businesses do not order most of their raw materials until they receive a confirmed customer order. For example, a craft furniture maker may not order materials until the order is certain. Conversely, there are some operations that have very little order certainty at the time they take most of their decisions. For example, newspaper publishers distribute newspapers to retail outlets on a sale-or-return basis: that is, real demand is evident to them only after each day’s trading has finished and they calculate how many papers were actually sold. Also, many businesses have to operate with a varying combination of known orders and forecasts. The week before Mother’s Day, small local florists receive a large volume of orders for bouquets and flower arrangements. At

CH14.QXD

9/24/07

11:56 AM

Page 441

.

Chapter 14 Enterprise resource planning (ERP)

other times of the year, a greater amount of their business is passing trade, which is affected by the weather and shopping patterns.

Master production schedule
Master production schedule (MPS)
The important schedule that forms the main input to material requirements planning, it contains a statement of the volume and timing of the end products to be made.

The master production schedule (MPS) is MRP’s most important planning and control schedule. The MPS contains a statement of the volume and timing of the end products to be made; this schedule drives the whole operation in terms of what is assembled, what is manufactured and what is bought. For example, in a hospital theatre there is a master schedule which contains a statement of which surgical procedures are planned and when. This can be used to provision materials for the operations, such as the sterile instruments, blood and dressings. It also governs the scheduling of staff for operations, including anaesthetists, nurses and surgeons.
Sources of information for the MPS

It is important that all sources of demand are considered when the master production schedule is created. Often the miscellaneous requirements in a business can disrupt the entire planning system. For example, if a manufacturer of earth excavators plans an exhibition of its products and allows a project team to raid the stores so that it can build two pristine examples to be exhibited, this is likely to leave the factory short of parts. (If it doesn’t, then the inventory was excess to requirements and should not have been there anyway.) Similarly, sister companies may be able to ‘borrow’ parts at short notice for their own purposes. If such practices are allowed, the planning and control system needs to take them into account. Figure 14.5 shows the inputs that may be taken into account in the creation of a master production schedule.
The master production schedule record

Master production schedules are time-phased records of each end product, which contain a statement of demand and currently available stock of each finished item. Using this information, the available inventory is projected ahead in time. When there is insufficient inventory to satisfy forward demand, order quantities are entered on the master schedule line. Table
14.1 is a simplified example of part of a master production schedule for one item. Demand is shown in the first row and can be seen to be gradually increasing. The second row, ‘Available’,

Known orders
Key capacity constraints Forecast demand

Sister plant demand

Inventory levels

Master production schedule

R&D demand

Exhibition/promotion requirements Spares demand

Safety stock requirements Figure 14.5 Inputs into the master production schedule

441

CH14.QXD

9/24/07

11:56 AM

Page 442

.

442

Part Three Planning and control
Table 14.1 Example of a master production schedule
Week number
1

2

3

4

5

6

7

8

9

Demand

10

10

10

10

15

15

15

20

20

Available

20

10

0

0

0

0

0

0

0

0

0

10

10

15

15

15

20

20

MPS
On hand

30

shows how much inventory of this item is expected to be in stock at the end of each weekly period. The opening inventory balance, ‘On hand’, is shown separately at the bottom of the record. Here, 30 of this part are currently in stock in week 0. The Available figure of 20 in the first week is calculated by taking demand of 10 away from the on-hand inventory of 30. The third row is the MPS; this shows how many finished items need to be completed and available in each week to satisfy demand. As there is adequate inventory already available in weeks
1 and 2, no plans are made to complete more in those weeks. However, in week 3, it is necessary for production to complete 10 of these items to satisfy projected demand; if production cannot complete 10 at this time, there is the possibility that customers will be put on back order (that is, they will be made to queue).
Chase or level master production schedules

In the example in Table 14.1, the MPS increases as demand increases and aims to keep available inventory at 0 – the master production schedule is ‘chasing’ demand (see Chapter 11), that is adjusting resources to match demand. An alternative ‘level’ MPS for this situation is shown in Table 14.2. Level scheduling involves averaging the amount required to be completed to smooth out peaks and troughs. Table 14.2 shows how this level schedule generates more inventory than the previous MPS. In this case, the average projected inventory of finished items over the nine-week period is 25 per week (that is, more than any one month’s demand during this period). In the previous table, the average inventory was only 3.
Available to promise (ATP)

Available to promise

The master production schedule provides the information to the sales function on what can be promised to customers and when delivery can be promised. The sales function can load known sales orders against the master production schedule and keep track of what is available to promise (ATP) (see Table 14.3).
The ATP line in the master production schedule shows the maximum in any one week that is still available, against which sales orders can be loaded. If sales promises above that figure, it will not be able to keep its promise. For potential sales over this ATP figure, negotiation will be needed to see whether there is any possibility of satisfying this extra demand by adjusting the MPS. However, this must be run through the MRP process to see the resulting effects on resource requirements.

Table 14.2 Example of a ‘level’ master production schedule
Week number
1

2

3

4

5

6

7

8

9

Demand

10

10

10

10

15

15

15

20

20

Available

31

32

33

34

30

26

22

13

4

MPS

11

11

11

11

11

11

11

11

11

On hand

30

9/24/07

11:56 AM

Page 443

.

Chapter 14 Enterprise resource planning (ERP)
Table 14.3 Example of a level master production schedule including available to promise
Week number
1

2

3

4

5

6

7

8

9

15

15

20

20

Demand

10

10

10

10

15

Sales orders

10

10

10

8

4

Available

31

32

33

34

30

26

22

13

4

ATP

31

1

1

3

7

11

11

11

11

11

11

11

11

11

11

11

11

11

MPS
On hand

30

The bill of materials

Bills of materials (BOM)
A list of the component parts required to make up the total package for a product or service together with information regarding their level in the product or component structure and the quantities of each component required. Having established this top-level MPS schedule, MRP performs calculations to work out the volume and timing of assemblies, sub-assemblies and materials that are required. To explain the process, a board game called ‘Treasure Hunt’ will be used. To be able to manufacture this game, Warwick Operations Games Inc. needs to understand what parts are required to go into each boxed game. To do this it requires records of the ‘ingredients’ or components that go into each item, much the same as a cook requires a list of ingredients to prepare a dish.
These records are called bills of materials (BOM) and are similar to the idea of product structures discussed in Chapter 5. They show which parts and how many of them are required to go into which other parts. Initially it is simplest to think about these as a product structure. The product structure in Figure 14.6 is a simplified structure showing the parts required to make the game. It shows that to make one game you require the components of the game – board, dice, characters and quest cards – a set of rules and the packaging. The packaging comprises a printed cardboard box and, inside the base, an injection-moulded plastic inner tray. Since the game was launched, finance was provided for television advertis-

