Top-Rated Free Essay
Preview

Aptitude on Time and Work

Satisfactory Essays
9519 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Aptitude on Time and Work
kTIME AND WORK

MODULE OBJECTIVE:
In this lesson we will discuss one of the most easiest and important topic i.e. WORK. DEFINITION : Technically speaking, Work is the quantity of energy transferred from one system to another but for question based on this topicWork is defined as the amount of job assigned or the amount of job actually done. Problem on work are based on the application of concept of ratio of time and speed.| Work is always considered as a whole or one. There exists an analogy between the timespeed-distance problems and work. Work based problem are more or less related to time speed and distance. Above mentioned definition of work throws light on three important points. Work = 1 ( as it is always measured as a whole) = Distance Rate at which work is done = speed Number of days required to do the work = Time

Formulas:
1. Work from Days: If A can do a piece of work in n days, then A's 1 day's work = 2. Days from Work: 1 If A's 1 day's work = ,then A can finish the work in n days. n 3. Ratio: If A is thrice as good a workman as B, then: Ratio of work done by A and B = 3 : 1. Ratio of times taken by A and B to finish a work = 1 : 3. 4. If A is 'x' times as good a workman as B, then he will take the same work. 5. A and B can do a piece of work in 'a' days and 'b' days respectively, then working together, they will take part of work. days to finish the work and in one day, they will finish of the time by B to do 1 . n

SOLVED EXAMPLES
1) Problem: If 9 men working 6 hours a day can do a work in 88 days. Then 6 men working 8 hours a day can do it in how many days? Solution: From the above formula i.e (m1*t1/w1) = (m2*t2/w2) so (9*6*88/1) = (6*8*d/1) on solving, d = 99 days. 2) Problem: If 34 men completed 2/5th of a work in 8 days working 9 hours a day. How many more man should be engaged to finish the rest of the work in 6 days working 9 hours a day? Solution: From the above formula i.e (m1*t1/w1) = (m2*t2/w2) so, (34*8*9/(2/5)) = (x*6*9/(3/5)) so, x = 136 men number of men to be added to finish the work = 136-34 = 102 men 3) Problem: If 5 women or 8 girls can do a work in 84 days. In how many days can 10 women and 5 girls can do the same work? Solution: Given that 5 women is equal to 8 girls to complete a work. So, 10 women = 16 girls. Therefore 10 women + 5 girls = 16 girls + 5 girls = 21 girls. 8 girls can do a work in 84 days then 21 girls can do a work in (8*84/21) = 32 days. Therefore 10 women and 5 girls can a work in 32 days 4) Problem: Worker A takes 8 hours to do a job. Worker B takes 10 hours to do the same job. How long it take both A & B, working together but independently, to do the same job? Solution: A's one hour work = 1/8. B's one hour work = 1/10. (A+B)'s one hour work = 1/8+1/10 = 9/40. Both A & B can finish the work in 40/9 days 5) Problem: A can finish a work in 18 days and B can do the same work in half the time taken by A. Then,working together, what part of the same work they can finish in a day? Solution: Given that B alone can complete the same work in days = half the time taken by A = 9 days A's one day work = 1/18 B's one day work = 1/9 (A+B)'s one day work = 1/18+1/9 = 1/6

6) Problem: A is twice as good a workman as B and together they finish a piece of work in 18 days.In how many days will A alone finish the work. Solution: if A takes x days to do a work then B takes 2x days to do the same work = > 1/x+1/2x = 1/18 = > 3/2x = 1/18 = > x = 27 days. Hence, A alone can finish the work in 27 days. 7) Problem: A can do a certain work in 12 days. B is 60% more efficient than A. How many days does B alone take to do the same job? Solution: Ratio of time taken by A & B = 160:100 = 8:5 Suppose B alone takes x days to do the job. Then, 8:5::12:x = > 8x = 5*12 = > x = 15/2 days. 8) Problem: A can do a piece of work n 7 days of 9 hours each and B alone can do it in 6 days of 7 hours each. How long will they take to do it working together 8 2/5 hours a day? Solution: A can complete the work in (7*9) = 63 days B can complete the work in (6*7) = 42 days = > A's one hour's work = 1/63 and B's one hour work = 1/42 (A+B)'s one hour work = 1/63+1/42 = 5/126 Therefore, Both can finish the work in 126/5 hours. Number of days of 8 2/5 hours each = (126*5/(5*42)) = 3 days 9) Problem: A takes twice as much time as B or thrice as much time to finish a piece of work. Working together they can finish the work in 2 days. B can do the work alone in ? Solution: Suppose A,B and C take x,x/2 and x/3 hours respectively finish the work then 1/x+2/x+3/x = 1/2 = > 6/x = 1/2 = >x = 12 So, B takes 6 hours to finish the work. 10) Problem: X can do ¼ of a work in 10 days, Y can do 40% of work in 40 days and Z can do 1/3 of work in 13 days. Who will complete the work first? Solution: Whole work will be done by X in 10*4 = 40 days. Whole work will be done by Y in (40*100/40) = 100 days. Whole work will be done by Z in (13*3) = 39 days Therefore, Z will complete the work first.

11) Problem: If A can complete a work in 10 days and B is 100 faster than A. How much time B will take to complete the work?

Solution: A takes to perform 1 work = 10 days. = B will perform the same work = time than A. = B will take to perform the same work = 12) If 10 men are working on a project and can complete the work in 10 days. 5 of them are placed at some other work, then how much time will take remaining to perform the job? Solution: Men at work earlier = 10 Men at work later = 5 Ration of workers = a : b = 2 : 1 10 men can perform the complete task = 10 days 5 men will perform the same task in = b : a time = 1 : 2 => 20 days. 13) Problem : A group of men completes a work in 10 days, but five of them are absent and so the rest do the work in 12 days. Find the original number of Men.

Solution: More men, less days.

= Total men at work =30

14. A can do a certain work in 12 days. B is 60% more efficient than A. How many days does B alone take to do the same job? Solution: Ratio of time taken by A & B = 160:100 = 8:5 Suppose B alone takes x days to do the job. Then, 8:5::12:x = > 8x = 5*12 = > x = 15/2 days.

