The hourly variation of temperature for Air dry bulb temperature, wet-bulb temperature, cooling tower inlet temperature and cooling tower outlet temperature operating with ClO2 Generator for typical Summer day June- 2014 are given in table-1. From the table its seen that the evaporation losses , cycle of concentration and make-up water fluctuate the effectiveness of cooling tower compared with the at the time of manual chemicals doses. At 2:00PM in June 2014 the dry bulb temperature (DBT) is 320C, wet-bulb temperature is 240C, inlet temperature of cooling water is 30.80C and outlet temperature of cooling water is 27.80C, according to above temperature effectiveness is calculated with the help of mathematical formulae is 44%, water losses during the air is 2.75 m3/hr, in evaporation water is evaporated 1.32m3/hr during the losses make-up water is required is 8.47…