Level 0

Warwick Operations Games Inc

Treasure Hunt game
00289

Level 1
Warwick Operations Games Inc

As advertised on TV

ad

ve

rt

is

ed

on

TV

sfafdsyt hgfjhtjht kjhgjgh jhkjghg uytkjkjlkii kjhoiuy As

CH14.QXD

Box lid
10077

Box base assy
10089

Quest cards
10023

Character set
10045

Level 2

As advertised on TV

Box base
20467

Inner tray
23988

TV label
10062

Figure 14.6 Product structure for the ‘Treasure Hunt’ game

Dice
10067

TV label
10062

Game board
10033

Rules
10056

443

CH14.QXD

9/24/07

11:56 AM

Page 444

.

444

Part Three Planning and control

ing, so an additional sticker stating ‘As advertised on TV’ is now stuck on the plastic inner tray and on the front of the complete box.
Levels of assembly

The product structure shows that some parts go into others, which in turn go into others. In
MRP we term these levels of assembly. The finished product – the boxed game – is said to be at level 0. The parts and sub-assemblies that go into the boxed game are at level 1, the parts that go into the sub-assemblies are at level 2 and so on. There are several features of this product structure and of MRP generally that should be noted at this time:
G

G

G

Multiples of some parts are required; this means that MRP has to know the required number of each part to be able to multiply up the requirements.
The same part (the TV label, part number 10062) may be used in different parts of the product structure. In this example, the label is needed to make the box base assembly and also to complete the ‘Treasure Hunt’ game. This means that MRP has to cope with this commonality of parts and, at some stage, aggregate the requirements to check how many labels in total are required.
The product structure stops when it gets down to parts that are not made by this business; for example, another operation makes and supplies the plastic inner trays. This supplier needs to know the product structure for the trays – the weight of plastic granules and the colour of plastic which is required – but the game manufacturer’s MRP system treats the plastic tray as a single, bought-in item. This is true even for complex modules or subassemblies, such as those bought in by computer manufacturers. Their product structure is not relevant to the in-house MRP, except in terms of the implications on the ‘lead time’ required to procure them.

The ‘shape’ of the component structure
Component structure
(product structure) shape
Diagram that shows the constituent component parts of a product or service package and the order in which the component parts are brought together (often called components structure).

The nature of the product structure is closely related to the design of the product. This is reflected in the component structure shape. The shape is partly determined by the number of components and parts used at each level – the more that are used, the wider the shape.
Therefore, standardizing components to reduce variety slims the shape of the product structure. Shape is also determined by the amount of the item made in-house. If most of the parts are bought in complete, with only assembly occurring in-house, such as with the ‘Treasure
Hunt’ game, the resulting product structure is very shallow, with few levels. However, if all the components are made from raw materials and then assembled under one roof, the resulting product structure is very deep. There are some recognized typical shapes of product structure – ‘A’, ‘T’, ‘V’ and ‘X’ (see Figure 14.7).
‘A’-shape product structures

The implications of an ‘A’-shape structure are that the business has only a limited product range to offer the customer. However, because there is little variety, the volumes of standardized production can give some economies of scale. Such products can also be made for stock; therefore the operation can be planned smoothly, rather than having to chase demand.

A-shape product structure

T-shape product structure

V-shape product structure

Figure 14.7 Different shapes of product structure

Hourglass or X-shape product structure

CH14.QXD

9/24/07

11:56 AM

Page 445

.

Chapter 14 Enterprise resource planning (ERP)

‘T’-shape product structures

A ‘T’-shape product structure is typical of operations that have a small number of raw materials but which produce a very wide range of highly customized end products. For example, a label manufacturer producing personal name and address labels uses standard materials and processes, but because the final part of the process is highly customized, it must be performed to order.
‘V’-shape product structures

This is similar to a ‘T’-shape structure, but with less standardization of process. It is typical of the petrochemical industry where a small number of raw materials is used to create a wide range of products. Operations which have these types of products are driven by customer orders. Because of their reliance on a small number of raw materials, any failure of supply of one material can cause disruption of service to much of the customer base.
‘X’-shape product structures

Some product designs consist of a small number of standard modules. For example, kitchen unit manufacturers make standardized bodies to which a wide range of doors and fittings can be attached. These standard modules are represented by the cross of the X. They are combined with a customized selection of features and options, giving a wide range of finished products. Automotive manufacturers typically use this ‘X’-shape product structure.
The same chassis assemblies, transmission assemblies, braking systems and engines are often used on a wide range of vehicles.

Single-level and indented bills of materials
Single-level bills of materials Indented bills of materials Bills of materials can become unwieldy, with (say) 15 levels of assembly and 5,000 different parts within a finished product. MRP systems cope with this by using single-level bills of materials and indented bills of materials. In single-level bills of materials, the details of the relationships between parts and sub-assemblies are stored as one single level at a time. For example, the single-level bills for the board game in the example provided previously are shown in Table 14.4. Each single-level bill of materials shows only the parts that go directly into it. Although most MRP systems store information in this way, they can also present them in the form of an indented bill of materials to show several levels at the same time.
Table 14.4 Single-level bills for board game
Part number: 00289
Description: Board game
Level: 0
Level
1
1
1
1
1
1
1
1

Part number
10089
10077
10023
10062
10045
10067
10033
10056

Description
Box base assy
Box lid
Quest cards set
TV label
Character set
Die
Game board
Rules booklet

Quantity
1
1
1
1
1
2
1
1

Part number: 10089
Description: Box base assy
Level: 1
Level
2
2
2

Part number
20467
10062
23988

Description
Box base
TV label
Inner tray

Quantity
1
1
1

445

CH14.QXD

9/24/07

11:56 AM

Page 446

.

446

Part Three Planning and control

Table 14.5 shows the whole indented bill of materials for the board game. The term
‘indented’ refers to the indentation of the level of assembly, shown in the left-hand column.