15) A can do a piece of work n 7 days of 9 hours each and B alone can do it in 6 days of 7 hours each. How long will they take to do it working together 8 2/5 hours a day? Solution: A can complete the work in (7*9) = 63 days B can complete the work in (6*7) = 42 days = > A’s one hour’s work = 1/63 and B’s one hour work = 1/42 (A+B)’s one hour work = 1/63+1/42 = 5/126 Therefore, Both can finish the work in 126/5 hours. Number of days of 8 2/5 hours each = (126*5/(5*42)) = 3 days

EXERCISE PROBLEMS
1. A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is : 1 1 A. B. 4 10 7 8/ C. D. 15 15

1. Answer: Option D Explanation: 1 A's 1 day's work = ; 15 1 B's 1 day's work = ; 20 1 1 7 + = . 15 20 60 7 7 (A + B)'s 4 day's work = x4 = . 60 15 7 8 Therefore, Remaining work = 1 - = . 15 15 (A + B)'s 1 day's work =

2. A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in: 1 2 A.9 days B.9 days 5 5 3 9/5 C. D.10 days

2. Answer: Option C Explanation: 1 (A + B + C)'s 1 day's work = , 4 1 A's 1 day's work = , 16 1 B's 1 day's work = . 12 1 1 1 1 7 5 C's 1 day's work = + = - = . 4 16 12 4 48 48 48 3 So, C alone can do the work in = 9 days. 5 5

3. A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day? A.12 days B.15 days C.16 days D.18 days

Answr: Option B Explanation: 1 1 x2 = . 20 10 1 1 1 6 1 (A + B + C)'s 1 day's work = + + = = . 20 30 60 60 10 1 1 1 Work done in 3 days = + = . 10 10 5 1 Now, work is done in 3 days. 5 A's 2 day's work = Whole work will be done in (3 x 5) = 15 days.

4. A is thrice as good as workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in: 1 A.20 days B.22 days 2 C.25 days D.30 days

. Answer: Option B Explanation: Ratio of times taken by A and B = 1 : 3. The time difference is (3 - 1) 2 days while B take 3 days and A takes 1 day. If difference of time is 2 days, B takes 3 days. If difference of time is 60 days, B takes So, A takes 30 days to do the work. 1 A's 1 day's work = 30 1 B's 1 day's work = 90 (A + B)'s 1 day's work = 1 1 4 2 + = = 30 90 90 45 A and B together can do the work in45= 221days. 3 x 60 = 90 days. 2

2

2

5. A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for Rs. 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C? A.Rs. 375 B.Rs. 400 C.Rs. 600 D.Rs. 800

Answer: Option B Explanation: 1 1 1 1 7 1 C's 1 day's work = - + = - = . 3 6 8 3 24 24 11 1 A's wages : B's wages : C's wages = : : = 4 : 3 : 1. 6 8 24 1 C's share (for 3 days) = Rs. 3 x x 3200 = Rs. 400. 24 6. If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be: A.4 days B.5 days C.6 days D.7 days

6. Answer: Option A Explanation: Let 1 man's 1 day's work = x and 1 boy's 1 day's work = y. 1 1 Then, 6x + 8y = and 26x + 48y = . 10 2 1 1 Solving these two equations, we get : x = and y = . 100 200 15 20 1 (15 men + 20 boy)'s 1 day's work = + = . 100 200 4 15 men and 20 boys can do the work in 4 days.

7. A can do a piece of work in 4 hours; B and C together can do it in 3 hours, while A and C together can do it in 2 hours. How long will B alone take to do it?

A.8 hours C.12 hours

B.10 hours D.24 hours

7. Answer: Option C Explanation: 1 A's 1 hour's work = ; 4 1 (B + C)'s 1 hour's work = ; 3 1 (A + C)'s 1 hour's work = . 2 (A + B + C)'s 1 hour's work = B's 1 hour's work = 7 1 1 - = . 12 2 12 1 1 7 + = . 4 3 12

B alone will take 12 hours to do the work.

8. A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 10 days and C alone in 50 days, then B alone could do it in: A.15 days B.20 days C.25 days D.30 days

8. Answer: Option C Explanation: 1 (A + B)'s 1 day's work = 10 1 C's 1 day's work = 50 (A + B + C)'s 1 day's work = 1 1 6 3 + = = . .... (i) 10 50 50 25

A's 1 day's work = (B + C)'s 1 day's work .... (ii) 3 From (i) and (ii), we get: 2 x (A's 1 day's work) = 25 3 A's 1 day's work = . 50 1 3 2 1 B's 1 day's work - = = . 10 50 50 25

So, B alone could do the work in 25 days

9. A does 80% of a work in 20 days. He then calls in B and they together finish the remaining work in 3 days. How long B alone would take to do the whole work? A.23 days B.37 days C.37 D.40 days

9. Answer: Option C Explanation: 5 Whole work is done by A in 20 x = 25 days. 4 4 1 Now, 1 - i.e., work is done by A and B in 3 days. 5 5 Whole work will be done by A and B in (3 x 5) = 15 days. 1 1 A's 1 day's work = , (A + B)'s 1 day's work = . 25 15 1 1 4 2 B's 1 day's work = = = . 15 25 150 75 So, B alone would do the work in75= 371days.

10. A machine P can print one lakh books in 8 hours, machine Q can print the same number of books in 10 hours while machine R can print them in 12 hours. All the machines are started at 9 A.M. while machine P is closed at 11 A.M. and the remaining two machines complete work. Approximately at what time will the work (to print one lakh books) be finished ? A.11:30 A.M. B.12 noon C.12:30 P.M. D.1:00 P.M.

10. Answer: Option D Explanation: 1 1 1 37 + + = . 8 10 12 120 37 37 Work done by P, Q and R in 2 hours = x2 = . 120 60 37 23 Remaining work = 1 - = . 60 60 1 1 11 (Q + R)'s 1 hour's work = + = . 10 12 60 11 Now, work is done by Q and R in 1 hour. 60 23 60 23 23 So, work will be done by Q and R in x = hours 60 11 60 11 (P + Q + R)'s 1 hour's work =

2 hours.

So, the work will be finished approximately 2 hours after 11 A.M., i.e., around 1 P.M.

