One of the main problems in this sector employers is that the concept and design phase of a contract is not exactly located .it is not clear. Therefore, a detailed and comprehensive tender documents at the disposal of contractors for the price not …show more content…
Although some of the practices and procedures of coordination of EPC contracts with contractors will be explained and expressed in the project, many employers who have single-factor method of performing industrial contracts or contracts C or PC has been used because of the sensitivity too interested in all things that are done under the supervision and control and this has led to the delay in implementing the project.
One of the benefits of EPC projects shorten the project time by overlapping the engineering, procurement and running. The ways in which the three-phase project is done individually, so buy only after the engineering and construction of the building and installation of engineering and purchasing equipment possible. But in an EPC project before completion of engineering, procurement and construction and installation work done, substantial savings are made on …show more content…
If done properly design engineering would prevent a lot of problems during labor and after many delays can be avoided. Obviously, the start of the project is dependent on the basic needs of engineering. As explained above, the employer has the right Initial studies in addition to reducing the risk Vtba "The cost of the project is to speed up administrative activities. In most projects have limited time for equipment operation and dismantling of the workshop will be considered is they need to have more accurate schedule. Typically, employers do not want to devote a lot of time designing and furnishing for the workshop as soon as possible. However, the contractor must be a good time to design or outsourcing it to a contractor The competent