Table 14.5 Indented bill of materials for board game
Part number: 00289
Description: Board game
Level: 0
Level

Part number

Description

Quantity

0

00289

Board game

1

.1

10077

Box lid

1

.1

10089

Box base assy

1

..2

20467

Box base

1

..2

10062

TV label

1

..2

23988

Inner tray

1

.1

10023

Quest cards set

1

.1

10045

Character set

1

.1

10067

Die

2

.1

10062

TV label

1

.1

10033

Game board

1

.1

10056

Rules booklet

1

Worked example
The Novelty Pencil Company is concerned that its computer-based ERP system is preventing production employees from understanding exactly what goes into its products.
The technologies employed by the company include wood and graphite processing, injection moulding and extrusion of plastics, and the fine engineering of metals. Modern automated assembly machines allow the low-cost, mass production of volume products such as ballpoint pens. In managing the production of its complex range of over 6,000 products, the company has been aided by the use of a well-tried ERP system. Whereas some items, such as standard pencils, have a bill of materials with only a few levels, some of the more involved products require a breakdown of up to seven as processes have become more complex. Individual operators see only a part of the total process.
We can print out the bill of materials for each product. But it looks too technical and most people don’t really look at it. What we need is a more graphical diagram of some sort that will illustrate exactly what each product is made of. That will allow people to understand how their part of the process contributes to the product as a whole.
An example of a typical Novelty Pencil Company bill of materials is shown in Table
14.6. This illustrates the different levels of production involved in manufacturing a ‘XXXHB Pointy Pencil in Box of 10’ (level 0). The top level on the bill (shown as .1) gives all the items involved in the final packaging, including the finished pencil itself – coded FPOINT.
The next levels in the bill are all required in the production of pencils themselves, with level 2 being the materials required to label the pencils with the Pointy Pencil name and paint for dipping to give the Novelty ‘rounded end’ on the end of the pencil. At level 3 are the varnishes and paints required to coat the basic pencil, and finally level 4 details the raw materials – slats of wood, pencil lead slips and glue – which are used in the initial production of the pencil.

CH14.QXD

9/24/07

11:56 AM

Page 447

.

Chapter 14 Enterprise resource planning (ERP)

Solution

The likely solution to the company’s problem is to translate the ‘bill of materials’ information into a ‘product structure’ (also called a ‘component structure’). The figure below shows the product structure that is equivalent in Table 14.6.
Table 14.6 The bill of materials for XXX-HB ‘Pointy
Pencil’ in a Box of 10
Component

Box of Pointy Pencils

Production level Quantity

Unit Number

description

.1

12.000000

PC

P1X34

Pointy Pencil

.1

0.000500

PC

PX335

Pointy shinkwrap

.1

0.060000

PC

P12X

1.000000

GS

FPOINT

Pre-packging
Pointy Pencils

Shrinkwrap

Pencils

Carton

White dip paint Black dip paint Pre-finish pencils Gold foil

Pointy carton

.1

Inners

..2

0.008000

KG

DLP

White dip paint

..2

0.030000

KG

DLP

Black dip paint

..2

0.030000

PC

GFP

Pointy gold foil

..2

1.000000

GS

PPOINT

Pre-finishing
Pointy Pencils

...3

0.100000

KG

PLP

Red polishing varnish ...3

0.070000

KG

SLP

Black stripe lacquer ...3

1.000000

GS

RPOINT

0.070000

PC

0.000500

KG

WW8G

1.000000

GS

SPOINT

Wood slats–CCPP

Wood glue

Pointy Pencil slips Wood glue

....4

Black stripe lacquer CCPPP4 Wood slats – CCP

....4

Pre-polishing pencils Pre-polishing
Pointy Pencils

....4

Red polishing varnish Pointy Pencil slips Product/component structure for Pointy Pencils Box of 10

Units: PC = suppliers’ unit; KG = kilogram; GS = gross of pencils.

Inventory records
The bill of materials file therefore provides MRP with the base data on the ingredients or structure of products. Rather than simply taking these ingredients and multiplying them up in line with demand to determine the total materials requirements, MRP recognizes that some of the required items may already be in stock. This stock may be in the form of finished goods, workin-progress or raw materials. It is necessary, starting at level 0 of each bill, to check how much inventory is available of each finished product, sub-assembly and component, and then to calculate what is termed the ‘net’ requirements – the extra requirements needed to supplement the inventory so that demand can be met. To do this, MRP requires that inventory records are kept.
There are three main files kept in MRP systems that help to manage inventory:
Item master file

G

The item master file – contains the unique standard identification code for each part or component. In addition to a part number, the item master file contains all the stable data on a part, including the part description, the unit of measure (flour may be recorded in tonnes, washers in 1000s and engines in single discrete units) and a standard cost.

447

CH14.QXD

9/24/07

11:56 AM

Page 448

.

448

Part Three Planning and control
The transaction file

G

G

The location file

The transaction file – keeps a record of receipts into stock, issues from stock and a running balance. This means the transaction file is updated at the time a receipt or issue occurs.
The location file – identifies where inventory is located. Some operations have fixed locations so that a particular part can always be found at a particular location. But those which cannot do this may simply locate parts in the most convenient place. This requires careful control, as the same item may be kept in several different locations at any one time.

MRP calculations

MRP netting process
The process of calculating net requirements using the master production schedule and the bills of material.

At its core, MRP is a systematic process of taking this planning information and calculating the volume and timing requirements which will satisfy demand. This next part of the chapter examines the way these calculations are performed, starting with what is probably the most important step, the MRP netting process.

The MRP netting process
Figure 14.8 illustrates the process that MRP performs to calculate the volumes of materials required. The master production schedule is ‘exploded’, examining the implications of the schedule through the bill of materials, checking how many sub-assemblies and parts are required. Before moving down the bill of materials to the next level, MRP checks how many of the required parts are already available in stock. It then generates ‘works orders’, or requests, for the net requirements of items. These form the schedule which is again exploded

Level 0
Master production schedule
10 board games (00289) required Works order for level 0 parts
Assemble 20 board games
(00289)

Inventory file
3 board games (00289) in stock Level 1
Bill of materials
Require 20 box base assemblies (10089)

Works and purchase orders for level 1 parts
Assemble 50 box base assemblies (10089)

Inventory file
10 box base assemblies
(10089) in stock

Level 2
Bill of materials
Require 50 box bases
(20467), 50 inner trays
(23988), and 50 TV labels
(10062)

Works and purchase orders for level 2 parts
Purchase 40 box bases (20467) and 60 inner trays (23988)

Figure 14.8 Example of the MRP netting process for the board game

Inventory file
15 box bases, 4 inner trays, and 65 TV labels in stock

= re-order quantity

9/24/07

11:56 AM

Page 449

.

