[edit]Background of the project
Jakarta is the capital city of Indonesia. It is an urban metropolis with over 8 million inhabitants. It is predicted that over four million residents of the surrounding Jabodetabek area commute in and out of the city each working day. Transport issues have increasingly begun to attract political attention and it has been estimated that in 2020 without a major transportation breakthrough traffic jams will overwhelm the city. Since 1980 more than twenty-five general and special subject studies have been conducted related to possible Mass Rapid Transit (MRT) systems in Jakarta. One of the major reasons for the delays in tackling the problem was the economic crisis of 1997-98. Before the crisis a Build-Operate-Transfer (BOT) scheme was considered as part of a new MRT calling for private sector involvement. After the crisis, the plan to rely on a BOT to provide financing proved infeasible and the MRT project was again proposed as a government-funded scheme.
Current public transportation in Jakarta mainly consists of various types of buses, starting from the very small bemo and pickup sized mikrolet, to slightly larger minbuses and full sized city buses. There are also both two and four wheeled taxis. Current transport systems include widely used MetroMini and Kopaja cheap minibuses, and the TransJakarta bus rapid transit system, and the Jabodetabek Commuter Railway.
[edit]Lines
The rail-based Jakarta