1.0 PURPOSE: To establish a procedure for check in and out for washing and the piston filler assembly.

2.0 SCOPE: This procedure applies to Maintenance, Sanitation and Production Departments.

3.0 RELATED PROCEDURES: ALL-SSOP-002-00, GMPS, and GDP’s.

4.0 RESPONSIBILITY:
4.1 The filler area representative, Sanitor, Line Mechanic, Line Lead, and Material Handler must follow this procedure.
4.2 Production Manager and Production Supervisor are responsible for training and auditing the team for compliance to this procedure.

5.0 PPE: This procedure requires that chemical resistant blue aprons, protective eyeglasses, protective gloves and hair net be worn during the entire span of the procedure.

6.0 PROCEDURE:
6.1 When production is finished:
…show more content…
This requirement is to keep track of what equipment is being turned in at the end of the run. 6.1.2 Follow the guide sheet (Visual Standard Procedure MNT-VSP-002…(see image below). This VSP has the same corresponding numbers as the check-in / check-out inventory of component parts, use it to compare against what you are looking at when the check-in / check-out inventory as the parts list is filled …show more content…
The Sanitor at the three compartment wash station fill out the Post Wash Check out list (printed as a label) by completing the Post-Wash Inspection Label (do not remove backing since this will be adhered to the Bill Of Materials sheet at the line.
b. The Fill-O-Matic cylinder and nozzle must be taken to the filler control area in the same tray
6.1.5.b.1 There, a trained filler control area representative shall assemble the Fill-O-Matic cylinder pump and nozzle by checking off the components in the item list as they are being assemble following the VSP on page 2 of this SOP. 6.1.6 After the Check Out Prepared by and date is complete fill area representative must:
6.1.7 Reassemble the cylinders for stock or immediate use.
6.1.8 The person material handler or line mechanic receiving the tray with the assembly must sign off on the Checked Out by, date and hour.
6.2 Please note that if there are parts that need identification the parts shall be placed in a tray and taken to the area mechanic for equipment identification engraving. This identification is used to tell what machine the Fill-O-Matic goes on.

7.0 Revision History:
Revision Date Requested By Why Revised
00 New

You May Also Find These Documents Helpful

  • Powerful Essays

    Nvq 2 Carpentry

    • 3480 Words
    • 14 Pages

    Health and Safety control equipment identified by the principles of protection which should be used relating to the use of first and second fixing components and also the setting up and use of cutting and shaping machines for different purposes in the work situation and general work environment, should not be carried out without personal protective equipment (PPE), respiratory protective equipment (RPE) and local exhaust ventilation (LEV). An operative should always comply with the site procedures and site working methods.PPE kit can slightly vary depending on the specific work conditions.…

    • 3480 Words
    • 14 Pages
    Powerful Essays
  • Better Essays

    Hsc Assessment 2029

    • 879 Words
    • 4 Pages

    I wear PPE (disposable plastic gloves and aprons) to ensure I comply with procedures, policies and protocols. The PPE must be worn and removed in the correct sequence e.g. remove the apron and roll it etc. to prevent contamination.…

    • 879 Words
    • 4 Pages
    Better Essays
  • Good Essays

    Step 4: The cement and casing are then pressure tested to ensure hydrocarbons and other fluids don’t seep out.…

    • 724 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Zonar Training Manual

    • 6623 Words
    • 27 Pages

    Equipment Description...............................................................................................3 Inspection Zones ....................................................................................................4-5 Reading Tags..........................................................................................................5-7 Pre-Trip Process ........................................................................................................7 Post Trip Process.......................................................................................................7 Child Check ...............................................................................................................7 Engine Check ............................................................................................................7 Reviewing Inspections ............................................................................................7-8 Admin and GPS Training.......................................................................................8-12 Review and Clearing Inspections..............................................................................12 GPS.........................................................................................................................13 Reports ..............................................................................................................14-16 Appendix A.........................................................................................................17-19…

    • 6623 Words
    • 27 Pages
    Powerful Essays
  • Satisfactory Essays

    Technician identifies and red tags equipment deemed unrepairable. The technician fills out the appropriate paperwork and submits it the shop supervisor (SS). The SS transfer the equipment to QC in order for the QC reps to close the work orders and ensure the items are unrepairable. The QC manager (QCM) transfer the equipment to PRC DRMO and picked up by the inventory manager (IM) once it is confirmed unrepairable. The IM performs a MIGO _GI to remove the equipment from our warehouse stock and to generate a 1348. The IM places one copy of the 1348 on the outside of the pallet, five copies on each item on the pallet, and one copy for records. The equipment is wrapped up and placed in the DRMO cage to await for pick. The IM provides a copy of the 1348 for the DRMO reps to stamp prior to removing the equipment from the warehouse.…

    • 425 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Full Assignment Unit 202

    • 2104 Words
    • 10 Pages

    Provide information, training, instruction and supervision - ensure staff are aware of instructions provided by manufacturers and suppliers of equipment…

    • 2104 Words
    • 10 Pages
    Powerful Essays
  • Good Essays

    Riordan Manufacturing

    • 390 Words
    • 2 Pages

    The Receiving Clerk enters the information into the Inventory PC: the type of raw materials, vendor, and quantity.…

    • 390 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Assignment 302

    • 385 Words
    • 2 Pages

    Personal protective equipment includes: gloves, masks/respirators, eyewear (face shields, goggles or glasses), caps, gowns, aprons and other items. These types of PPE reduce infection spreading from staff to patients or patients to staff. For example gloves protect hands from infectious materials and protect patients from…

    • 385 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Health and safety - Ensure all fire exits are kept clear. Ensure all patient walk ways are clear.…

    • 700 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    8. Remove the pump handle from the station pump and put the nozzle in your car’s gas tank.…

    • 540 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    The Employer has to provide suitable and sufficient protective clothing and equipment for all employees to use and employees to use it. Type of PPE in a salon could be: disposal gloves, overall or apron.…

    • 281 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    One important S.O.P procedures involves personal protective equipment to eliminate the possibility of cross contamination. Employees working in each room are clearly identified according to the task in which they are conducting. For example, in what is classed as the “dirty room”, primary sterilisation area you must wear green scrubs, gloves, eye protection and plastic disposable aprons. However for the clean room, you must wear blue scrubs and white clogs and a hair net. All employees are expected to change their attire before entering another area, the attire worn must be that of the room in which they are entering.…

    • 1046 Words
    • 5 Pages
    Good Essays
  • Good Essays

    FOD Prevention Program

    • 1053 Words
    • 5 Pages

    (3) Establish replacement tool inventory records detailing NSN/PN, nomenclature, and quantity on hand. Maintain inventory accuracy when tools are replenished/issued.…

    • 1053 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Unit C22-264

    • 602 Words
    • 3 Pages

    PPE is used to protect both me and the patient from the risk of cross-infection. Gloves should be worn whenever there might be contact with body fluids.they are not a substitute for hand washing.They should be put in the bin as soon as task is done.…

    • 602 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Nt1310 Unit 12

    • 348 Words
    • 2 Pages

    Installations are to be complete, ready for operation and fully integrated and co-ordinate with all other work…

    • 348 Words
    • 2 Pages
    Good Essays