Chapter 14 Enterprise resource planning (ERP)

through the bill of materials at the next level down. This process continues until the bottom level of the bill of materials is reached.
Back-scheduling

In addition to calculating the volume of materials required, MRP considers when each of these parts is required, that is, the timing and scheduling of materials. It does this by a process called back-scheduling which takes into account the lead time (the time allowed for completion of each stage of the process) at every level of assembly. Again using the example of the board game, assume that ten board games are required to be finished by a notional planning day which we will term day 20. To determine when we need to start work on all the parts that make up the game, we need to know all the lead times that are stored in MRP files for each part (see Table 14.7).
Using the lead-time information, the programme is worked backwards to determine the tasks that have to be performed and the purchase orders that have to be placed. Given the lead times and inventory levels shown in Table 14.7, the MRP records shown in Figure 14.9 can be derived.
Table 14.7 Back-scheduling of requirements in MRP
Part no.

Description

00289
10077
10089
20467
23988
10062
10023
10045
10067
10033
10056

Board game
Box lid
Box base assy
Box base
Inner tray
TV label
Quest cards set
Character set
Die
Game board
Rules booklet

Inventory on-hand day 0

Lead time
(days)

Re-order quantity 3
4
10
15
4
65
4
46
22
8
0

2
8
4
12
14
8
3
3
5
15
3

20
25
50
40
60
100
50
50
80
50
80

MRP capacity checks
The MRP process needs a feedback loop to check whether a plan was achievable and whether it has actually been achieved. Closing this planning loop in MRP systems involves checking production plans against available capacity and, if the proposed plans are not achievable at any level, revising them (see Figure 14.10). All but the simplest MRP systems are now closed-

Source: Tibbett and Britten

CH14.QXD

A call centre operator entering customer orders directly into an ERP system

449

CH14.QXD

9/24/07

11:56 AM

Page 450

.

450

Part Three Planning and control

00289: Treasure Hunt game
Day Number:

0

Assembly lead time = 2 Re-order quantity = 20
1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

Requirements Gross

20
10

Scheduled Receipts
On hand Inventory

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

Planned Order Release
10077: Box lid
Day Number:

3

3

13

19

20

20
Purchase lead time = 8 Re-order quantity = 25
0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

Requirements Gross

18
20

Scheduled Receipts
On hand Inventory

4

4

4

4

4

4

4

4

4

4

Planned Order Release
10089: Box base assembly
Day Number:

4

4

4

4

4

4

4

4

9

9

9

13

14

15

16

17

18

19

20

25
Assembly lead time = 4 Re-order quantity = 50
0

1

2

3

4

5

6

7

8

9

10

11

12

Requirements Gross

20

Scheduled Receipts
On hand Inventory

10

10

10

10

10

10

10

10

10

10

10

10

10

10

Planned Order Release

10

10

10

40

40

40

15

16

17

18

19

20

50

20467: Box base
Day Number:

10

Purchase lead time = 12 Re-order quantity = 40
0

1

2

3

4

5

6

7

8

9

10

11

12

13

Requirements Gross

14
50

Scheduled Receipts
On hand Inventory

15

15

Planned Order Release

15

23988: Inner tray
Day Number:

15

15

15

15

15

15

15

15

15

15

15

5

5

5

5

5

5

5

13

14

15

16

17

18

19

20

40
Purchase lead time = 14 Re-order quantity = 60
0

1

2

3

4

5

6

7

8

9

10

11

12

Requirements Gross

50

Scheduled Receipts
On hand Inventory

4

Planned Order Release

60

4

4

4

1

2

3

10062: TV label
Day Number:

4

4

4

4

4

4

4

4

4

4

14

14

14

14

14

14

14

13

14

15

16

17

18

19

20

Purchase lead time = 8 Re-order quantity = 100
0

4

5

6

7

8

9

10

11

12

Requirements Gross

50

20

Scheduled Receipts
On hand Inventory

65

65

65

65

65

65

65

65

65

65

Planned Order Release
10023: Quest card set
Day Number:

65

65

65

65

15

15

15

15

95

95

95

13

14

15

16

17

18

19

20

100
Purchase lead time = 3 Re-order quantity = 50
0

1

2

3

4

5

6

7

8

9

10

11

12

Requirements Gross

20

Scheduled Receipts
On hand Inventory

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

Planned Order Release
10045: Character set
Day Number:

4

4

4

34

34

34

16

17

18

19

20

50
Purchase lead time = 3 Re-order quantity = 50
0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Requirements Gross

20

Scheduled Receipts
On hand Inventory

46

46

46

46

0

1

2

3

46

46

46

46

46

46

46

46

46

46

46

46

46

46

26

26

26

13

14

15

16

17

18

19

20

Planned Order Release
10067: Die
Day Number:

Purchase lead time = 5 Re-order quantity = 80
4

5

6

7

8

9

10

11

12

Requirements Gross

40

Scheduled Receipts
On hand Inventory

3

3

3

3

3

3

3

3

3

3

3

3

3

Planned Order Release
10033: Game board
Day Number:

3

3

3

3

3

3

3

13

14

15

16

17

18

19

20

80
Purchase lead time = 15 Re-order quantity = 50
0

1

2

3

4

5

6

7

8

9

10

11

12

13

Requirements Gross

20

Scheduled Receipts
On hand Inventory

8

8

8

Planned Order Release

8

10056: Rules booklet
Day Number:

8

8

8

8

8

8

8

8

8

8

8

8

8

8

38

38

38

13

14

15

16

17

18

19

20

60

60

50
Purchase lead time = 3 Re-order quantity = 80
0

1

2

3

4

5

6

7

8

9

10

11

12

Requirements Gross

20

Scheduled Receipts
On hand Inventory

0

0

0

0

0

0

0

0

0

0

0

Planned Order Release

Figure 14.9 Extract of the MRP records for the board game

0

0

0

0

0
80

0

0

60

CH14.QXD

9/24/07

11:56 AM

Page 451

.

Chapter 14 Enterprise resource planning (ERP)

Materials plan Capacity plan We wish to make 300 board games a month.

