By Nawaf AL-Otibi
Introduction
Biomedical engineering is different from the rest of the other fields of engineering, which is integrating with the knowledge of human body systems and engineering. The role of biomedical engineering is helping the patients in terms of proper diagnosis by a medical device and also provides the safety and quality the medical device in terms of use the device, that enters in the design of the medical device. The design of the medical device is relating to project management, that compatible with high standards and providing the health care projects a high quality of medical devices.
THE BIOMEDICAL ENGINEER FIELD
Overlapping field of biomedical engineering in the field of medicine …show more content…
The field of biomedical engineering is helping doctors in diagnosis patients in fast time and high accurate. So, that reduces the diagnosis time and gives accurate data for the test results.
MEDICAL DEVICE AND IMPACT TO SOCIETY
Some devices work as an alternative member for affected members in the human body from disease such as kidney or heart or lung or as an alternative members that lost in an accident such as a foot or leg or knee.
Medical devices Operate is helping patients in an accurate diagnosis, which doctors depends upon them and with the modern technology for medical devices that allowed the doctors diagnosis his patients from a long distance and communicate with them, such use of Internet and Wi-Fi, which called "Telemedicine".
The medical engineering that combined of medicine and biological is Disseminating of knowledge in the community, providing leadership in the field, professional development, and development of standards that ensure patient safety.
BIOMEDICAL ENGINEER AND PROJECT MANAGEMENT
There are two types of project management in biomedical …show more content…
Being the project of health care on several stages, as follows:
Medical device planning, which is could change the medical equipment through the project or as long as lifetime of the building. Example, preparing the specifications for medical devices and request based on the requirements of the project and the services that will be provided by the project during the project or later.
During the project like, If the project requires implemented within two years, during this two years create modern medical products are better than a previous year, it should change the specifications to the latest technologies in the market according to the contract agreed upon.
Later like, If the customer need to replace for medical devices of the building in the future, should not be a hindrance in terms of installing new hardware and provide a plan to avoid these obstacles.
So, there are planning to change the medical devices and decision-making through the implementation of the project and in the distant