requires direct materials costs which total $135 per unit‚ while Alaska’s direct materials requirements total $110 per unit. Direct labor costs per unit are $75 for MaxiFlow and $95 for Alaska. Auerbach Enterprises uses machine hours as the cost driver to assign overhead costs to the air conditioners. The company has used a company-wide predetermined overhead rate in past years‚ but the new controller‚ Bennie Leon‚ is considering the use of departmental overhead rates beginning with the next
Premium Costs Manufacturing Variable cost
THE MANAGEMENT OF OVERHEAD COSTS IN CONSTRUCTION COMPANIES Brian Eksteen1 and David Rosenberg² ¹Professor of Construction Management‚ Faculty of Economic and Building Sciences‚ University of Port Elizabeth‚ P.O. Box 1600‚ Port Elizabeth‚ 6000‚ South Africa ²Senior Lecturer in Cost and Management Accounting‚ Faculty of Economic and Building Sciences‚ University of Port Elizabeth‚ P.O. Box 1600‚ Port Elizabeth‚ 6000‚ South Africa Costs not directly attributable to or recoverable from production
Premium Cost Management accounting Costs
pressure on pricing. Youngstown produced four products in its plant and decided to eliminate products that no longer contributed positive margins. Details on the four products are provided below: A B C D Total Production Volume (units) 10‚000 8‚000 6‚000 4‚000 Selling Price $15.00 $18.00 $20.00 $22.00 Materials/unit $4.00 $5.00 $6.00 $7.00 DLH/unit 0.24 0.18 0.12 0.08 Total DLH 2‚400 1‚440 720 320 4‚880 Plant Overhead $122‚000 DL rate/hour $30 Y oungstown has a tradition al cost sys tem
Premium Cost Mathematics Costs
pressure on pricing. Youngstown produced fours products in its plant and decided to eliminate products that no longer contributed positive margins. Details on the fours products are provided below: Products A B C D Total Production volume (units) 10‚000 8‚000 6‚000 4‚000 Selling Price $15.00 $18.00 $20.00 $22.00 Materials/unit $4.00 $5.00 $6.00 $7.00 DLH/unit 0.24 0.18 0.12 0.08 Total DHL 2‚400 1‚440 720 320 4880 Plant overhead $122‚000 D/L rate/hour $30
Premium Cost Costs Mathematics
This is an introductory case‚ and yet it introduces a powerful new approach for building an ABC model. Considerable theory is illustrated in how we build the Sippican time-driven ABC (TDABC) model. Also‚ the (B) case introduces an important link‚ previously recognized but not exploited‚ in how to embed an ABC model into the budgeting process‚ replacing line-item budgeting with an integrated‚ analytic approach. The case discussion provides insight and confidence about the feasibility of building a
Premium Cost-benefit analysis Cost Employment
have done above is a “full-cost” analysis. This is in contrast to a “direct-cost” analysis that ignores overhead costs. Is full cost the right metric for job profitability and customer profitability? What assumptions are we making about the variability of overhead costs when we do a “full-cost” analysis? By allocating the overhead costs to jobs and customers there is an implicit assumption that these are variable with the cost driver. In reality‚ some of the overhead costs are fixed‚ at least in the
Premium Cost Costs Economics
Ethics; Predetermined Overhead Rate and Capacity Pat Miranda‚ the new controller of Vault Hard Drives‚ Inc.‚ has just returned from a seminar on the choice of the activity level in the predetermined overhead rate. Even though the subject did not sound exciting at first‚ she found that there were some important ideas presented that should get a hearing at her company. After returning from the seminar‚ she arranged a meeting with the production manager‚ J. Stevens‚ and the assistant production manager
Premium Revenue Net income Gross profit
OVERHEAD COSTS ACCOUNTING Overheads are indirect costs which can not directly be traced to cost units. The task of the cost accountant is to charge these overhead costs to cost units/products. There are two approaches of charging overhead costs to cost units Viz i. Traditional/conventional absorption costing method and‚ ii. Activity Based Costing (ABC) Classification of overheads Overheads can be classified as production or non production overheads. Production overheads are those incurred
Premium Cost accounting Management accounting Costs
for predetermined overhead rate -estimated manufacturing overhead cost divided by estimated which of manufacturing overhead -it can‚ it must be a manufacturing‚ indirect labor costs that are easily traced to a job -direct which of indirect labor cost examples -maintenance into which of the companies classify manufacturing cost -direct labor‚ manufacturing‚ direct‚ materials a factor that causes overhead costs is called -cost driver what kinds of costs are assigned to units
Premium Costs Inventory Accounts receivable
Construction assembles residential houses. It uses a job-costing system with two direct-cost categories (direct materials and direct labor) and one indirect-cost pool (assembly support). Direct labor-hours is the allocation base for assembly support costs. In December 2010‚ Amesbury budgets 2011 assembly-support costs to be $8‚300‚000 and 2011 direct labor-hours to be 166‚000. At the end of 2011‚ Amesbury is comparing the costs of several jobs that were started and completed in 2011. Laguna Model
Premium Costs Manufacturing Cost