Production plan Realistic?

Resource requirements plan

Can we make
300 board games a month? What resources do we need?

We wish to make seven board games for day 35.

Master production plan

Realistic?

Rough-cut capacity plan

Can we make seven board games for day 35?

Therefore we ll need to make five box assemblies for week 33.

Materials plan Realistic?

Capacity requirements plan

Can we make five box assemblies for week 33?

Figure 14.10 Closed-loop MRP

loop systems. They use three planning routines to check production plans against the operation’s resources at three levels:
G

G

G

resource requirements plans (RRPs) involve looking forward in the long term to predict the requirements for large structural parts of the operation, such as the numbers, locations and sizes of new plants; rough-cut capacity plans (RCCPs) are used in the medium to short term to check the master production schedules against known capacity bottlenecks, in case capacity constraints are broken. The feedback loop at this level checks the MPS and key resources only; capacity requirements plans (CRPs) look at the day-to-day effect of the works orders issued from the MRP on the loading individual process stages.

Manufacturing resource planning (MRP II)

MRP II

MRP was essentially aimed at the planning and control of production and inventory in manufacturing businesses. However, the concepts have been extended to other areas of the business. This extended concept was termed MRP II by Oliver Wight, one of the founders of
MRP. Wight2 defined MRP II as ‘a game plan for planning and monitoring all the resources of a manufacturing company: manufacturing, marketing, finance and engineering. Technically it involves using the closed-loop MRP system to generate the financial figures.’
Without MRP II integrated systems, separate databases are held by different functions.
For example, a product structure or bill of materials is held in engineering and also in materials management. If engineering changes are made to the design of products, both databases have to be updated. It is difficult to keep both databases entirely identical and discrepancies between them cause problems, which often are not apparent until a member of staff is supplied with the wrong parts to manufacture the product. Similarly, cost information from finance and accounting, which is used to perform management accounting tasks such as variance analysis against standard costs, needs to be reconciled with changes made elsewhere in the operation, such as changes in inventory-holding or process methods.

451

CH14.QXD

9/24/07

11:56 AM

Page 452

.

452

Part Three Planning and control

MRP II is based on one integrated system containing a database which is accessed and used by the whole company according to individual functional requirements. However, despite its dependence on the information technologies which allow such integration, MRP
II still depends on people-based decision making to close the loop.

Enterprise resource planning (ERP)
Enterprise resource planning (ERP)
The integration of all significant resource planning systems in an organization that, in an operations context, integrates planning and control with the other functions of the business.

Enterprise resource planning has been defined as ‘a complete enterprise-wide business solution. The ERP system consists of software support modules such as marketing and sales, field service, product design and development, production and inventory control, procurement, distribution, industrial facilities management, process design and development, manufacturing, quality, human resources, finance and accounting, and information services. Integration between the modules is stressed without the duplication of information’.3
ERP is very much a development out of MRP II, which itself was a development out of
MRP. Its aim is to integrate the management of different functions within the business as a whole in order to improve the performance of all the interrelated processes in a business. As usual, the improvement of processes can be measured using the operations performance objectives (quality, speed, dependability, flexibility and cost).

The benefits of ERP
ERP is generally seen as having the potential to very significantly improve the performance of many companies in many different sectors. This is partly because of the very much enhanced visibility that information integration gives, but it is also a function of the discipline that ERP demands. Yet this discipline is itself a ‘double-edged’ sword. On one hand, it
‘sharpens up’ the management of every process within an organization, allowing best practice (or at least common practice) to be implemented uniformly through the business. No longer will individual idiosyncratic behaviour by one part of a company’s operations cause disruption to all other processes. On the other hand, it is the rigidity of this discipline that is both difficult to achieve and (arguably) inappropriate for all parts of the business.
Nevertheless, the generally accepted benefits of ERP are usually held to be the following:
G

G

G

G

G

Because software communicates across all functions, there is absolute visibility of what is happening in all parts of the business.
The discipline of forcing business process-based changes (Chapters 1 and 18 look at business process) is an effective mechanism for making all parts of the business more efficient.
There is better ‘sense of control’ of operations that will form the basis for continuous improvement (albeit within the confines of the common process structures).
It enables far more sophisticated communication with customers, suppliers and other business partners, often giving more accurate and timely information.
It is capable of integrating whole supply chains including suppliers’ suppliers and customers’ customers.

In fact, although the integration of several databases lies at the heart of ERP’s power, it is nonetheless difficult to achieve in practice. This is why ERP installation can be particularly expensive. Attempting to get new systems and databases to talk to old (sometimes called legacy) systems can be very problematic. Not surprisingly, many companies choose to replace most, if not all, of their existing systems simultaneously. New common systems and relational databases help to ensure the smooth transfer of data between different parts of the organization.
In addition to the integration of systems, ERP usually includes other features which make it a powerful planning and control tool:

CH14.QXD

9/24/07

11:56 AM

Page 453

.

Chapter 14 Enterprise resource planning (ERP)
G

G

G

G

G

453

It is based on a client/server architecture; that is, access to the information systems is open to anyone whose computer is linked to central computers.
It can include decision-support facilities (see Chapter 8) which enable operations decision makers to include the latest company information.
It is often linked to external extranet systems, such as the electronic data interchange systems which are linked to the company’s supply chain partners.
It can be interfaced with standard applications programs which are in common use by most managers, such as spreadsheets, etc.
Often, ERP systems are able to operate on most common platforms such as Windows or
UNIX or Linux.

Short case The life and times of a chicken salad sandwich – Part two
4

In Chapter 10 we looked at the schedule for the manufacture of a chicken salad sandwich. This concentrated on the lead times for the ordering of the ingredients and the manufacturing schedule for producing the sandwiches during the afternoon and night time of each day for delivery during the evening and the night time and the morning of the following day. But that is only one half of the story, the half that is concerned with planning and controlling the timing of events. The other half concerns how the sandwich company manages the quantity of ingredients to order, the quantity of

sandwiches to be made and the whole chain of implications for the whole company. In fact, this sandwich company uses an ERP system that has at its core an MRP II package. This
MRP II system has the two normal basic drivers of first, a continually updated sales forecast and second, a product structure database. In this case the product structure and/or bill of materials is the ‘recipe’ for the sandwich; within the company this database is called the ‘recipe management system’. The ‘recipe’ for the chicken sandwich (its bill of materials), is shown in Table 14.8.

