Preview

Clarification of Bidding Documents by a Prospective Bidder

Good Essays
Open Document
Open Document
448 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Clarification of Bidding Documents by a Prospective Bidder
7.1 A prospective Bidder requiring any clarification of the Bidding Documents shall contact the Employer in writing at the Employer’s address indicated in the BDS or raise his enquiries during the pre-bid meeting if provided for in accordance with ITB 7.4. The Employer will respond in writing to any request for clarification, provided that such request is received no later than twenty-one (21) days prior to the deadline for submission of bids. The Employer shall forward copies of its response to all Bidders who have acquired the Bidding Document in accordance with ITB 6.3, including a description of the inquiry but without identifying its source. Should the clarification result in changes to the essential elements of the Bidding Documents, the Employer shall amend the Bidding Documents following the procedure under ITB 8 and ITB 22.2.
7.2 The Bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the bid and entering into a contract for construction of the Works. The costs of visiting the Site shall be at the Bidder’s own expense.
7.3 The Bidder and any of its personnel or agents will be granted permission by the Employer to enter upon its premises and lands for the purpose of such visit, but only upon the express condition that the Bidder, its personnel, and agents will release and indemnify the Employer and its personnel and agents from and against all liability in respect thereof, and will be responsible for death or personal injury, loss of or damage to property, and any other loss, damage, costs, and expenses incurred as a result of the inspection.
7.4 The Bidder’s designated representative is invited to attend a pre-bid meeting, if provided for in the BDS. The purpose of the meeting will be to clarify issues and to answer questions on any matter that may be raised at that stage.
7.5 The Bidder is requested, as far as possible, to

You May Also Find These Documents Helpful

  • Good Essays

    Pm 598 Week 2

    • 702 Words
    • 3 Pages

    All bids must be itemized along with Labor and Materials broken out. Working hours are from 7:00 AM to 7:00 PM, 7 days a week. Weekend work is not required however, if you are including weekend work in order to meet or beat the schedule please make note of it. All insurance information must be submitted with your bids confirming all of you workers compensation etc. is up to date. Additionally please submit your company’s safety…

    • 702 Words
    • 3 Pages
    Good Essays
  • Good Essays

    The surveyor conducted a site visit…

    • 663 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    When a procuring agency fails to adhere to the regulations and/or the terms listed within the solicitation, a bid protest may be filed (Nacke & Ralston 2011). A bid protest is a tool that a contractor can use to legally contest the process or result of a government contract award. In order to file a protest, one must be considered an interested party, meaning they are an offeror or prospective offeror who would be financially affected by either the award or the non-award of the contract. There are three different types of protests available to contractors. Each has differing procedures but they share the main requirement; In order to win, they must provide supporting information which would prove that they have been prejudiced by the government agency. The two most common forms of bid protest are the agency-level protest and the Government Accountability Office (“Bid Protests,” 2010).…

    • 4029 Words
    • 17 Pages
    Powerful Essays
  • Satisfactory Essays

    IS4799

    • 675 Words
    • 8 Pages

    Page 6 RFP Procedures  Contact procedures • Methods to interact with client • During and after the bidder’s conference  Information opportunities • Client presentations • Supplemental information • Formal and informal questions • Questions from other…

    • 675 Words
    • 8 Pages
    Satisfactory Essays
  • Satisfactory Essays

    1. Why is vendor attendance at the RFP Bidder’s Conference mandatory as a requirement to respond to the RFP itself?…

    • 258 Words
    • 1 Page
    Satisfactory Essays
  • Best Essays

    In 1987, the trustee of a property trust employed CDG Pty Ltd (the first respondent) to design the foundations of a commercial building. The second respondent was a civil engineer employed by the first respondent and was its project manager in relation to the complex’s design and construction.…

    • 2813 Words
    • 10 Pages
    Best Essays
  • Good Essays

    Part 14 Sealed Bidding; Part 15 Contracting by Negotiation; Subpart 6.2—Full and Open Competition After Exclusion of Sources;Subpart 6.4—Sealed Bidding and Competitive Proposals…