11. A can finish a work in 18 days and B can do the same work in 15 days. B worked for 10 days and left the job. In how many days, A alone can finish the remaining work? 1 A.5 B.5 2 C.6 D.8

11. Answer: Option C Explanation: 1 2 x 10 = . 15 3 2 1 Remaining work = 1 - = . 3 3 1 Now, work is done by A in 1 day. 18 1 1 work is done by A in 18 x = 6 days. 3 3 B's 10 day's work =

12. 4 men and 6 women can complete a work in 8 days, while 3 men and 7 women can complete it in 10 days. In how many days will 10 women complete it? A.35 B.40 C.45 D.50

12.Answer: Option B Explanation: Let 1 man's 1 day's work = x and 1 woman's 1 day's work = y. 1 1 Then, 4x + 6y = and 3x + 7y = . 8 10 Solving the two equations, we get: x = 1 woman's 1 day's work = 11 1 ,y= 400 400

1 . 400 1 1 10 women's 1 day's work = x 10 = . 400 40 Hence, 10 women will complete the work in 40 days.

13. A and B can together finish a work 30 days. They worked together for 20 days and then B left. After another 20 days, A finished the remaining work. In how many days A alone can finish the work? A.40 B.50 C.54 D.60

13. Answer: Option D Explanation: 1 2 x 20 = . 30 3 2 1 Remaining work = 1 - = . 3 3 1 Now, work is done by A in 20 days. 3 (A + B)'s 20 day's work = Therefore, the whole work will be done by A in (20 x 3) = 60 days.

14. P can complete a work in 12 days working 8 hours a day. Q can complete the same work in 8 days working 10 hours a day. If both P and Q work together, working 8 hours a day, in how many days can they complete the work? 5 6 A.5 B.5 11 11 5 6 C.6 D.6 11 11

14. Answer: Option A Explanation: P can complete the work in (12 x 8) hrs. = 96 hrs. Q can complete the work in (8 x 10) hrs. = 80 hrs. 1 1 P's1 hour's work = and Q's 1 hour's work = . 96 80 1 1 11 (P + Q)'s 1 hour's work = + = . 96 80 480 480 So, both P and Q will finish the work in hrs. 11 480 1 60 5 Number of days of 8 hours each = x = days = 5 days. 11 8 11 11 15. 10 women can complete a work in 7 days and 10 children take 14 days to complete the work. How many days will 5 women and 10 children take to complete the work? A.3 B.5 C.7 D.Cannot be determined E.None of these 15. Answer: Option C Explanation: 1 70 1 1 child's 1 day's work = 140 1 woman's 1 day's work = (5 women + 10 children)'s day's work = 5 10 1 1 1 + = + = 70 140 14 14 7

5 women and 10 children will complete the work in 7 days.

16. X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days Y joined him till the completion of the work. How long did the work last? A.6 days B.10 days C.15 days D.20 days

16. Answer: Option B Explanation: Work done by X in 4 days = 1 1 x4 = . 20 5

1 4 Remaining work = 1 - = . 5 5 1 1 8 2 (X + Y)'s 1 day's work = + = = . 20 12 60 15 2 Now, work is done by X and Y in 1 day. 15 4 15 4 So, work will be done by X and Y in x = 6 days. 5 2 5 Hence, total time taken = (6 + 4) days = 10 days.

17. A is 30% more efficient than B. How much time will they, working together, take to complete a job which A alone could have done in 23 days? A.11 days B.13 days 3 C.20 days D.None of these 17

17. Answer: Option B Explanation: Ratio of times taken by A and B = 100 : 130 = 10 : 13. Suppose B takes x days to do the work. Then, 10 : 13 :: 23 : x 1 A's 1 day's work = ; 23 10 B's 1 day's work = . 299 (A + B)'s 1 day's work = 1 10 23 1 + = = . 23 299 299 13 x= 23 x 13 10 299 x= . 10

Therefore, A and B together can complete the work in 13 days.

18. Ravi and Kumar are working on an assignment. Ravi takes 6 hours to type 32 pages on a computer, while Kumar takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages? A.7 hours 30 minutes B.8 hours C.8 hours 15 minutes D.8 hours 25 minutes

18. Answer: Option C Explanation: 32 16 Number of pages typed by Ravi in 1 hour = = . 6 3 40 Number of pages typed by Kumar in 1 hour = = 8. 5 16 40 Number of pages typed by both in 1 hour = +8 = . 3 3 3 Time taken by both to type 110 pages = 110 x hours 40 1 = 8 hours (or) 8 hours 15 minutes. 4

19. A, B and C can complete a piece of work in 24, 6 and 12 days respectively. Working together, they will complete the same work in: 1 7 A. day B. day 24 24 3 C.3 days D.4 days 7

19. Answer: Option C Explanation: 1 Formula: If A can do a piece of work in n days, then A's 1 day's work = . n 1 1 1 7 (A + B + C)'s 1 day's work = + + = . 24 6 12 24 1 Formula: If A's 1 day's work = ,then A can finish the work in n days. n 24 3 So, all the three together will complete the job in =3 days. days

20. Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi. The number of days taken by Tanya to do the same piece of work is: A.15 B.16 C.18 D.25

20. Answer: Option B Explanation: Ratio of times taken by Sakshi and Tanya = 125 : 100 = 5 : 4. Suppose Tanya takes x days to do the work. 5 : 4 :: 20 : x x = 16 days. Hence, Tanya takes 16 days to complete the work. x= 4 x 20 5

21. A takes twice as much time as B or thrice as much time as C to finish a piece of work. Working together, they can finish the work in 2 days. B can do the work alone in: A.4 days B.6 days C.8 days D.12 days

21. Answer: Option B Explanation: x x Suppose A, B and C take x, and days respectively to finish the work. 2 3 1 2 3 1 Then, + + = x x x 2 6 1 = x 2 x = 12. So, B takes (12/2) = 6 days to finish the work.