Table 14.8 Bill of Materials for a chicken salad sandwich
FUNCTION: MBIL

MULTI-LEVEL BILL INQUIRY

PARENT: BTE80058
RV:
PLNR: LOU

UM: EA

DESC:
RUN LT:
PLN POL: N

HE CHICKEN SALAD TRAY
0
FIXED LT:
0
DRWG: WA1882

LEVEL
1. . . 5. . . 10

PT
USE

SEQN

COMPONENT

C
T

PARTIAL
DESCRIPTION

1

PACK
ASSY
HRPR
ASSY
ASSY
ASSY
HRPR
ASSY
ALTI
HRPR
ASSY
ALTI
TRAN
ASSY
HRPR
ASSY
ASSY
ASSY
ASSY
PACK
PACK

010
010
010
020
030
040
010
050
010
010
060
010
010
070
010
080
090
100
110
010
030

FTE80045
MBR–0032
RBR–0023
RDY–0001
RMA–0028
MFP–0016
RFP–0008
MVF–0063
RVF–0026
RVF–0018
MVF–0059
RVF–0027
RVF–0017
MVF–0073
RVF–0015
RPA–0070
RPA–0071
RLA–0194
RLA–0110
RPA–0259
RPA–0170

P
P
N
N
N
P
N
P
P
N
P
P
N
P
N
N
N
N
N
N
N

H.E. CHICKENS
BREAD HARVESTE
BREAD HARVESTE
SPREAD BUTTER
MAYONNAISE MYB
CHICKEN FRESH
CHICKEN FRESH
TOMATO SLICE 4
TOMATOES PRE-S
TOMATOES
CUCUMBER SLICE
CUCUMBER SLICE
CUCUMBER
LETTUCE COS SL
LETTUCE COS
WEBB BASE GREY
WEBB TOP WHITE
LABEL SW H
STICKER NE
SOT LABELL
TRAY GREEN

2
3
2
2
2
3
3
4
2
3
4
2
3
2
2
2
2
1
1

LA

QTY

UM

9
2
.04545455
.006
.01
.045
1
3
.007
1
2
.004
1
.02
1
.00744
.00116
1
1
1
1

EA
SL
EA
KG
KG
KG
KG
SL
KG
KG
SL
KG
KG
KG
KG
KG
KG
EA
EA
EA
EA

CH14.QXD

9/24/07

11:56 AM

Page 454

.

454

Part Three Planning and control

Figure 14.11 shows the ERP system used by this sandwich company. Orders are received from customers electronically through the EDI (see Chapter 8) system.
These orders are then checked through what the company calls a validation system that checks the order against current product codes and expected quantities to make sure that the customer has not made any mistakes, such as forgetting to order some products (this happens surprisingly often). After validation the orders are transferred through the central database to the MRP II system that performs the main requirements breakdown.
Based on these requirements and forecasted requirements for the next few day, orders are placed to the company’s suppliers for raw materials and packaging.
Simultaneously, confirmation is sent to customers, accounts are updated, staffing schedules are finalized for the next two weeks (on a rolling basis), customers are invoiced and all this information is made available both to

the customers’ own ERP systems and the transportation company’s planning system.
Interestingly, the company, like many others, found it difficult to implement its ERP system. ‘It was a far bigger job than we thought,’ said the operations director. ‘We had to change the way we organized our processes so that they would fit in with the ERP system that we bought. But that was relatively easy compared with making sure that the system integrated with our customers’, suppliers’ and distributors’ systems. Because some of these companies were also implementing new systems at the time, it was like trying to hit a moving target.’
Nevertheless, three years after the start of implementation, the whole process was working relatively smoothly.

Question
1 Why do you think that fitting an ERP system with those of suppliers and customers is so difficult?

To distribution company Distribution planning MRP II system Accounts and invoicing system

To customers

To suppliers

Purchasing system Common database Order validation EDI orders from customers

Plant and facilities management

Recipe management systems (RMS)

Sales and marketing system

To customers

From customers

Figure 14.11 The ERP structure for the sandwich company

ERP changes the way companies do business
Arguably the most significant issue in many companies’ decision to buy an off-the-shelf ERP system is that of its compatibility with the company’s current business processes and practices. The advice emerging from the companies that have adopted ERP (either successfully or unsuccessfully) is that it is extremely important to make sure that their current way of doing business will fit (or can be changed to fit) with a standard ERP package. In fact, one of the most common reasons for companies to decide not to install ERP is that they cannot reconcile the assumptions in the software of the ERP system with their core business processes. If, as most businesses find, their current processes do not fit, they can do one of two things.
They could change their processes to fit the ERP package. Alternatively, they could modify the software within the ERP package to fit their processes.
Both of these options involve costs and risks. Changing business practices that are working well will involve reorganization costs as well as introducing the potential for errors to creep into the processes. Adapting the software will both slow down the project and introduce potentially dangerous software ‘bugs’ into the system. It would also make it difficult to upgrade the software later on.

CH14.QXD

9/24/07

11:56 AM

Page 455

.

Chapter 14 Enterprise resource planning (ERP)

Why did companies invest in ERP?

If one accepts only some of the criticisms of ERP outlined in the critical commentary box, it does pose the question as to why companies invested such large amounts of money in it.
Partly it was the attraction of turning the company’s information systems into a ‘smooth running and integrated machine’. The prospect of such organizational efficiency is attractive to most managers, even if it does presuppose a very simplistic model of how organizations work in practice. After a while, although organizations could see the formidable problems in
ERP implementation, the investments were justified on the basis that ‘even if we gain no significant advantage by investing in ERP, we will be placed at a disadvantage by not investing in it because all our competitors are doing so’. There is probably some truth in this; sometimes businesses have to invest just to stand still.

Critical commentary
Far from being the magic ingredient which allows operations to fully integrate all their information, ERP is regarded by some as one of the most expensive ways of getting zero or even negative return on investment. For example, the American chemicals giants Dow
Chemical spent almost $500 million and seven years implementing an ERP system which became outdated almost as soon as it was implemented. One company, FoxMeyer Drug, claimed that the expense and problems which it encountered in implementing ERP eventually drove it into bankruptcy.
One problem is that ERP implementation is expensive. This is partly because of the need to customize the system, understand its implications for the organization and train staff to use it. Spending on what some call the ERP ecosystem (consulting, hardware, networking and complementary applications) has been estimated as being twice the spending on the software itself. But it is not only the expense which has disillusioned many companies, it is also the returns they have had for their investment. Some studies show that the vast majority of companies implementing ERP are disappointed with the effect it has had on their businesses. Certainly many companies find that they have to (sometimes fundamentally) change the way they organize their operations in order to fit in with ERP systems. This organizational impact of ERP (which has been described as the corporate equivalent of root-canal work) can have a significantly disruptive effect on the organization’s operations.

