ashok leyland training
INPLANT TRAINING REPORT

ASHOK LEYLAND, ENNORE

Training period 4th June to 8th June

Submitted by

And

of

INTRODUCTION

Ashok Leyland is a leading national and international truck and bus manufacturer and a part of the Hinduja group with a vision of being in the global top 10 in the M&HCV trucks(>7.5T GVW) segment and top be in the global Top 5 in M&HCV busses(8 m & above) segment.
Ashok Leyland Ennore plant is the first Ashok Leyland plant and is also the mother plant accounting to almost 40% of the total production of AL. This plant manufactures vehicles and important aggregates like engines, gearboxes and axles. Employing over 5000 people this plant is huge spread over 135 Acers.
We have been given the privilege to undergo in plant training at this facility for duration of a week from 4th of June 2013. This training is important for us as we get to learn the various manufacturing processes involved in the trucks and busses manufacturing and we also get to learn the way a world class manufacturing plant functions .

ACKNOWLEDGMENT

We thank the HR Ashok Leyland for giving us the opportunity for the in plant training ,we thank the guided , the shop managers and the shop floor workers for being patient and spending some time in enlightening us on the various processes involved in the manufacturing of the vehicles. We also thank our college and our faculty for facilitating the requirement of in plant training in our curriculum and also teaching us to become good engineers.

Day 1
SHOP IV: REAR AXLE ASSEMBLY

Our first shop visit in the training which involved the assembly of rear axels of various AL truck and bus models. The processes we observed are-
1. Axle casings were loaded onto pedestals and correct positioning of LH and RH sides were ensured.

2. Wire strips, axle shafts, plastic caps were removed on both sides and placed on skid.

3. Dust covers

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Milk Lab

    • 431 Words
    • 2 Pages

    1. A ramp was angled at 3 degrees and a ticker machine was attached at the higher end of the ramp.…

    • 431 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Report1

    • 274 Words
    • 1 Page

    counterweight is parked at the minimum distance while the outer one is mobile, and double trolley where both counterweights move together.…

    • 274 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    4. The next step is to raise the car using the jack until it is raised fully off the ground. Then remove the wheel lugs completely and set them aside first. Be sure to put them in a secured place so that it will not be lost, you still have to use it after the spare tires are placed.…

    • 543 Words
    • 3 Pages
    Good Essays
  • Good Essays

    In Part A, a vehicle was created. The vehicle used gears and two wheel and axles. The gears turned as the front wheels rotated. The axles ran through the width of the vehicle, and the wheels connected to the axle on either side of the vehicle. Each wheel and axle was placed at different ends of the machine, however the vehicle has a short wheel base, since the vehicle is small. Each wheel had a tire for traction and smooth driving, and the vehicle moved one the wheels.…

    • 480 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Navistar Supply Management

    • 2766 Words
    • 80 Pages

    Andy Ramsz, the Assembly Supervisor at Navistar’s Chatham facility has been experiencing an issue with interior trim shortages for Navistar’s premium conventional trucks. The shortage of parts and non compliance with delivery schedules did not allow plant assemblers to complete the interior of a truck. The delay in completing the truck affected the bottom line as the interruption…

    • 2766 Words
    • 80 Pages
    Powerful Essays
  • Good Essays

    Physics Lab

    • 282 Words
    • 2 Pages

    3. The supplied wooden block was used to set the angle of the launched platform.…

    • 282 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Dtc Case Study

    • 607 Words
    • 3 Pages

    6. Place the front differential carrier and the front differential transfer gear into the housing.…

    • 607 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    How to Change Flat Tire

    • 684 Words
    • 3 Pages

    A. First, loosen the lug nuts using the lug wrench or cross wrench we just got from the trunk and keep them together and safe.…

    • 684 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    2. The way you will position your wheels will depend on whether you are parked uphill, downhill, or if there is a curb…

    • 443 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    6. On a wheel and axle, the wheel is connected to a center post called an axle. Turning the lager wheel makes turning the axle easier . Which is not a wheel and axle?…

    • 1262 Words
    • 6 Pages
    Good Essays
  • Better Essays

    The apparatus involved a mild steel portal frame, which had been clamped into a loading rig…

    • 1039 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    1. Component Location A. Main Gear Wheels (Ref. Fig. Main Gear Wheels - Component Location SHEET 1)…

    • 2137 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    Steering Linkages Steering

    • 2531 Words
    • 11 Pages

    In any motor cars and other four and six wheeler vehicles, steering is main component.…

    • 2531 Words
    • 11 Pages
    Powerful Essays
  • Satisfactory Essays

    industrial training report

    • 1335 Words
    • 5 Pages

    My sincere gratitudes go to my industrial supervisor Miss Siti Norshafina Binti Jaih, Site Engineer, and the other staff on Penang Second Bridge project Mr Leong Chee Keong, Contractor Manager , Mr Faizul Ikmal, Site Engineer, Mr Chang Su Thai, Quantity Surveyor, Mr Loo Wooi Min, site supervisor and all the staffs, for helping me during the course of my 10 weeks of Industrial Training at GHL Construction Sdn Bhd on Penang Second Bridge Batu Kawan Expressway Project. A lot of thanks you for all of teaching and providing helpful guidance to me.…

    • 1335 Words
    • 5 Pages
    Satisfactory Essays
  • Powerful Essays

    Atlas Honda Report

    • 4346 Words
    • 18 Pages

    We would like to pay gratitude to the entire group of Atlas Honda for giving us their precious time to provide us with valuable information of each department and we also like to thank our group members for putting in all their possible efforts and time in understanding the relevant information on the entire Production Process, and in preparing the report on it. It is our honor to present gratitude towards our Professor, Dr. Yaseen for providing valuable advice and guidance throughout the entire work, without which this task would not have been possible. October 30, ‏2009…

    • 4346 Words
    • 18 Pages
    Powerful Essays