22. A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in : A.8 days B.10 days C.12 days D.15 days

22. Answer: Option C Explanation: (A + B)'s 1 day's work = 1 1 1 + = . 15 10 6 1 1 x2 = . 6 3

Work done by A and B in 2 days =

1 2 Remaining work = 1 - = . 3 3 1 Now, work is done by A in 1 day. 15 2 2 work will be done by a in 15 x = 10 days. 3 3 Hence, the total time taken = (10 + 2) = 12 days.

23. A and B can do a piece of work in 30 days, while B and C can do the same work in 24 days and C and A in 20 days. They all work together for 10 days when B and C leave. How many days more will A take to finish the work? A.18 days B.24 days C.30 days D.36 days

23. Answer: Option A Explanation: 1 1 1 15 1 + + = = . 30 24 20 120 8 1 1 Therefore, (A + B + C)'s 1 day's work = = . 2 x 8 16 10 5 Work done by A, B, C in 10 days = = . 16 8 5 3 Remaining work = 1 - = . 8 8 1 1 1 A's 1 day's work = - = . 16 24 48 1 Now, work is done by A in 1 day. 48 3 3 So, work will be done by A in 48 x = 18 days. 2(A + B + C)'s 1 day's work =

24. A works twice as fast as B. If B can complete a work in 12 days independently, the number of days in which A and B can together finish the work in : A.4 days B.6 days C.8 days D.18 days

24. Answer: Option A Explanation: Ratio of rates of working of A and B = 2 : 1. So, ratio of times taken = 1 : 2. 1 B's 1 day's work = . 12 1 A's 1 day's work = ; (2 times of B's work) 6 1 1 3 1 (A + B)'s 1 day's work = + = = . 6 12 12 4 So, A and B together can finish the work in 4 days.

25. Twenty women can do a work in sixteen days. Sixteen men can complete the same work in fifteen days. What is the ratio between the capacity of a man and a woman? A.3 : 4 B.4 : 3 C.5 : 3 D.Data inadequate 25.Answer: Option B Explanation: (20 x 16) women can complete the work in 1 day. 1 woman's 1 day's work = 1 . 320

(16 x 15) men can complete the work in 1 day. 1 1 man's 1 day's work = 240 1 1 So, required ratio= : 240 320 11 = : 34 = 4 : 3 (cross multiplied) 26. A and B can do a work in 8 days, B and C can do the same work in 12 days. A, B and C together can finish it in 6 days. A and C together will do it in :

A.4 days C.8 days

B.6 days D.12 days

26. Answer: Option C Explanation: 1 (A + B + C)'s 1 day's work = ; 6 1 (A + B)'s 1 day's work = ; 8 1 (B + C)'s 1 day's work = . 12 1 1 1 (A + C)'s 1 day's work= 2 x - + 6 8 12 1 5 = 3 24 3 = 24 1 = . 8 So, A and C together will do the work in 8 days.

27. A can finish a work in 24 days, B in 9 days and C in 12 days. B and C start the work but are forced to leave after 3 days. The remaining work was done by A in: A.5 days B.6 days 1 C.10 days D.10 days 2

27. Answer: Option C Explanation: (B + C)'s 1 day's work = 1 1 7 + = . 9 12 36 7 7 x3 = . 36 12

Work done by B and C in 3 days =

7 5 Remaining work = 1 - = . 12 12 1 Now, work is done by A in 1 day. 24 5 5 So, work is done by A in 24 x = 10 days. 12 12 28. X can do a piece of work in 40 days. He works at it for 8 days and then Y finished it in 16 days. How long will they together take to complete the work? A.131days B.15 days

3 C.20 days

D.26 days

28. Answer: Option A Explanation: Work done by X in 8 days = 1 1 x8 = . 40 5

1 4 Remaining work = 1 - = . 5 5 4 Now, work is done by Y in 16 days. 5 5 Whole work will be done by Y in 16 x = 20 days. 4 1 1 X's 1 day's work = , Y's 1 day's work = . 40 20 1 1 3 (X + Y)'s 1 day's work = + = . 40 20 40 Hence, X and Y will together complete the work in 29. 40 1 = 13 days

A and B can do a job together in 7 days. A is 1 times as efficient as B. The same job can be done by A alone in : 1 A.9 days B.11 days 3 1 1 C.12 days D.16 days 4

29. Answer: Option B Explanation: 7 (A's 1 day's work) : (B's 1 day's work) = : 1 = 7 : 4. 4 Let A's and B's 1 day's work be 7x and 4x respectively. 1 Then, 7x + 4x = 7 1 11x = 7 1 1 A's 1 day's work = x7 = . 77 11 1 x= . 77

30. A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes the remaining work alone in 44 days. In how many days shall B finish the whole work alone?

A.30 days C.60 days 30. Answer: Option C Explanation:

B.40 days D.70 days

Let A's 1 day's work = x and B's 1 day's work = y. 1 Then, x + y = and 16x + 44y = 1. 30 1 1 Solving these two equations, we get: x = and y = 60 60 1 B's 1 day's work = . 60 Hence, B alone shall finish the whole work in 60 days.

31. If 9 men working 6 hours a day can do a work in 88 days. Then 6 men working 8 hours a day can do it in how many days? A. 99 B. 69 C. 89 D. 55 Solution: From the above formula i.e (m1*t1/w1) = (m2*t2/w2) so (9*6*88/1) = (6*8*d/1) on solving, d = 99 days.

32. If 34 men completed 2/5th of a work in 8 days working 9 hours a day. How many more man should be engaged to finish the rest of the work in 6 days working 9 hours a day? A. 120 B. 136 C. 60 D. 102 . Solution: From the above formula i.e (m1*t1/w1) = (m2*t2/w2) so, (34*8*9/(2/5)) = (x*6*9/(3/5)) so x = 136 men number of men to be added to finish the work = 136-34 = 102 men

33. If 5 women or 8 girls can do a work in 84 days. In how many days can 10 women and 5girls can do the same work? A. 14 C. 20 B. 32 D. 24