Web-integrated ERP
Perhaps the most important justification for embarking on ERP is the potential it gives the organization to link up with the outside world. For example, it is much easier for an operation to move into internet-based trading if it can integrate its external internet systems into its internal ERP systems. However, as some critics of the ERP software companies have pointed out, ERP vendors were not prepared for the impact of e-commerce and had not made sufficient allowance in their products for the need to interface with internet-based communication channels. The result of this has been that whereas the internal complexity of
ERP systems was designed to be intelligible only to systems experts, the internet has meant that customers and suppliers (who are non-experts) are demanding access to the same information. So, important pieces of information such as the status of orders, whether products are in stock, the progress of invoicing, etc. need to be available, via the ERP system, on a company’s website.
One problem is that different types of external company often need different types of information. Customers need to check the progress of their orders and invoicing, whereas

455

CH14.QXD

9/24/07

11:56 AM

Page 456

.

456

Part Three Planning and control

Web-integrated ERP
Enterprise resource planning that is extended to include the ERP type systems of other organizations such as customers and suppliers.

suppliers and other partners want access to the details of operations planning and control.
Not only that, but they want access all the time. The internet is always there, but webintegrated ERP systems are often complex and need periodic maintenance. This can mean that every time the ERP system is taken off-line for routine maintenance or other changes, the website also goes off-line. To combat this some companies configure their ERP and ecommerce links in such a way that they can be decoupled so that ERP can be periodically shut down without affecting the company’s web presence.

Supply chain ERP
The step beyond integrating internal ERP systems with immediate customers and suppliers is to integrate all the ERP and similar systems along a supply chain. Of course, this can never be straightforward and is often exceptionally complicated. Not only do different ERP systems have to communicate, they have to integrate with other types of system. For example, sales and marketing functions often use systems such as customer relationship management
(CRM, see Chapter 13) which manage the complexities of customer requirements, promises and transactions. Getting ERP and CRM systems to work together is itself often difficult.
Sometimes the information from ERP systems has to be translated into a form that CRM and other e-commerce applications are able to understand. Nevertheless, such webintegrated ERP or c-commerce applications are emerging and starting to make an impact on the way companies do business.
Although a formidable task, the benefits are potentially great. The costs of communicating between supply chain partners could be dramatically reduced and the potential for avoiding errors as information and products move between partners in the supply chain is significant. Yet as a final warning note, it is well to remember that although integration can bring all the benefits of increased transparency in a supply chain, it may also transmit systems failure. If the ERP system of one operation within a supply chain fails for some reason, it may block the effective operation of the whole integrated information system throughout the chain.

Optimized production technology (OPT)

Theory of constraints
(TOC)
Philosophy of operations management that focused attention on capacity constraints or bottleneck parts of an operation; uses software known as optimized production technology (OPT).

Optimized production technology (OPT)
Software and concept originated by Eliyahu Goldratt to exploit his theory of constraints (TOC).

Other concepts and systems have been developed which also recognize the importance of planning to known capacity constraints rather than overloading part of the production system and failing to meet the plan. Perhaps the best known is the theory of constraints
(TOC) which has been developed to focus attention on the capacity constraints or bottleneck parts of the operation. By identifying the location of constraints, working to remove them, then looking for the next constraint, an operation is always focusing on the part that critically determines the pace of output. The approach which uses this idea is called optimized production technology (OPT). Its development and the marketing of it as a proprietary software product were originated by Eliyahu Goldratt.5 In some ways it is difficult to know where to place OPT in this book. We have placed it alongside ERP because of the importance it places on capacity. Yet it can be seen as being the third approach (along with ERP and JIT, which is treated in the next chapter) to operations planning and control.
However, along with JIT, OPT takes a more ‘improvement-oriented’ approach than ERP.
OPT is a computer-based technique and tool which helps to schedule production systems to the pace dictated by the most heavily loaded resources, that is, bottlenecks. If the rate of activity in any part of the system exceeds that of the bottleneck, then items are being produced that cannot be used. If the rate of working falls below the pace at the bottleneck, then the entire system is under-utilized.
There are principles underlying OPT which demonstrate this focus on bottlenecks.

CH14.QXD

9/24/07

11:56 AM

Page 457

.

Chapter 14 Enterprise resource planning (ERP)

