National Cranberry Cooperative (Abridged)
Here’s the problem, gang…
We now that the bottleneck in the process is the Drying unit. Using the diagram, we can assess: 1. TPT is 19,000*.7 wet barrels/12 work hrs in work day = 1108 wet bbls per day 2. The dryer unit can process 600 bbls wet cranberries per day
Looking at the process we know that there is a bottleneck at Drying unit: I. The capacity of the drying unit is 600 bbl /hr which is much lower than the required 1108 wet bbl/day we need. II. On an average day a total of 10,000 bbl is received out of which 7,000 bbl is wet. At an average processing rate of 600 bbl /hr it will take 11.67 hours to process. Assuming normal working day of 8 hours, there is an overtime of 3.67 hours for each member of the crew on each average working day. III. On a peak day a total of 19,000 bbl is received out of which 13,300 bbl is wet. At an average processing rate of 600 bbl /hr it will take 22.17 hours to process. Thus, there is an overtime of 14 hours.
Lack of drying capacity is one of the major reasons for the increase in overtime cost.

Another reason is the increase in percentage of wet cranberries. * Waiting time for trucks: Inventory build up = arrival rate – processing rate = 1108 bbl – 600 bbl = 508 bbl at this rate the wet bins will be filled in 3500/508 = 6.89 hours. At the end of the day (12 hours) there will be 450*12=5400 bbl in inventory. Out of this 3,500 bbl will be in bins and rest 1,300 bbl will be in trucks. It will take 1,300/600=2.17 hours to empty the waiting trucks. Thus, inventory will start building from 6.89 hours to 14.17 hours. The average waiting time will be (14.17-6.89)/2=3.64 hours. On an average there will be 1300/75 = 17.33 trucks waiting. Thus, the total waiting time will be 17.33*3.64 = 63.08 hours.

Ways to reduce the overtime cost and waiting time:
Install more drying capacity: Add 1 more dryer:
Overtime for each member on average day: On an average day a total of 10,000 bbl is received out of which

You May Also Find These Documents Helpful

  • Good Essays

    Schonberger Case

    • 757 Words
    • 4 Pages

    The flow-time data is described at "as short as about five days for a few lots, but we are quoting six weeks to markings." A rough average was achieved "by putting pieces of colored tape on a few molded bases from several lots over the space of three weeks. The average flow time, found by noting how long it took for the taped units to get to final prep, was seven weeks. One week of that was the flow time from the start of the drill-and-tap to assembly.…

    • 757 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Spmproject File

    • 667 Words
    • 3 Pages

    4. On average, how long will the trucks have to wait on a busy day? Assume a 11am start of processing of berries and a continuous arrival rate of berries of 1,500 bbls/hr.…

    • 667 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    3. Suppose that a peak harvest-season day involves 18,000 barrels of berries, 70% of them wet harvested, arriving uniformly over a…

    • 1037 Words
    • 5 Pages
    Satisfactory Essays
  • Powerful Essays

    Capacity of the dumpers is 3,000 bbl / hr (it takes on average 7.5 minutes to dump a truck, a truck holds on average 75 bbl so, from Little 's Law, each dumper will take 600 bbl/hr).…

    • 1348 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    4. On average, how long will the trucks have to wait on a busy day? Assume a 7am start of processing of berries.…

    • 426 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Kristens Cookies

    • 669 Words
    • 3 Pages

    2. How many orders can you fill in a night, assuming that you are open four hours each night? (Assume that the system is in steady state when the process starts).…

    • 669 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    NCC Case Question 3 And 4

    • 368 Words
    • 4 Pages

    Rate of Arrival = 1500bbls/her = 20*75 = 1500 bbls/hour = 20 trucks/hr (since the average truck delivery is 75 bbls)…

    • 368 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    Since we have a processing capacity of 16,000 bbls per day, where 70% (11,480) are Wet and 30% (4,920) are Dry, there are constraints of 957/hr and 410 bbls/hr respectively [see Exhibit 1]. The plant starts getting truck deliveries at 11:00 AM at a rate of 18 trucks pre hour, but these trucks need to wait until 7:00 AM when the employees arrive for their work day, and the plant opens up. This ultimately creates a problem that NCC is most aware of, as they do not want truckers waiting around doing nothing in the parking lot. However,…

    • 1079 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Management Examination

    • 679 Words
    • 4 Pages

    The table also gives the number of workers at each station. What is the capacity of this process (in units per minute)?…

    • 679 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Flow Rate

    • 1997 Words
    • 8 Pages

    Chapter 3 introduced the three basic building blocks of process flow namely the (average) flow time, (average) flow rate and (average) inventory. It is followed by a sequence of three chapters, 4, 5 and 6, which examine each one of these measures individually. Chapter 5 is concerned with flow rate analysis and issues of capacity. The major managerial concept discussed in the in the chapter is that of the bottleneck. We use the notion of the theoretical capacity as a practical and easy to grasp introduction to this topic.…

    • 1997 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Donner Case

    • 973 Words
    • 4 Pages

    * This means that Lamination and exposure are the bottle neck of the process, and the cycle time for this step will be 22 min / panel. Which means that the capacity will be 2.7 panels / hour…

    • 973 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Dore-Dore Q&a

    • 466 Words
    • 2 Pages

    1. What is Dore-Dore’s motivation to converting to cells? Should the company continue with its plans for complete implementation of cells in children knit wear? If not, which knitwear products are best made in cells?…

    • 466 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Manzana

    • 993 Words
    • 4 Pages

    The immediate recommendation is to allocate one-third of the Rater’s working hours to assist the distribution team as this will lead to a flow rate of 40 requests per day for distribution and 37 requests per day for rating (Appendix 2 – Page 9 – Process analysis (Revised)).…

    • 993 Words
    • 4 Pages
    Good Essays
  • Good Essays

    At this rate, the wet bins would be completely filled at 3:25pm. At 7:00pm, when the last truck has arrived at RP1, 4,560 barrels of wet berries would have accumulated, of which 1,360 barrels would be on the trucks. With the plant processing rate of 600 barrels per hour, the trucks would be emptied by 9:16pm with the last truck having waited for 2 hours 16 minutes. The entire process stops at 2:36am, with the total processing time of 19 hours 36…

    • 1691 Words
    • 7 Pages
    Good Essays
  • Good Essays

    Fluid Catalytic Cracking

    • 3780 Words
    • 16 Pages

    (5,300,000 barrels) per day of feedstock and FCC units worldwide processed about twice that amount.…

    • 3780 Words
    • 16 Pages
    Good Essays

Related Topics