Preview

P 00575 Automatic Railway Gate Control

Powerful Essays
Open Document
Open Document
8067 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
P 00575 Automatic Railway Gate Control
AUTOMATIC RAILWAY GATE CONTROLLING AND
SIGNALLING

PROJECT REPORT
SUBMITTED IN PARTIAL FULFILLMENT
OF THE REQUIREMENT FOR THE DEGREE OF
BACHELOR OF TECHNOLOGY
IN
ELECTRONICS AND COMMUNICATION ENGINEERING
BY
S. HEMA LATHA (06261A0448)
RUPA DEVI

(07265A0402)

K.YASWANTHI

(07265A0406)

Department of Electronics and Communication Engineering

MAHATMA GANDHI INSTITUTE OF TECHNOLOGY
(AFFILIATED TO JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY,
HYDERABAD, A.P)

Chaitanya Bharathi P.O., Gandipet, Hyderabad-500 075
2010

1

ABSTRACT

The railway gate is to be controlled so that the road traffic is to be predicted .The railway gate is to be closed when a train is passing by the way. The opening and closing of the gate is to be done using stepper motors and this stepper motor is controlled by micro controller. The signaling of the train is also controlled depending upon the gate position. Only when gate is closed the green signal is otherwise red signal. So in this project the railway signaling includes the gate control is done using microcontroller. The automatic opening and closing of the gate and also the signaling which depending on the gate position that will be controlled by the microcontroller. 2

TABLE OF CONTENTS

CERTIFICATE FROM ECE DEPARTMENT

ACKNOWLEDGEMENT

i

ABSTRACT

ii

LIST OF FIGURES

v

1. INTRODUCTION

1

1.1 Aim of the project

3

1.2

Methodology
3

2. BLOCK DIAGRAM DESCRIPTION

4
2.1. 555 Timer

5

2.1.0. Functional block diagram of 555 timer

5

2.1.1. Block diagram of 555 timer

6

2.1.2. Pin diagram of 5555 timer

6

2.1.3. Description of pins

7

2.2. IR Receiver

8

2.3. Microcontroller

10

2.3.0. Description of 89S52

10

3

2.3.1. Features of microcontroller

11

2.3.2. Block diagram of microcontroller

12

2.3.3. Pin diagram of microcontroller

13

2.3.4. PIN DESCRIPTION

14

2.4. Buzzer alarm

18

2.5. Power supply

18

2.5.0. Transformer

19

2.5.1. Rectifier
20
2.5.2. Smoothing

21

2.5.3. Regulators

22

3. BASIC IDEA

23

3.1 Gate

You May Also Find These Documents Helpful

  • Good Essays

    lights flashing. Wightman noted a s pped train a short distance from the gate. Believing the…

    • 530 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Xc60 Unit 8 Project

    • 568 Words
    • 3 Pages

    In the PC the math lab code is written to get the frequency of different voltages that are produced by brainwave sensor. This is given to the ARM processor by the protocol which is responsible by the UART. The ARM will process the signal and the corresponding emotion is displayed on the LCD display and the speed of the DC motor is reduced or increased based on the voltage and by changing the duty cycle of the PWM signal which is derived by the relay driver and the below diagram represents the serial data transmission to the arm through UART and driving the output to different devices which is responsible by the GPIO. The speed of the wheel is reduced based on the generated frequencies and there cross- ponding emotions by differing the PWM signal which is done by writing the embedded C programme in keil software and it is processed by using the ARM…

    • 568 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Ohio Permits Test

    • 1231 Words
    • 5 Pages

    * If your vehicle stalls while on the tracks and a train is approaching, you must:…

    • 1231 Words
    • 5 Pages
    Good Essays
  • Good Essays

    These gates work by a system similar to radar--by firing out radio waves, but instead of waiting for them to bounce back, they simply wait for an activated tag to come through. The activated tag-- a small, functioning radio transmitter and receiver, will receive the gate’s signal and transmit one of its own, causing the alarms to go off. An inactivated tag, on the other hand, has been disabled at the checkout line by either destroying or deactivating the electronic component in the tag. Though the deactivation process doesn’t always work, the concept itself is simple and…