    • 928 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Request for Proposals

    • 26335 Words
    • 106 Pages

    SECTION 1 2 3 4 5 INTRODUCTION RFP SCHEDULE OF EVENTS PROPOSAL REQUIREMENTS GENERAL REQUIREMENTS & CONTRACTING INFORMATION PROPOSAL EVALUATION & CONTRACT AWARD…

    • 26335 Words
    • 106 Pages
    Powerful Essays
  • Powerful Essays

    8 CONSULTANT’S PROPOSED DESIGN & CONSTRUCTION SCHEDULE ........................... 8 CONSULTANT DESIGN SCHEDULE ........................................................................................ 9 BID DOCUMENT CONSTRUCTION SCHEDULE…

    • 13739 Words
    • 88 Pages
    Powerful Essays
  • Good Essays

    Filing of a Draft Prospectus by Business Objects; In response to the tender offer initiated…

    • 837 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Hnc Forms of Construction

    • 3301 Words
    • 14 Pages

    Contents 1.0 Introduction 2.0 Methodology 3.0 Inception 4.0 Feasibility 4.1 Overview of stage 4.2 Assessing the feasibility 4.3 Site investigation 4.4 Effects on design 5.0 Then brief 5.1 Overview of stage 5.2 What the brief should cover 5.3 What the brief should include 5.4 Consultants at this stage 6.0 The concept/outline proposals 6.1 Overview of stage 6.2 Requirements to proceed with concept design 6.3 Developing the brief into concept design 6.4 Planning permission 6.5 Building regulations approval 6.6 Achieved at this point 7.0 The design development 7.1 Overview of stage 7.2 Developing the design 7.3 Finalisation of design 7.4 Planning proposal 7.5 Building regulations 7.6 Sampling and testing 7.7 Health and Safety 7.8 Achieved at this stage 8.0 Technical design 8.1 Overview of stage 8.2 Implications on design 9.0 Production phase 9.1 Overview of stage 9.2 Design implications 10 Other construction projects…

    • 3301 Words
    • 14 Pages
    Powerful Essays
  • Satisfactory Essays

    Assignment 5

    • 464 Words
    • 2 Pages

    A pre-proposal bidders’ conference has been scheduled for May 31, 2013 at 1:00 pm EST.…

    • 464 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    PROJ598

    • 2385 Words
    • 11 Pages

    This work shall deliver is facilities to include the construction of one baseball field that will accommodate a semi-pro baseball team, the construction of one clubhouse, and the construction of one parking area sized to hold 50 cars. A 20-acre parcel of land will be provided for the construction of these facilities, which has already been acquired. The contractor shall be responsible for the demolishing, clearing, removal, and disposal of existing buildings and trees. The site shall be evenly graded to drain away from the playing field. The Contractor shall erect a perimeter fence and security lighting. The Contractor shall be responsible to make utilities operational, to include power, water, and sewer. The Contractor shall be responsible for coordination with the utility companies. Refer to the detailed Description of Work, and Specifications and Drawings, in Sections 2.0 and 4.0, respectively, for details.…

    • 2385 Words
    • 11 Pages
    Powerful Essays
  • Good Essays

    Site work will be limited to Monday through Saturday, 0800 to 1800 according to Camp…

    • 459 Words
    • 2 Pages
    Good Essays
  • Better Essays

    Construction Management

    • 1103 Words
    • 5 Pages

    Construction contracts structure the way in which construction is purchased. There are variety between construction purchasing system and buying something in a store for instance mobile phone or sofa. When we have the finished product available for our inspection, we can decide whether it meets our requirements. Since the final product is available, we can purchase it from a single store. With the construction it works different. The facility is purchased before it is „manufactured” based on set of drawings and work descriptors. Finally item requires the purchaser to coordinate many entities to include:…

    • 1103 Words
    • 5 Pages
    Better Essays

Related Topics