Solution: Given that 5 women is equal to 8 girls to complete a work so, 10 women = 16 girls. Therefore 10women +5girls = 16girls+5girls = 21 girls. 8 girls can do a work in 84 days then 21 girls ————— ? Answer = (8*84/21) = 32 days. Therefore 10 women and 5 girls can a work in 32 days 34. Worker A takes 8 hours to do a job. Worker B takes 10hours to do the same job. How long it take both A & B, working together but independently, to do the same job? A. 40/9 B. 56 C. 12 D.12 1/8 Solution: A’s one hour work = 1/8. B’s one hour work = 1/10 (A+B)’s one hour work = 1/8+1/10 = 9/40 Both A & B can finish the work in 40/9 days 35. A can finish a work in 18 days and B can do the same work in half the time taken by A. Then, working together, what part of the same work they can finish in a day? A.1/9 C. 1/6 B. 1/7 D.4/6

Solution: Given that B alone can complete the same work in days = half the time taken by A = 9days A’s one day work = 1/18 B’s one day work = 1/9 (A+B)’s one day work = 1/18+1/9 = 1/6 36. A is twice as good a workman as B and together they finish a piece of work in 18 days. In how many days will A alone finish the work. A. 27 C. 17 B. 47 D. 57

Solution: if A takes x days to do a work then B takes 2x days to do the same work = > 1/x+1/2x = 1/18 = > 3/2x = 1/18 = > x = 27 days. Hence, A alone can finish the work in 27 days. 37. A can do a certain work in 12 days. B is 60% more efficient than A. How many days does B alone take to do the same job? A. 16/4 B. 15/2 C. 12 D. 14/3 Solution: Ratio of time taken by A & B = 160:100 = 8:5 Suppose B alone takes x days to do the job.

Then, 8:5::12:x = > 8x = 5*12 = > x = 15/2 days. 38.A can do a piece of work n 7 days of 9 hours each and B alone can do it in 6 days of 7 hours each. How long will they take to do it working together 8 2/5 hours a day? A. 11 C. 7 B.4 D.3

Solution: A can complete the work in (7*9) = 63 days B can complete the work in (6*7) = 42 days = > A’s one hour’s work = 1/63 and B’s one hour work = 1/42 (A+B)’s one hour work = 1/63+1/42 = 5/126 Therefore, Both can finish the work in 126/5 hours. Number of days of 8 2/5 hours each = (126*5/(5*42)) = 3 days 39. A takes twice as much time as B or thrice as much time to finish a piece of work. Working together they can finish the work in 2 days. B can do the work alone in ? A. 7 C. 8 B.6 D. 9

Solution: Suppose A,B and C take x,x/2 and x/3 hours respectively finish the work then 1/x+2/x+3/x = 1/2 = > 6/x = 1/2 = >x = 12 So, B takes 6 hours to finish the work.

40. X can do ¼ of a work in 10 days, Y can do 40% of work in 40 days and Z can do 1/3 of work in 13 days. Who will complete the work first? A. X C. Z B. Y D. NONE

Solution: Whole work will be done by X in 10*4 = 40 days. Whole work will be done by Y in (40*100/40) = 100 days. Whole work will be done by Z in (13*3) = 39 days Therefore, Z will complete the work first.

41) If 9 men working 6 hours a day can do a work in 88 days. Then 6 men working 8 hours a day can do it in how many days? Solution: From the above formula i.e (m1*t1/w1) = (m2*t2/w2) so (9*6*88/1) = (6*8*d/1) on solving, d = 99 days.

A.12

B.35

C.100

D.99

42) If 34 men completed 2/5th of a work in 8 days working 9 hours a day. How many more man should be engaged to finish the rest of the work in 6 days working 9 hours a day? Solution: From the above formula i.e (m1*t1/w1) = (m2*t2/w2) so, (34*8*9/(2/5)) = (x*6*9/(3/5)) so x = 136 men number of men to be added to finish the work = 136-34 = 102 men A.100 B.21 C.57 D.102

43) If 5 women or 8 girls can do a work in 84 days. In how many days can 10 women and 5 girls can do the same work? Solution: Given that 5 women is equal to 8 girls to complete a work so, 10 women = 16 girls. Therefore 10women +5girls = 16girls+5girls = 21 girls. 8 girls can do a work in 84 days then 21 girls ————— ? Answer = (8*84/21) = 32 days. Therefore 10 women and 5 girls can a work in 32 days A.32 B.45 C.89 D.NONE

44) Worker A takes 8 hours to do a job. Worker B takes 10hours to do the same job. How long it take both A & B, working together but independently, to do the same job? A.40 B.9 C.40/9 D.90

Solution: A’s one hour work = 1/8. B’s one hour work = 1/10 (A+B)’s one hour work = 1/8+1/10 = 9/40 Both A & B can finish the work in 40/9 days

45) A can finish a work in 18 days and B can do the same work in half the time taken by A. Then, working together, what part of the same work they can finish in a day? A.1/6 B.7/8 C.7/5 D.9

Solution: Given that B alone can complete the same work in days = half the time taken by A = 9days A’s one day work = 1/18 B’s one day work = 1/9 (A+B)’s one day work = 1/18+1/9 = 1/6 46) A is twice as good a workman as B and together they finish a piece of work in 18 days.In how many days will A alone finish the work. A. 27 B.78 C.99 D.NONE

Solution: if A takes x days to do a work then B takes 2x days to do the same work = > 1/x+1/2x = 1/18 = > 3/2x = 1/18 = > x = 27 days. Hence, A alone can finish the work in 27 days. 47) A can do a certain work in 12 days. B is 60% more efficient than A. How many days does B alone take to do the same job? A. 2/4 B/5/6 C.8/9 D.15/2

Solution: Ratio of time taken by A & B = 160:100 = 8:5 Suppose B alone takes x days to do the job. Then, 8:5::12:x = > 8x = 5*12 = > x = 15/2 days. 48) A can do a piece of work n 7 days of 9 hours each and B alone can do it in 6 days of 7 hours each. How long will they take to do it working together 8 2/5 hours a day? A. 3 B. 5 C. 7 D.NONE

Solution: A can complete the work in (7*9) = 63 days B can complete the work in (6*7) = 42 days = > A’s one hour’s work = 1/63 and B’s one hour work = 1/42 (A+B)’s one hour work = 1/63+1/42 = 5/126 Therefore, Both can finish the work in 126/5 hours. Number of days of 8 2/5 hours each = (126*5/(5*42)) = 3 days

49) A takes twice as much time as B or thrice as much time to finish a piece of work. Working together they can finish the work in 2 days. B can do the work alone in ? A.44 B.6 C.8 D.9

Solution: Suppose A,B and C take x,x/2 and x/3 hours respectively finish the work then 1/x+2/x+3/x = 1/2 = > 6/x = 1/2 = >x = 12 So, B takes 6 hours to finish the work. 50) A can do ¼ of a work in 10 days, Y can do 40% of work in 40 days and Q can do 1/3 of work in 13 days. Who will complete the work first? A. Y B.Q C.A D.ALL

Solution: Whole work will be done by A in 10*4 = 40 days. Whole work will be done by Y in (40*100/40) = 100 days. Whole work will be done by Qin (13*3) = 39 days Therefore,Q will complete the work first.

