Preview

Case Study 5.1 Area Requirements

Good Essays
Open Document
Open Document
823 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Case Study 5.1 Area Requirements
Chapter 5

NEEDS

5.1 Area Requirements Summary
The area requirements refer to the spaces of the built environment represented in square meters that will be used by the end users with efficiency and effectiveness. In order to achieve the needs for each function, careful planning, consideration and proper use of each area requirements must be thoroughly studied. These needs will help achieve adequacy, quality and a well-organized space for the use of the occupants. The propose complex is composed of seven general spaces and three service facilities which are subdivided and distributed in the site according to their particular functions. Every structure is planned carefully for easy access when navigating from building to building. Each facility
…show more content…
The detailed area requirements of these outdoor facilities are enumerated on Table 5.3.1.

5.4 Parking Requirements
Standards and Regulations were followed in planning the parking lot. Presented in Tables below are the parking slot tabulation and the parking area computation. The sufficient availability of parking places for handicapped were provided in all cases and this was regulated by law. In designing parking lots for the Urban Entertainment Complex, BP 344 is observed and included in the design and planning. One accessible parking slot is provided for the handicapped per 50 parking slots up to 150 slots and an additional slot for every 100 slots thereafter.
5.5 Land Use Requirements
Land use requirements refer to the use of the land area for the different facilities of the project. Diagram 5.1 shows the allocation of land area to the different facilities.
5.6 Budget Estimates
…show more content…
The facilities of the Urban Paradise Project only utilized a small portion of the Davao City land area. The land price presented is according to the zonal land value ordinance of Davao City. The proposed project located at Prurok 26 Riverside Ma-a Street Davao City is under the park and recreation zone of the city zoning ordinance. Presented in the table below is the land acquisition cost of the project.
Expenditures are expected to rise by an average of 5% per year based on market industry analysis.
5.6.1 Estimated Building Cost Table 5.13 below shows the building cost estimate based on the detailed area sizes and requirements.
5.6.3 Tourist Analysis. The table below shows the projected guest visitors which indicators were taken from a discussion material prepared by Romulo A. Virola entitled Tourism Statistics in Davao City. An average of 680,000 tourist visits in the locality every year is distributed as follows: (The proponent estimated an average market share of 15%)
5.6.4 Project Revenue The revenue sources for the UED are summarized as follows:
Income from Mixed-Use Entertainment Complex
Entry Fee to the amusement park- escalated at 5% every year
Income from Hotel

You May Also Find These Documents Helpful

  • Good Essays

    nt1330 unit 1

    • 565 Words
    • 3 Pages

    There are many factors involved in this scenario. For example, the building may lend itself to certain network designs. You may have multiple floors or a single floor, Multiple data closets or just one. You may have virtualized servers or desktops. You will want to accommodate all these into your design. 50% may seem like too much now, but realistically, 200 or 300% might be more accurate.…

    • 565 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    function of the new building is to provide office space for software development and testing of…

    • 2372 Words
    • 13 Pages
    Powerful Essays
  • Satisfactory Essays

    Case Study 5.1

    • 663 Words
    • 3 Pages

    Description: Smith is the Chairman of Cardillo Travel Agency, he just involved into a case that whether to sign the affidavit with United Airlines. Because he inspected that there is something wrong with the affidavit concerning Cardillo’s stockholders’ equity, so that he refused to sign affidavit. Just for this reason, he was kicked out from his position. Moreover, the other two of his executives Rognlien and Lawrence, just approved the $203,000 adjusting entry recorded link to Airlines-Cardillo transaction. Afterward, Helen Shepherd, an auditor of Touch Ross, found the mistake that the money cannot be recorded for the payment to Cardillo was refundable under certain conditions and thus not immediately as revenue, so she questioned Rognlien and Lawrence, but they still insisted the entry of the money has been properly recorded. And one year later, R and L just dismissed the Touch Ross accounting firm and hire KMG as their public accounting firm. After the turnover of KMG, they just founded this matter too, and resigned as the independent audit firm.…

    • 663 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Hnc Forms of Construction

    • 3301 Words
    • 14 Pages

    Contents 1.0 Introduction 2.0 Methodology 3.0 Inception 4.0 Feasibility 4.1 Overview of stage 4.2 Assessing the feasibility 4.3 Site investigation 4.4 Effects on design 5.0 Then brief 5.1 Overview of stage 5.2 What the brief should cover 5.3 What the brief should include 5.4 Consultants at this stage 6.0 The concept/outline proposals 6.1 Overview of stage 6.2 Requirements to proceed with concept design 6.3 Developing the brief into concept design 6.4 Planning permission 6.5 Building regulations approval 6.6 Achieved at this point 7.0 The design development 7.1 Overview of stage 7.2 Developing the design 7.3 Finalisation of design 7.4 Planning proposal 7.5 Building regulations 7.6 Sampling and testing 7.7 Health and Safety 7.8 Achieved at this stage 8.0 Technical design 8.1 Overview of stage 8.2 Implications on design 9.0 Production phase 9.1 Overview of stage 9.2 Design implications 10 Other construction projects…

