Case Study for project management- chapter1-3
CASE STUDIES
(PROJECT MANAGEMENT)

MERCENE, JOHANNA B.
BSIS- 3B

Chapter 1
INTRODUCTION

CASE: AaronSide to Teams
Dragan Z. Milosevic, Peerasit Patanakul, and Sabin Srivannaboon

Answers

1. (a) Relay race approach has its good idea to conduct first a study of what the consumers’ desires before getting into the decisions of making a new project or product to determine the needs of the customers. But, having this approach is much suitable for local projects. In the other hand is the Cross- functional approach. Cross functional approach is ideal to a large project especially if the project is getting worldwide. This approach needs to hire experts’ people to build a team for the departments. With this, the success of the project can exceed from the expectation. But, failure of the project has its big chances if the department or team was not united.
(b) In my own evaluation, I think it is the relay race approach. Because for me it is much better to have a not so small project successful than having a large project with a big lost of yours if you failed.
2. It is the Swedish company who has more power while less power was on Aaronside.
3. Yes. It is because cross- functional approach requires hiring expert people to build a team for a certain project.
4. I think it is because of the fact that VPs want to make the major decision by themselves without the consulting to the members. Additionally, VPs request to the members to bring only the necessary information and come up to that kind of decision without asking for any opinion or approval from the members as respect to their presence.
5. Yes. Because it is not right to tolerate such things.

CASE: Cocable Inc.
Jovana Riddle

Answers

1. The advantage to the Cocable case is that the company was open for a change to improve their company. Additionally, the employees were trained to the extent of their capabilities to work at Cocable for the continues development

You May Also Find These Documents Helpful

  • Powerful Essays

    Nature’s Peace Community has contracted us to provide project management for a playground and picnic area for the local neighborhood. The goal is to design and build a playground and picnic area for the neighborhood using HOA fees that the neighborhood have agreed to spend no more than a total of $100,000.00 for the community to enjoy. The lot is one half acre of cleared land that is flat and in the center of the neighborhood. The Homeowner’s Association would like to have 4-6 picnic tables and a large playground on rubber mulch with a separate area for swing sets meant for young children and adults.…

    • 1798 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    After working as a project engineer for 14 years at Scientific Engineering Corporation (SEC) with great success, Gary Allison accepted a position as Project Manager on the Orion Shield Project. This was one decision that would change Gary’s career at SEC dramatically, as from being the best engineer in the plant ten months ago, we would be fired from the company. Let’s take a close look at the identify and discuss the technical, ethical, legal, contractual and other project management issues that Gary faced during the Orion Shield project.…

    • 1168 Words
    • 5 Pages
    Good Essays
  • Better Essays

    The goal the paper is to provide a description of the managerial processes of project management. The paper will provide an overview of the project which is Access One’s Annual Blizzard. The paper will identify the primary goals of the project and show why the Blizzard is a project and not just the organizations day to day work. A description of the organizations structure will be included too identify how the project bodes with the organization. The paper will also provide the pros and cons the project has on the organizational structure. The paper will conclude by…

    • 1004 Words
    • 5 Pages
    Better Essays
  • Better Essays

    Project Management

    • 844 Words
    • 4 Pages

    The projects environment as it relates to cultural /social is one of healing, health and wellbeing of the population or community. The expansion of the facility will impose little impact on the environment as we will be using an existing building and all green practices and policies will be instituted when possible.…

    • 844 Words
    • 4 Pages
    Better Essays
  • Good Essays

    This project will be carried out in a specific amount of time to achieve an improvement to the requested metrics, which in this case is to increase the number of documented reviews.…

    • 681 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Pm 586: Project Part 1

    • 839 Words
    • 4 Pages

    To place the project in a matrix organizational structure equipped with capable staff that are recruited both outside and inside of the company.…

    • 839 Words
    • 4 Pages
    Powerful Essays
  • Powerful Essays

    Project Management

    • 2439 Words
    • 10 Pages

    b) What phase is the Project Scope produced? What are some of the items contained in this document?…

    • 2439 Words
    • 10 Pages
    Powerful Essays
  • Good Essays

    1) What are some of the principal reasons why project management has become such a popular business tool in recent years?…

    • 687 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Pan Europa

    • 274 Words
    • 2 Pages

    • might there be any synergies or confl icts between the projects? • do any of the projects have nonquantitative benefi ts or costs that should be considered in an evaluation? 5. Considering all the above, what screens/factors might you suggest to narrow down the set of most desirable projects? What criteria would you use to evaluate the projects on these various factors?…

    • 274 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Organizational Structure

    • 1093 Words
    • 5 Pages

    The matrix organization is an attempt to combine the advantages of the pure functional structure and the product organizational structure (Visitask.com, 2011). This form is ideally suited for construction type companies that project oriented. Unlike the US Army’s divisional structure groups its divisions according to the specific demands of the battlefield. The matrix organization is teams working together through functional and project management with shared…

    • 1093 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Chunnel Project

    • 9442 Words
    • 38 Pages

    This case study was originally prepared as part of Project Management Applications, the capstone course of the Master of Science in Project Management in the Department of Management Science at The George Washington University, by the graduating students listed above with the supervision of Professor Anbari.…

    • 9442 Words
    • 38 Pages
    Powerful Essays
  • Satisfactory Essays

    Project Management

    • 305 Words
    • 2 Pages

    1. If I were in Lauren’s shoes, I would make sure it’s clear to the strategic management group that my estimate – a more detail/micro estimate – came in well over their initial macro estimate. That being said, I would also provide upper management with the ideas (outsourcing, change scope, cancel project..) developed with stakeholders in the brainstorming meeting. Simply moving forward with the project after finding such a large gap in estimates would be a terrible idea that would most likely to back fire. It’s important that the executives understand major differences or flaws in the project plan.…

    • 305 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Project management week 2

    • 284 Words
    • 3 Pages

    1. Scope Management Plan a. Collect Requirements b. Define Scope c. Create WBS d. Verify Scope e. Control Scope 2. Collect Requirements a. Inputs i. Project Charter ii. Stakeholder Register b. Tools and Techniques i. Interviews ii.…

    • 284 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    CIS 600 Information Technology and Project Management Fall, 2013 Class Coordinators: Dr. Bob Rademacher, SCs, & Graduate Students Office Hours: Rockwell 235 MWF 10:30 a.m. & 1:30 p.m. Cell Phone: 970-412-6844 Home Phone: 970-223-9369 Business Email: bob.rademacher@biz.colostate.edu Personal Email: bob.rademacher@comcast.net Course Prerequisites: Computer class, energy and enthusiasm! Required Texts: & Schwalbe, Kathy, Information Technology Project Management, 7th Edition, Course Technology, 2014. ISBN-13:9781133526858…

    • 492 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Discuss the process of defining project scope in more detail as a project progresses, going from information in a project charter to a project scope statement, WBS, and WBS dictionary.…

    • 1086 Words
    • 5 Pages
    Good Essays

Related Topics