ANSWERS: 1. D 2. C 3.B 4.B 5.B

6.A 11.C 16.B 21.B 26.C

7.C 12.B 17.B 22.C 27.C

8.C 13.D 18.C 23.A 28.A

9.C 14.A 19.C 24.A 29.B

10.D 15.C 20.B 25.B 30.C

31. A 32. D 33. B 34. A 35.C 36. A 37. B 38. D 39. B 40. C 41. D 42.D 46.A 47.D 43.A 48.A 44.C 49.B 45.A 50.B

MOCK TEST:
1. A can do a piece of work in 30 days while B alone can do it in 40 days. In how many days can A and B working together do it ?

(a) 17 1/7 (b) 27 1/7 (c) 42 3/4 (d) 70 2. A and B together can complete a piece of work in 35 days while A alone can complete the same work in 60 days. B alone will be able to complete the same work in : (a) 42 days (b) 72 days (c) 84 days (d) 96 days 3. A can do a piece of work in 7 days of 9 hours each and B can do it in 6 days of 7 hours each. How long will they take to do it, working together 8 2/5 hours a day ? (a) 3 days' (b) 4 days (c) 4 1/2 days (d) None of these 4. A can do a piece of work in 15 days and B alone can do it in 10 days. B works at it for 5 days and then leaves. A alone can finish the remaining work in : (a) 13/2 (b) 15/2 days (c) 8 days (d) 9 days 5. A can do 1/3 of the work in 5 days and B can do 2/5 of the work in 10 days. In how many days both A and B together can do the work? (a) 7 ¾ (b)8 4/5 (c) 9 3/8 (d) 10 6. A can do a piece of work in 80 days. He works at it for 10 days and then B alone finishes the remaining work in 42 days. The two together could complete the work in : (a) 24 days (b) 25 days (c) 30 days (d) 35 days 7.A and B can together finish a work in 30 days. They worked at it for 20 days and then B left. The remaining work was done by A alone in 20 more days. A alone can finish the work in : (a) 48 days (b) 50 days (c) 54 days (d) 60 days 8.A and B can do a piece of work in 45 days and 40 days respectively. They began to do the work together but A leaves after some days and then B completed the remaining work in 23 days. The number of days after which A left the work was: (a) 6 (b) 8 (c) 9 (d) 12 9. A does half as much work as B in three-fourth of the time. If together they take 18 days to complete the work, how much time shall B take to do it ? (a) 30 days (b) 35 days (c) 40 days (d) none of these 10. A can do a certain job in 12 days. B is 60% more efficient than A. The number of days, it takes B to do the same piece of work, is : (a) 6 (b) 6 ¼ (c) 7 ½ (d) 8 11. A can do a certain job in 25 days which B alone can do in 20 days. A started the

work and was joined by B after 10 days. The number of days taken in completing the work was :

(a) 12 ½ (b) 14 2/9 (c) 15 (d) 16 2/3 12. A is twice as good a workman as B and together they finish a piece of work in 14 days. The number of days taken by A alone to finish the work, is : (a) 11 (b) 21 (c) 28 (d) 42 13. A is thrice as good a workman as B and takes 10 days less to do a piece of work than B takes. B alone can do the whole work in : (a) 12 days (b) 15 days (c) 20 days (d) 30 days 14. A can do a piece of work in 14 days which B can do in 21 days. They begin together but 3 days before the completion of the work, A leaves off. The total number of days to complete the work is : (a) 6 3/5 (b) 8 ½ (c) 10 1/5 (d) 13 ½ 15. If Ramesh, Suresh and Harish can do a piece of work in 15 days, 10 days and 6 days respectively, how long will they take to do it, if all the three work at it together? (a) 3 days (b) 3 ½ days (c) 3 9/20 days (d) 3 3/20 days 16. A and B can do a piece of work in 72 days; B and C can do it in 120 days; A and C can do it in 90 days. In what time can A alone do it ? (a) 150 days (b) 120 days (c) 100 days (d) 80 days 17. A and B can do a piece of work in 5 days; Band C can do it in, 7 days; A and C can do it in 4 days. Who among these will take the least time if put to do it alone? (a) A (b) B (c) C (d) Data inadequate 18. If A, B and C together can finish a piece of work in 4 days; A alone can do it in 12 days and B in 18 days, then C alone can do it in : (a) 21 days (b) 16 days (c) 14 days {d) 9 days

19. A and B can do a piece of work in 18 days; Band C can do it in 24 days; A and C can do it in 36 days. In how many days can they do it all working together'? (a) 12 (b) 13 (c) 16 (d) 26

20. A and B together can do a piece of work in 12 days, which Band C together can do in 16 days. After A has been working at it for 5 days and B for 7 days, C finishes in 13 days. In how many days C alone will do the work (a) 16 (b) 24 (c) 36 (d) 48 21. A is twice as good a workman as B and together they complete a work in 15 days. In how many days can the work be completed by B alone?) (a) 22 ½ (b) 30 (c) 37 ½ (d) 45 22. 45 men can complete a work in 16 days. Six days after they started working, 30 more men joined them. How many days will they now take to complete the remaining work? (a) 4 (b) 5 (c) 6 (d) 8 23. 12 men can complete a work in 18 days. Six days after they started working, 4 men joined them. How many days will all of them take to finish the remaining work? (a) 9 (b) 10 (c) 12 (d) 15 24. Twelve men can complete a work in 8 days. Three days after they started the work, 3 more men joined. In how many days will all of them together complete the remaining work? (a) 2 (b) 4 (c) 5 (d) 6 25. A, B and C are employed to do a piece of work for Rs. 529. A and C are supposed to finish 19/23 of the work together. How much shall be paid to B ? (a) Rs. 82 (b) Rs. 92 (c) Rs. 300 (d) Rs. 437 26. A job is completed by 10 men in 20 days and by 20 women in 15 days. How many days will it take for 5 men and 10 women to finish that work? (a) 17 ½ (b) 17 1/7 (c) 17 (d) 17 1/120 27. A piece of work can be done by 6 men and 5 women in 6 days or 3 men and 4 women in 10 days. It can be done by 9 men and 15 women in : (a) 1 day (b) 2 days (c) 3 days (d) 4 days

