Preview

Modernization Project

Satisfactory Essays
Open Document
Open Document
307 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Modernization Project
Modernization Project

Georgian Railway LLC has started implementation of the Railway Modernization Project. The main objectives of the Project are:
· optimising freight and passenger traffic;
· optimising stations, depots and infrastructure;
· optimising freight and passenger rolling stock;
· reducing operational expenses;
· improving operational safety;
· improving social and environmental safety;
· increasing train speeds; and
· introducing a clear and defined maintenance programme. This project focuses primarily on the mainline that runs from Tbilisi to the Black Sea, in particular to the terminals at Poti and Batumi. As part of the project, the Company intends to modernise the railroad and electric supply infrastructure between Tbilisi and Batumi (315 kilometres), including the 40-kilometre mountainous gorge region in Central Georgia, with the aim of achieving passenger train speeds of 80 km/h on the gorge section and 120 km/h on the rest of the mainline, as compared to current average speeds of approximately 55 km/h in the gorge section and approximately 65-90 km/h on the rest of the mainline.
The company engaged SYSTRA and SNCFI in 2010 to prepare a full-scale feasibility study and an initial design study for this project.
The Company expects that its purchases of the necessary materials and equipment will be finalised in early 2012. The tendering process for the work on the gorge section has already been completed and work on the gorge section is expected to begin in spring or summer of 2012. Modern rails and electric supply infrastructure has already been installed on a 40 kilometre section of the line. In addition, the Company has to date achieved speeds of 120 km/h on a 100 kilometre section of the line, and it expects to be able to achieve that speed on a further 50 kilometre stretch by the end of 2011. The Modernisation Project is planned to take place in stages, thereby increasing the Company’s flexibility.
The project is

You May Also Find These Documents Helpful

  • Powerful Essays

    For the completion of this program, there are many aspects that need to be discussed and completed. Strategic planning, systems implementation, Network Security, training, Network maintenance, operational inputs and staffing will have to implemented.…

    • 1160 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    This is going to be a multi-agency effort between our city and the city of Limewater as well as the metropolitan transportation council. In order for this project to take off, a great deal of intergovernmental cooperation will be needed so that burreacratic red tapes should not become an impediment for the smooth sailing of the light rail project. Everybody realizes that they have a stake in this and its timely completion will be a big relief for all parties involved.…

    • 619 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Project Plan

    • 2003 Words
    • 7 Pages

    Our company Wireless Software Inc. is an innovative Internet-based company with gross revenues of more than $35 million dollars per year. Our company will be merging with a multinational company Skyguard Software Inc. of equal size, as a result of merging it produced Navitech Software Inc and we will be responsible for developing a project plan to strategically integrate all systems, including databases and infrastructure. Navitech Software Inc. global enterprise operations would provide best software products that will benefit to both companies. This report presents recommendations that allow Navitech Software Inc. to remain successful for years to come. The network design must keep pace with the new techniques and applications and let organizations increase revenue reduce operational costs and communicate more effectively with customers.…

    • 2003 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    In return the new CPR Syndicate was to complete the railway in 10 years. With the Syndicate in place, the path of the railway was altered. The first year of construction hadn’t gone well. They only finished 230km in a…

    • 171 Words
    • 1 Page
    Satisfactory Essays
  • Satisfactory Essays

    memo1

    • 481 Words
    • 2 Pages

    The Pima and Southern Railroad (PSRR) needs to replace a 30­ mile section of its track.…

    • 481 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    |1. |Approves funding for this project? |High Speed and Intercity Passenger Rail Program (HSIPR) by the |…

    • 1144 Words
    • 5 Pages
    Satisfactory Essays
  • Good Essays

    Gov Project

    • 1453 Words
    • 6 Pages

    Although they have held such strong views in the past, their positions have dramatically changed. They did not seek Congressional consent when the United States engaged its military in Libya, nor when Obama expanded the war in Afghanistan. In both instances, members of Congress complained loudly, but the president defended his decision.…

    • 1453 Words
    • 6 Pages
    Good Essays
  • Powerful Essays

    Design Project

    • 5984 Words
    • 24 Pages

    Unit: CHCCN303A Contribute to provision of nutritionally balanced food in a safe and hygienic manner…

    • 5984 Words
    • 24 Pages
    Powerful Essays
  • Best Essays

    escalation of commitment

    • 2084 Words
    • 9 Pages

    Greening J., (2012). High Speed Rail: Investing in Britain’s Future – Decisions and Next Steps. Available: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/3648/hs2-decisions-and-next-steps.pdf. Last accessed 15th Oct 2013.…

    • 2084 Words
    • 9 Pages
    Best Essays
  • Satisfactory Essays

    Major Project

    • 465 Words
    • 4 Pages

    Efficiency as measured by the average time it takes for a mechanic to complete a job is…

    • 465 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Fistral Sea Essay

    • 1482 Words
    • 6 Pages

    site A and site B in Figure 13 : Location Plan Portreath are both located in the national grid reference of SW 65074, 45351. Both these sites will use the Battery Hill road as their primary access road to get all the necessary plant, material and labour to the main construction site. Site B does not require any additional temporary road construction to support access to the main site from the bridleway and battery hill road. Whereas due to close proximity of the neighbouring properties and site A’s location, the access road will be long and circumferencing the neighbours and national rail properties.…

    • 1482 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Gotthard Base Tunnel

    • 1157 Words
    • 5 Pages

    In the past two decades the route over Gotthard pass has been one of most important routes through the Alps for cargo and transport. Only in the past decade, statistics show a dramatic increase of amount of freight being transferred: In 1990 an estimated 40m tonnes went by road, in 2001 that had risen to 90m tonnes, with further big increases expected by 2010 Currently the freight train running on the existing narrow rail system are only allowed to carry 2000 tonnes and travelling speeds are extremely slow. The Gotthard Base tunnel was designed to cut down the amount of traffic through the Swiss Alps and extend the 2000 tonnes restriction to a 4000 tonnes load. Freight trains will be able to travel 150km/hr, while passenger trains can hit 250km/hr, cutting down travelling time by almost an hour.…

    • 1157 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    Privatization Action Plan

    • 827 Words
    • 3 Pages

    Privatization Action Plan (PAP) refers to the policy and objectives to be implemented which is in more systematic and organized. PAP consists of a two year rolling plan which is to be reviewed at the end of each year to determine the entities to be privatized in following two years. PAP is implemented to ensure that privatization efforts are channeled to appropriate priority areas.…

    • 827 Words
    • 3 Pages
    Good Essays
  • Good Essays

    The cost of a Power Transmission Line is not merely determined by path between the start and end points but many other factors. It is therefore important to consider not only the technical issues but also the impact on natural environment, the influence on local community, and various regulations during the site evaluation process.…

    • 423 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Engineering Geology

    • 266 Words
    • 2 Pages

    What geologic considerations are normally factored in highways and railways route selection, and construction. Discuss in details…

    • 266 Words
    • 2 Pages
    Satisfactory Essays

Related Topics