Certificates Sheet
(2011 Specifaction) IGC3-THE HEALTH AND SAFETY PRACTICAL APPLICATION sheet number _01 of _08_
Student Name Hazrat Ullah ___________ Student number 00262421 Place inspected KARKON CONSTRUCTION COMPANY Date of inspection 27/11/014
Observation
Hazards and consequences
Control Measures Immediate and longer terms action
Timescale
1-Workers carrying building rocks from dumping point to foundation basement (distance 30 mtr approx)
Manually.
Increasing risk of manual handling will lead to server back injury over a period of time. WRULD, fatigue.
Carry out manual handling risk assessment
Provide team mechanical lifting aids.
Provide forklift truck to bring heavy rocks near to the site
Immediate
01 week
2 weeks
2-Workers were picking up the cement filled baskets in stooping position from cement mixer during concrete work. Hazard of ergonomics.
Possible risk of back pain and lower back injury over a period of time.
Provide stands under cement mixer to help workers avoid stooping while lifting
Arrange conveyor lifting for concrete pouring.
Arrange concrete pouring machine
2 days
4 days
2 weeks
3- Worker was seen using hand drill on a side wall at nearly 4 m height at work platform without guard rail and toe boards possible falling of person and falling height.
Risk of serious injury and fines as result of enforcement action
Stop the work, provide full body harness
Scaffolding must be inspected by competent person, Provide suitable guard rail and toe board
Monitor work at height activity
Immediate
2 days
regular
INTERNATIONAL GENERAL Candidate’s observation CERTIFICATE sheet (2011 specification) IGC3-THE HEALTH AND SEFETY PRACTICAL APPLICATION sheet number _02 of _08_
Student Name Hazrat Ullah ___________ Student