28. 4 men and 6 women finish a job in 8 days, while 3 men and 7 women finish it in 10 days. In how many days will 10 women working together finish it ? (a) 24 (b) 32 (c) 36 (d) 40

29. 12 children take 16 days to complete a work which can be completed by 8 adults in 12 days. 16 adults started working and after 3 days 10 adults left and 4 children joined them. How many days will it take them to complete the remaining work? (a) 6 (b) 8 (c) 4 (d) 3 30. Ram can do a piece of work in 8 days which Shyam can finish in 12 days. If they work at it on alternate days with Ram beginning, in how many days, the work will be finished? (a) 9 1/3 (b) 9 ½ (c) 91/24 (d) 10 1/3 31. A and B working separately can do a piece of work in 9 and 12 days respectively. If they work for a day alternately, A beginning, in how many days the work will be completed? (a) 10 ½ (b) 10 1/3 (c) 10 ¼ (d) 10 2/3 32. A, Band C can do a piece of work in 11 days, 20 days and 55 days respectively, working alone. How soon can the work be done if A is assisted by Band C on alternate days? (a) 7 days (b) 8 days (c) 9 days (d) 10 days 33. Machines A and B produce 8000 clips in 4 and 6 hours respectively. If they work alternately for 1 hour, A starting first, then 8000 clips will be produced in : (a) 4 1/3 hours (b) 4 2/3 (c) 5 1/3 hrs (d) 5 2/3 hrs 34. A father can do a job as fast as his two sons working together. If one son does the job in 3 hours and the other in 6 hours, how many hours does it take the father to do the job? (a) 1 (b) 2 (c) 3 (d) 4 35. A sum of money is sufficient to pay A's wages for 21 days and B's wages for 28 days. The same money is sufficient to pay the wages of both for: (a) 12 days (b) 14 days (c) 12 ¼ days (d) 24 ½ days

36. 2 men and 3 boys can do a piece of work in 10 days while 3 men and 2 boys can do the same work in 8 days. In how many days can 2 men and 1. boy do the work? (a) 12 ½ days (b)14 (c)17 (d)8

37. A is twice as good a workman as B and together they finish a piece of work in 18 days. In how many days will A alone finish the work? a. 37 b. 27 days c. 67 d. 44

38. A and B undertake to do a piece of work for Rs. 600. A alone can- do it in 6 days while B alone can do it in 8 days. With the help of C, they finish it in 3 days. Find the share of A? a. Rs. 400 b. Rs. 800 c. Rs. 300 d. none 39. A and B undertake to do a piece of work for Rs. 600. A alone can- do it in 6 days while B alone can do it in 8 days. With the help of C, they finish it in 3 days. Find the share of B? a.Rs. 400 b.Rs. 800 c.Rs. 300 d.Rs.225 40. A and B undertake to do a piece of work for Rs. 600. A alone can- do it in 6 days while B alone can do it in 8 days. With the help of C, they finish it in 3 days. Find the share of c? (a) Rs. 75 b. 27 days c. 67 d. 44 41. A and B can do a piece of work in 12 days; Band C can do it in 15 days ; A and C can do it in 20 days. In how many days will A, Band' C finish it, working all together? (a) 10 days b. 27 days c. 67 d. 44 42. A and B can do a piece of work in 12 days; Band C can do it in 15 days ; A and C can do it in 20 days. find the number of days taken by A to finish it working alone. (a) 30 days b. 27 days c. 67 d. none

43. A and B can do a piece of work in 12 days; Band C can do it in 15 days ; A and C can do it in 20 days. find the number of days taken by B to finish it working alone. (a) 30 days b. 20 days c. 67 d. none

44. A and B can do a piece of work in 12 days; Band C can do it in 15 days ; A and C can do it in 20 days. find the number of days taken by C to finish it working alone. (a) 60 days (B) 30 days C. 20 days D. NONE

45. A is twice as good a workman as B and together they finish a piece of work in 18 days. In how many days will A alone finish the work?

(a) 27 days (B) 30 days C. 20 days D. NONE 46. A and B undertake to do a piece of work for Rs. 600. A alone can- do it in 6 days while B alone can do it in 8 days. With the help of C, they finish it in 3 days. Find the share of A? (a) Rs. 300 (B) 30 days C. 20 days D. NONE 47. A and B undertake to do a piece of work for Rs. 600. A alone can- do it in 6 days while B alone can do it in 8 days. With the help of C, they finish it in 3 days. Find the share of B? (a) Rs.225 (B) 30 days C. 20 days D. NONE 48. A can do a piece of work in 10 days which B alone can do in 12 days. In how many days will they finish the work, both working together? (a) 5 5/11 days b. 27 days c. 67 d. 44

49. Two persons A and B working together can dig a trench in 8 hours while A alone can dig it in 12 hours. In how many hours B alone can dig such a trench? (a) 25 hours (b) 24 hours (c) 42 hours (d) none 50. Ex. 4. 3 men can complete a piece of work in 6 days. Two days after they started the work, 3 more men joined them. How many days will they take to complete the remaining work? (a) 25 hours (b) 24 hours (C) 2 days d) n0ne

ANSWERS:

