BAE Automated Systems (A): Denver International Airport Baggage-Handling System
Critical Factors

*A change in the project specifications after the freeze date was agreed up on in the contract. These changes created a domino effect of problems. This was in violation of the contract with BAE which stated there would be a number of freeze dates for mechanical design, software design, and permanent power.

*A lack of efficient and effective communication between the city, project management team, and consultants. This manifests itself in basic issues like vendors blocking roadways for other vendors, the city canceling orders for electrical filtering components that were critical path, and too many unilateral decision made because "no one was in charge".

*A late start with respect to deciding the type of technology to be used for the baggage handling system. BAE didn't even bid on the project because the scope and the timeline were not feasible. The city, under the guidance of Chief Airport Engineer Slinger arranged the deal that included penalty and time clauses for both the city and the vendor.

*The City of Denver did not listen to the requested and needed amount of time to actually construct the baggage handling system. The City had a deadline to meet and did not want to hear about any more delays. In spite of this, the vendors wrote contracts that attempted to cover their bases to ensure these deadlines would be met. In the end, extenuating circumstances conspired to prevent these dates from being met.

*BAE lost control of their project to the PMT that had no experience in airport construction, baggage handling system technologies, and the introduction of the new technologies. PMT forced BAE to modify their management structure and project approach to fit the PMT needs. BAE had a track record of success using their own management structures. This modification created confusion, inefficiency, and ultimately failure.

*2 major changes in personnel. The resignation of the head of the DIA project in May 1992 and the death of Chief Airport

You May Also Find These Documents Helpful

  • Good Essays

    Airborne Express also differentiates itself from competitors in several ways operationally. Airborne Express owns the airport in Wilmington that serves as its major hub. As a result, Airborne does not have to pay landing fees, unlike its competitors, and can tailor the facility to its needs. These cost savings are partially offset by the fact that Airborne is unable to share facility expenses with other airlines. In addition, Airborne had built warehouse space on its Wilmington property which is leased to business customers. Airborne’s competitors such as FedEx and UPS offer similar warehousing options but not on the airport site itself. Airborne is able to reduce property tax arising from owning this facility by possessing the Community Reinvestment Act zone status.…

    • 1049 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Law 531 Memorandum

    • 981 Words
    • 4 Pages

    This memo is in response to the dispute over the contract between Span Systems and Citizen-Schwarz AG (C-S). Management is taking the necessary steps in resolving the issues C-S is reporting of low quality deliverables and schedule delays. C-S is threatening rescission of their contract and demand immediate transfer of all unfinished codes (University of Phoenix, 2002, Legal Environment of Business: Contract Creation and Management, Law 531). C-S must prove a material breach is occurring and give adequate notice to Span Systems to issue a rescission (Cheeseman, 2010). Span Systems and C-S signed a one-year contract worth $6 million dollars that has five clauses for breach of contract and a project structure clause. This memo will identify what management is doing to avoid legal risks, minimize liabilities, and benefit from opportunities presented to make this contract successful.…

    • 981 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    6. Lack of resources from contractors – job site will be full of equipment and materials that have yet install. As result would cause equipment shipment would put on hold and delay in deliver date. Also equipment will not able to install on time due to negotiation with equipment technician specialist…

    • 1078 Words
    • 5 Pages
    Good Essays
  • Good Essays

    LONDON AMBULANCE SERVICE COMPUTER AIDED DISPATCH FAILURE 1992 #1. Summarize all aspects of the system failure based on the mind map across references (350 words) The LASCAD system was launched on October 26, 1992 and it failed miserably on the very first day for various reasons, causing major delays in ambulance dispatch. The process was non optimal, some times many ambulance units where sent to the same scene.…

    • 589 Words
    • 3 Pages
    Good Essays
  • Good Essays

    In the early 1980’s, Denver experienced significant economic growth due to the booming oil, real estate, and tourism industries. The major airport that operated within Denver during that time was the Stapleton Airport. Up to 1970, the Stapleton Airport was able to accommodate the demands of Denver but in subsequent years it was unable to meet the ever growing needs of the city. The Stapleton Airport was seen as a liability and limited the attractiveness of businesses that were swarming to it. Issues with handling high traffic volume, disruptions in connection schedules, and an overall poor airport layout led the city of Denver to decide whether they wanted to expand or replace the Stapleton Airport. A study performed in 1983 determined that an expansion of Stapleton’s capacity was needed.…

    • 1695 Words
    • 7 Pages
    Good Essays
  • Good Essays

    BAE Case Study

    • 908 Words
    • 4 Pages

    Ineffective coordination between BAE and airlines: poor communication and cooperation experiences among both parties during the project. The ineffective collaboration caused…

    • 908 Words
    • 4 Pages
    Good Essays
  • Better Essays

    Senior Management

    • 1685 Words
    • 7 Pages

    6) Lack of project ownership from the senior management team – It was only Frank Carau and Ben Walker, who are juniors that are handling the project. It does not have enough clout to direct and influence the project on the senior management levels. However, with the leadership and sponsorship of Phil Faraci, the project came into a turn-around from being a slow-paced to fast-paced project, from being a…

    • 1685 Words
    • 7 Pages
    Better Essays
  • Satisfactory Essays

    Week 5

    • 548 Words
    • 3 Pages

    b. Government agency permits for construction delays. c. Telecommuting. d. Missing tools for the construction. e.Unstrict management. They would need to…

    • 548 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Annotated Bibliography

    • 680 Words
    • 3 Pages

    Assaf, S.A. and Al-Hejji, S. (2006) Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-57.…

    • 680 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Construction of towers were already behind the schedule; HQ reluctant to terminate the contract since the former company did a great deal of work on the construction…

    • 346 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Boeing 767 Case Study

    • 1104 Words
    • 5 Pages

    1. How would you describe Boeing’s approach to project management? What are its strengths and weaknesses?…

    • 1104 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Review each of the following scenarios and identify the risk events, the probability of those risks, and the impact of the risk events. Some scenarios may have more risks than others.…

    • 409 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Activity #1The first activity involved a complaint among 40 baggage handlers and how they were expending extra effort in carrying out their duties, which was due to the increase of passenger traffic at the airport. The handlers stated their compensation has not been a reflection of it. Senior management has requested that a review of the existing compensation structure be performed and to consider adding more benefits, if necessary, along with putting together a new compensation plan to include a mix of cash incentive and non-cash benefits.…

    • 1069 Words
    • 5 Pages
    Good Essays
  • Better Essays

    1. No proper project structure - this made the execution and management of the project very ineffective.…

    • 1618 Words
    • 7 Pages
    Better Essays
  • Satisfactory Essays

    Business Trip to Brussels

    • 258 Words
    • 2 Pages

    • Delay in flights – which made its customers to wait anxiously for a signal to board their flights (arrival) – overcrowding.…

    • 258 Words
    • 2 Pages
    Satisfactory Essays