B) Among lateness and tardiness, I prefer lateness for the evaluation of a schedule because the tardiness doesn’t show the value for the early-finished job. From the customer point of view, early completion of the job doesn’t bring much difference to them but from the company perspective, it matters a lot because the early completion …show more content…
The crossover is recombining the population genetic material. It takes chromosomes from two parents and exchange part of their genetic information to produce new chromosomes (Moreira et al. 1997). In mutation, the assignment of a single operation in a single parent chromosome is applied. Two different operators, assignment operators make adjustment in the property of genes. In the sequencing operators, it only makes adjustment in the process of parent genes. The major issue of application of crossover or mutation with the operation scheduling is the precedence constraints. The permutation of certain work, which should be completed before the next step, is to start. In the genetic modification of the human body, there is always the requirement of complete gene structure (guanine-cytosine and adenine-thymine) to build the whole structure. Otherwise, omission of one pattern will affect the formation of the complete structure. For example: If the painting on a product has to be done before the labelling, it has to be like that way because you cannot put the label and then do the painting job. So every work should be done in the arranged manner. The major issue of application of crossover or mutation with the operation scheduling is the precedence constraints. The permutation of certain work, which should be completed before the next step, is to start. In the genetic modification of the human body, there is always the requirement of complete gene structure (guanine-cytosine and adenine-thymine) to build the whole structure. Otherwise, omission of one pattern will affect the formation of the complete structure. For example: If the painting on a product has to be done before the labelling, it has to be like that way because you cannot put the label and then do the painting job. So every work should be done in the arranged manner. Among the different styles of journal articles, the