    • 536 Words
    • 3 Pages
    Good Essays
  • Good Essays

    crossing is coming up. Also, if there is a train coming, there will be flashing lights and…

    • 543 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Rail Road is very important to understand as a driver. If you do not follow rules that are set to protect you from danger, you can face fatal consequences. It is tragic when you see on the news of train related accident because most of all of them are fatal. As a driver you need to be on the look out when you come to a rail way. On the Warning Devices section of Unit 5 rail road crossing it states,"Public railroad crossings have been marked with warning devices for your safety by highway departments and the railroad companies." They are safety devices out there to keep us safe paid for by the highway department. The same section states," Learn what the warning devices are and watch for them. With these warning devices and caution on your part, you can avoid a railroad-crossing crash." These are all part of car and train…

    • 510 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Cascade Locks is a small town, about 2 miles long. It has 1 crossing and it is located at the eastern end of town. On a typical night we have approximately 20 trains go through. For the purpose of this paper, trains heading east will not be included as they sound their whistle on the way out of town therefore causing less disruption. That leaves us with approximately 10 west - bound trains per night.…

    • 753 Words
    • 4 Pages
    Good Essays
  • Good Essays

    To begin with, railroad crossings are marked and shown in many ways to inform you of them. There are advance warning signs that you will encounter prior to the railroad crossing. There are also many pavement markings that can warn you of upcoming railroad crossing. These markings will look like an “X” with the letters “RR”…

    • 355 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    3. Is the cost of positive train control justified by the likely safety gains for passengers?…

    • 825 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Cas Indian railways

    • 6526 Words
    • 27 Pages

    individual freight railcars (wagons) by Indian Railways. After exploring multiple ‘technological options,’ the Indian Railways decided to undertake a pilot project based on timetested Automatic Equipment Identification system using Radio Frequency Identification…

    • 6526 Words
    • 27 Pages
    Good Essays
  • Good Essays

    Arduino Gate

    • 584 Words
    • 3 Pages

    My question is, can I use a DC motor for this sort of task or should I look into AC motors? And what kind of motor should I use? Is this even possible using Arduino?…

    • 584 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Finally, the lecturer moves to explain some successful measures that the government approved with the purpose of reducing congestions. One of the measures was to enable some fast lines in the motorways for cars with more than one occupant. The other one was to charge car user to get access to the city centre from London. Both of the measures were successful and the money that they get from the congestion charging was invested in improving the public transport system.…

    • 270 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Do you want a decorative garden gate or you want to secure your premises by adding automated metal gate? At Ironcrafts Stroud Ltd, we can design and install gates as per your requirement and automate them as well.…

    • 2408 Words
    • 10 Pages
    Powerful Essays
  • Good Essays

    Traffic congestion is one of the main problems in big cities like London, New York, Copenhagen, and Delhi. The primary causes of it are high population and movement of people. With progress in engineering, humanity invents many initiatives to solve this problem. One of the that is public transport area, particularly Metro. The Metro is an underground railway system of the city. According to Business Traveler (2012) the oldest subway was built in London in 1836 and to date the London Metro is the first in the ten top metros of the world. Ahead 2012, in top ten metros of the world there were included subways of Paris, Madrid, Stockholm, Berlin, and Tokyo after the London Metro respectively. The focus of this essay is an evaluating of the effectiveness of underground railway systems in reducing traffic congestion. In order to properly assess the efficiency of metro it is necessary to find, describe, and analyze the transport impact of the metro on car and bus traffic growth and evaluate city traffic in the near and distant future after building a metro.…

    • 954 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    According to the experience of developed countries, rail transit is an effective method to alleviate traffic jam in cities and improve the inhabited environment for citizens. On one…

    • 733 Words
    • 3 Pages
    Satisfactory Essays