Certificate
Acknowledgement
Abstract
Chapter 1: Introduction
1.1 Project Summary:
Project objectives usually describe the goals or missions of the company to provide better services to customers. The project scope is being developed to describe the function that required in a system. Whereas the project schedule is needed to state the time line for all the task and follow it in order to complete the system on time. For the project team is state out the task that do by the members. Development and operation environment is required to ensure the final system can be develop in a manner way and operate smoothly after being implemented.
We discuss about the fact finding technique, system requirements, and all the UML diagrams. A complete and details requirements has to be gathered before a quality informaiton system can be produced. Hence, the process of requiremens analysis is very important. So, the fast finding techniques that we used are interview and observation. Thus, we had more understand about the restaurant workflow. Functional requiements had described the details of each modules. Requirements analysis is an important part of the system design process. Once the client 's requirements have been identified and facts collected, we are then in a position to design a solution.
Class diagram is the database structure that comprised of many classes, interrelationships between classes, operations and attributes of the classes. the database dictionary was showed all the database table with attributes name, data description, data types, key, default values and so on. “Database design is an important step in software development”.
Software testing is an important stage to ensure that the software is free of bugs. The purpose of testing is to ensure that the system will propose require function correctly, accurately, efficiency and effectively.
1.2 Purpose: Nowadays, the world is getting into digital world. System was trying to build
References: Conclusion: This project we will discuss about evaluation against the project objectives, project management issues, scope of project, system design of project, system analysis of project, report outline of project, future improvement of the project and so on.