    • 3301 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    My project proposal will examine the highest and best use for the Gateway Site. The project located near MLK Boulevard in the new Pompano Beach, Florida. The site has a view that would be visible from the Dixie Highway. The Gateway Site also has two parcels on its location. The parcels also have two parking lots that can accommodate the structure. The current lot size is 13.33 acres, total gross buildable space is 22.35.The apace is allotted for 36 units per acre. The overall space is allocated for 80 unit’s total.…

    • 342 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Arb Part 1 Sample

    • 3118 Words
    • 13 Pages

    The project 9 Crescent Road (A) meets the required criteria by demonstrating how analysis, research, context, budget, preparation and development of a brief inform a design proposal.…

    • 3118 Words
    • 13 Pages
    Powerful Essays
  • Better Essays

    Ada and Affirmative Action

    • 1075 Words
    • 5 Pages

    Facilities under construction are to implement the scope and technical requirements during the design, construction, and alterations of the building that is covered by title II and III of the ADA. Title II reflects public entities of the disable, which include any…

    • 1075 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Healthcare Reform

    • 1372 Words
    • 6 Pages

    expenditures in the United States have risen 6.5 percent per year since 2000, and 5.5 percent per…

    • 1372 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    Ningbo Railway Station

    • 481 Words
    • 2 Pages

    The new Ningbo Station improves the city’s image which acts as the “name card" of this city, its magnificent appearance may become the “window” for nonlocal people to catch a glimpse of Ningbo City. It also mobilizes the surrounding’s environments such as communal facilities , educational institution, residential districts, and business zones. In addition, it is planned by the government to build a comprehensive park which contains public greenfield, roadside green space, and little squares, in order to advance citizens’ dwelling environment where they can walk, rest and taking exercises.…

    • 481 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Industrial Ventilation

    • 5825 Words
    • 24 Pages

    This course is adapted from the Unified Facilities Criteria of the United States government, which is in the public domain, has unlimited distribution and is not copyrighted.…

    • 5825 Words
    • 24 Pages
    Powerful Essays
  • Satisfactory Essays

    Sakae Sushi

    • 334 Words
    • 2 Pages

    We provide guidelines on site selection and space management. The construction team will visit the site you have selected, assess the location, before working on the design and layout of the outlet. The outlet will be renovated and furnished so that it is ready for operation.…

    • 334 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    rizal revolutionary ideas

    • 420 Words
    • 2 Pages

    The Philippines welcomed a total of 4,272,811 foreign visitors in 2012, posting a 9.07% increase from 3,917,454 visitors in 2011. This marks the first time in the country’s tourism history to surpass the 4 million visitor arrival mark.…

    • 420 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Feasiblity

    • 11316 Words
    • 46 Pages

    The establishment is composed of different areas which correspond with their functions such as the main dining area and the dining area in the veranda of our shop, the kitchen which includes the preparation area, cooking area, and the storage of our items, a small locker area for the safety and storage of the employee and staff belongings, and a mini stage for the performance of students during events who wish to be watched by the public.…

    • 11316 Words
    • 46 Pages
    Good Essays
  • Powerful Essays

    Requirement Sheet

    • 1693 Words
    • 7 Pages

    As the name implies, this is a place where in Business permits and licenses are dutifully processed. It is located at the ground floor level of the Municipal Hall because it is one of the most visited – therefore, one of the busiest – offices in the building, hence, it was strategically placed on the Ground floor for easy access and organization – most of the busiest offices, within the building, are situated on the said level. It is an enclosed space, which clearly sets the boundaries of the employees from the clientele, providing both system organization and privacy. A waiting area is provided for the clientele, in front of which are the processing cubicles – that also acts as a division/partition of the waiting area from the office proper. A small room of 17.64 sQm., was allotted for the safe keeping of the papers and other important documents processed within the department.…

    • 1693 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    Impact Mitigation

    • 6259 Words
    • 26 Pages

    The Development of a new housing complex which has 296 housing sites. Will approximately 35.68 ha of land located near the Vaalriver. The proposed housing units will be serviced with electricity, potable water, and waterborne sewage and tarred road.…

    • 6259 Words
    • 26 Pages
    Powerful Essays