OPT principles

1 Balance flow, not capacity. It is more important to reduce throughput time rather than achieving a notional capacity balance between stages or processes.
2 The level of utilization of a non-bottleneck is determined by some other constraint in the system, not by its own capacity. This applies to stages in a process, processes in an operation and operations in a supply network.
3 Utilization and activation of a resource are not the same. According to the TOC a resource is being utilized only if it contributes to the entire process or operation creating more output. A process or stage can be activated in the sense that it is working, but it may only be creating stock or performing other non-value-added activity.
4 An hour lost (not used) at a bottleneck is an hour lost for ever out of the entire system.
The bottleneck limits the output from the entire process or operation, therefore the under-utilization of a bottleneck affects the entire process or operation.
5 An hour saved at a non-bottleneck is a mirage. Non-bottlenecks have spare capacity anyway. Why bother making them even less utilized?
6 Bottlenecks govern both throughput and inventory in the system. If bottlenecks govern flow, then they govern throughput time, which in turn governs inventory.
7 You do not have to transfer batches in the same quantities as you produce them. Flow will probably be improved by dividing large production batches into smaller ones for moving through a process.
8 The size of the process batch should be variable, not fixed. Again, from the EBQ model, the circumstances that control batch size may vary between different products.
9 Fluctuations in connected and sequence-dependent processes add to each other rather than averaging out. So, if two parallel processes or stages are capable of a particular average output rate, in parallel they will never be able to achieve the same average output rate.
10 Schedules should be established by looking at all constraints simultaneously. Because of bottlenecks and constraints within complex systems, it is difficult to work out schedules according to a simple system of rules. Rather, all constraints need to be considered together. OPT should not be viewed as a replacement to MRP; nor is it impossible to run both together. However, the philosophical underpinnings of OPT outlined above do show that it could conflict with the way that many businesses run their MRP systems in practice. While
MRP as a concept does not prescribe fixed lead times or fixed batch sizes, many operations run
MRP with these elements fixed for simplicity. However, demand, supply and the process within a manufacturing operation all present unplanned variations on a dynamic basis; therefore, bottlenecks are dynamic, changing their location and their severity. For this reason, lead times are rarely constant over time. Similarly, if bottlenecks determine schedules, batch sizes may alter throughout the plant depending on whether a work centre is a bottleneck or not.
OPT uses the terminology of ‘drum, buffer, rope’ to explain its planning and control approach (we explained this idea in Chapter 10). Briefly, the bottleneck work centre becomes a ‘drum’, beating the pace for the rest of the factory. This ‘drum beat’ determines the schedules in non-bottleneck areas, pulling through work (the rope) in line with the bottleneck capacity, not the capacity of the work centre. A bottleneck should never be allowed to be working at less than full capacity; therefore, inventory buffers should be placed before it to ensure that it never runs out of work.
Some of the arguments for using OPT in MRP environments are that it helps to focus on critical constraints and that it reduces the need for very detailed planning of non-bottleneck areas, therefore cutting down computational time in MRP. The effect of this is to concentrate on major areas of inefficiency such as bottlenecks, quality, set-up times and so on. Nor does it necessarily require large investment in new process technology. Because it attempts to improve the flow of products through a system, it can release inventory that in turn releases invested capital. Claims of the financial payback from OPT are often based on this release of capital and fast throughput.

457

You May Also Find These Documents Helpful

  • Satisfactory Essays

    To ensure that all team members can work cooperatively together. Communication is key for a successful completion.…

    • 717 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Erp/405 Research Paper

    • 376 Words
    • 2 Pages

    Enterprise Resource Planning (ERP) connects - networks internal and external management information across an entire organization, organizing different functions like finance/accounting, manufacturing, marketing, sales and service, etc. ERP systems automate this activity with an integrated software System that integrates different nooks & corners of the Organization it exists. Its purpose is to facilitate the flow of information amongst all the business departments / functions wihin the boundaries of the organization and manage the integration with the internal & external stakeholders in the…

    • 376 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    It is therefore crucial that you make sure the information is correct, relevant and current to your outcome.…

    • 1409 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    Information ownership – The communications produced need to contain the right information to go with them and they need to make sure that all the information is legal and none of it is copyrighted, it then needs to be kept secure and safe within the business it then needs to make sure that the communications go to the right people to be produced and checked over.…

    • 324 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Erp Implementation

    • 8034 Words
    • 33 Pages

    Drummond University (DU) was founded in 1892 in a small town in the Midwest. The university began as a teacher preparatory school, but over the years added both professional and liberal arts programs. Capitalizing on its small-town setting and diverse educational programs, the university has grown to become one of the largest regional universities in the Midwest. The university now enrolls approximately 18,000 students, of which 15% are graduate students. The school…

    • 8034 Words
    • 33 Pages
    Powerful Essays
  • Better Essays

    Tda 3.1 Essay

    • 2719 Words
    • 11 Pages

    Whether the information is shared within the organization, with other professionals or other organisations or authorities.…

    • 2719 Words
    • 11 Pages
    Better Essays
  • Powerful Essays

    Erp System in Cvs

    • 2352 Words
    • 10 Pages

    ERP (Enterprise Resource Planning) software system aims in integrating the vital functions of an enterprise leading to a better communication and flow of data through the different units of an enterprise, regardless of their geographical locations. A standard ERP system constitutes of a software component, hardware infrastructure and a process documentation component. An ERP package integrates several functions like production, finance and accounts, supply chain management, asset management, logistics and many more. Different types of ERP software are available in the market catering to the needs of all types of business and corporate houses. Large global organizations require complex ERP package to support more functions than the small and medium sized enterprises.…

    • 2352 Words
    • 10 Pages
    Powerful Essays
  • Good Essays

    Kammy

    • 334 Words
    • 2 Pages

    -Planning would provide a standard of measurement and it provides something to measure against so that we can discover whether or not we are achieving our goals.…

    • 334 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Sustinable Developmen

    • 5396 Words
    • 22 Pages

    tSustainable Development Sust. Dev. 10, 187–196 (2002) Published online in Wiley InterScience (www.interscience.wiley.com). DOI: 10.1002/sd.199…

    • 5396 Words
    • 22 Pages
    Powerful Essays
  • Good Essays

    implementation ERP

    • 964 Words
    • 4 Pages

    They faced challenges from acquiring many companies because during the acquisitions Bombardier inherited the data, processes and systems of each company which created inefficiencies. Systems didn’t communicate with each other resulting in low inventory turns and price inconsistency. This was not productive for Bombardier and was time consuming for the employees. The biggest problem was the low visibility of inventory and the lack of communication between systems. Bombardier had now a global presence but was not organized to maintain growth without changing the vision and processes. Another challenge is resistance to change, this factor can have a huge impact on the new vision and processes. Management must be part of the new vision and must pass this message to employees in order for this to work. Involvement of employees must be considered and planned in order to succeed.…

    • 964 Words
    • 4 Pages
    Good Essays
  • Good Essays

    All of the information I get will be used for some of the following reasons:…

    • 596 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    How an organization goes about accomplishing a plan is a key part of the management function of controlling.…

    • 11650 Words
    • 47 Pages
    Satisfactory Essays
  • Better Essays

    HomeStyle Hotels

    • 1615 Words
    • 5 Pages

    Kimberling, E. (2008). 7 steps to choosing the right ERP software. Retrieved October 6, 2014,…

    • 1615 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Planning and controlling are two separate functions of management, yet they are closely related. The scope of activities if both is overlapping to each other. Without the basis of planning, controlling activities becomes baseless and without…

    • 1132 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    The most important issues to consider however are those concerned with the nature of planning and control. Although planning and control are two separate activities, in practice, very difficult to separate.. These determined the ‘ingredients’ to be put into the operation and how those ‘ingredients’ were going to be positioned relative to each other. Planning and control is the next task – taking the designed operation and making it work on a continuous basis. Planning and control is therefore a dynamic activity.…

    • 805 Words
    • 4 Pages
    Good Essays