1. (a) 2.(c) 3.(a) 4.(b) 5.(c) 6.(c) 7.(d) 8.(c) 9.(a)10. (c) 11.(d) 12.(b) 13.(b) 14.(c) 15.(a) 16.(b) 17.(a) 18.(d) 19(c)20. (b) 21.(d) 22(c) 23.(a) 24.(b) 25.(b) 26.(b) 27.(c) 28(d) 29(a)30.(b) 31.(c) 32.(b) 33.(b) 34.(b) 35.(a) 36.A 37.B 38.C 39.D 40.A 41.A 42.A 43.B 44.A 45. A 46.A 47.A 48.A 49.B 50.C

You May Also Find These Documents Helpful

  • Good Essays

    2. Let us assume two students must prepare a presentation for their marketing class. As part of their class presentation, they must do a series of calculations and prepare 50 PowerPoint slides. It would take Larry 10 hours to do the required calculation and 10 hours to prepare the slides. It would take Kate 12 hours to do the series of the calculations and 20 hours to prepare the PPT slides.…

    • 743 Words
    • 3 Pages
    Good Essays
  • Better Essays

    Nvqlevel 2 Unit 201&202

    • 1124 Words
    • 5 Pages

    1.2 By planning your work you will increase productivity and work efficiency. That way you can monitor your progress.…

    • 1124 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    2. Let us assume two students must prepare a presentation for their marketing class. As part of their class presentation, they must do a series of calculations and prepare 50 PowerPoint slides. It would take Larry 10 hours to do the required calculation and 10 hours to prepare the slides. It would take Kate 12 hours to do the series of the calculations and 20 hours to prepare the PPT slides.…

    • 634 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Codeing Scenarios

    • 848 Words
    • 4 Pages

    Work – relative level of time, skill training and intensity to provide a given service…

    • 848 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    10. There are two types of machines called type A and type B. Both type A and type B can be used to produce a certain product. The production manager wants to compare efficiency of the two machines. He assigns each of the fifteen workers to both types of machines to compare the hourly production rate of the 15 workers. In other…

    • 6340 Words
    • 26 Pages
    Satisfactory Essays
  • Good Essays

    HW 2

    • 711 Words
    • 3 Pages

    2. Assume some guy named Spano and a woman named Bagley are stranded on an island. Two tasks must be done: fishing and building shelters. Assume that Bagley can catch one fish every 10 hours and build one thatched hut every 20 hours. While Spano (who is a bit on the clumsy side) can catch one fish every 15 hours and build a thatched hut every 45 hours. Now assume that during the year both Bagley and Spano each work 108,000 minutes.…

    • 711 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    This week’s assignment involved solving real work radicals. We were required to solve two problems on pages 605 and 606. While this assignment was not easy for me, I feel like I most definitely learned something new. The problems involve sailboat stability and speed. I will be looking for the capsize screening value and the sail power of the sailboat.…

    • 379 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Directions: Answer the following problems IN DETAIL. Your analysis must be typed and should be free of grammatical errors and “slang” terms.” Wherever appropriate, make sure you supplement your discussion with graphical analysis and equations. The graphs may be hand drawn, but please make sure they are neat. There are no restrictions or requirements on working in groups. The one exception is that each person must hand in his/her OWN work. In economic terms, there are no input restrictions; however, the output MUST be yours.…

    • 1829 Words
    • 8 Pages
    Better Essays
  • Good Essays

    Stereotypes Of Work Essay

    • 1485 Words
    • 6 Pages

    As people living on this earth, we are all influenced by work. Whether we are in a poor country or a rich country, whether we are living on the streets or living in a mansion we are all influenced by work in some way. Throughout this essay I will bring up several topics on how work is related to everyone living and what work means to me.…

    • 1485 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    3. What can you add to the definition of work you provided in your introduction post?…

    • 420 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Chapters Take Away

    • 1275 Words
    • 6 Pages

    Explain the principle of job specialization and division of labor, and tell why the study of person-task relationships is central to the pursuit of increased efficiency.…

    • 1275 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    1. Home has 1200 units of labor available. It can produce two goods, apples and bananas. The unit labor requirement in apple production is 3, while in banana production it is 2.…

    • 275 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Mechanics-Work.Power&Energy

    • 3033 Words
    • 13 Pages

    Table of contents: 3 3.1 3.2 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.4 3.5 3.6 3.6.1 3.6.2 3.6.3 Work, Power and Energy......................................................................................................................................1 Work done by a constant force .............................................................................................................................2 Work done by a variable force..............................................................................................................................3 Energy ..................................................................................................................................................................3 Potential Energy..........................................................................................................................................4 Formulae for gravitational potential energy................................................................................................4 Kinetic energy.............................................................................................................................................5 Formulae for kinetic energy........................................................................................................................5 Kinetic energy and work done ....................................................................................................................6…

    • 3033 Words
    • 13 Pages
    Good Essays
  • Good Essays

    In this chapter, students will get to learn about the concepts of involving work and energy including the work of a force that acts on particles. Therefore, students can develop the principle of work and energy and the concepts of a conservative force as this equation can be useful for solving problems involving force, velocity and displacement and also can solve the kinetic problems. So in general, this chapter will enable students to analyse and understand more about the motion of a particle by using the concepts of work and energy.…

    • 897 Words
    • 4 Pages
    Good Essays
  • Better Essays

    Manufacturing better, more durable and less-costly products has always been an important part of the industrial process for the designers to think about and the developing technology nowadays helps the corporations to design better technics, better methods and these help the corporations to reduce the costs, increase the products by decreasing the time that is necessary to manufacture those products. People working in industries try to find more efficient ways of manufacturing the products and thus, they use work measurement methods to plan the work of the workforce, to decide how many workers it would need to complete the tasks, to determine the time that is needed to complete the task, to calculate the general cost of the product and finally to calculate the general efficiency and the productivity of the workers. Work measurement is the process of establishing the time that a given task would take when performed by a qualified worker working at a defined level of performance. There are various ways in which work may be measured and a variety of technics have been established. The basic procedure, irrespective of the particular measurement technic being used, consists of three main stages; an analysis phase in which the job is divided into convenient, discrete components, commonly known as elements; a measurement phase in which the specific measurement technic is used to establish the time required to complete each element of work and a synthesis phase in which the various elemental times are added, together with appropriate allowances to construct the standard time for the complete job.…

    • 1112 Words
    • 5 Pages
    Better Essays