Preview

1Explain the following economic principles and assess them

Powerful Essays
Open Document
Open Document
9137 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
1Explain the following economic principles and assess them
AKNOWLEDGEMENT

Professional career of a quantity surveyor is depended on the cost controlling of the project. Main professional characteristic of the quantity surveyor is cost estimating to analyze the project cost of a project correctly whether it is a contractor’s point of view or client’s point of view.
Therefore, being a professional quantity surveyor, knowledge in basic economic principles is very important feature. Economics is related to any industry in the word. Construction industry is a head one among those industries because development of a country is mainly depended on constructions and it is directly connected to the national economic of that country. If there are no implementations that country will not be able to bear their economic positions also. Therefore behavior of the economics relative to the construction industry should be known as a construction professional.
I am indeed grateful to Mr.M.R.Riyas Mohamed, assessor of Economics subject in the department of quantity surveying at British college of applied studies who taught this valuable subject in our third semester and corrected me in review sessions. Finally I thanks to all others who are not mentioned here by name, but assisted me to complete my assignment directly & indirectly.

CONTENTS
Contents
Page no
Acknowledgement

01
Introduction

02
Contents

03

1.1 Explain the following economic principles and assess them in relate to Sri Lankan construction industry (P1.1)
Limited resources
Division of labour

5-8
1.2 Explain the opportunity cost and how they are measured (P1.2)

9-11
1.3 economic systems differ from country to country, ranging in the continuum of free – market economics to command economics.

12-17
3.1 State the characteristics of perfect competition and monopoly market structures and analyze them in relation to construction industry. (P3.1)

18-20
3.2 Identify the appropriate macroeconomic concepts to

You May Also Find These Documents Helpful

  • Good Essays

    This project plans to develop a methodology to estimate future projects’ costs and their appropriate contingency reserves for changing prices in constructional projects. Based on the methodology, recommendations will be given in order to change Ministry of Construction’s policies that relates to project budgets, and how to deal with the current policies if they are not changed.…

    • 311 Words
    • 2 Pages
    Good Essays
  • Best Essays

    economics 365

    • 2287 Words
    • 10 Pages

    The construction industry has been a result of a lot of change in the past few years. The construction industry consists of small business to the very large corporation. A small business in the construction industry can be considered a simple handyman business. A large business in the construction industry can be considered a new commercial builder. With the limited barrier of entry the construction industry has been threaten by new companies entering the market. New companies entering the marking have posed a threat in which causing the existing construction companies to have a strategic plan to prevent from closing their doors. With a strategic plan in place the existing construction companies will have the tools needed to compete with newer companies entering the market.…

    • 2287 Words
    • 10 Pages
    Best Essays
  • Powerful Essays

    Sutter Medical Center Case

    • 1363 Words
    • 6 Pages

    Along with this, the history of BIM and the quantity surveyor was also considered. This was useful as it allowed the effects of BIM on a Quantity Surveyor to be analysed. This also fed in with the benefits and limitations of BIM, as well as the future of the software and its effects on the role of a Quantity Surveyor.…

    • 1363 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Stadium Contracts

    • 1057 Words
    • 5 Pages

    a discussion on the criteria which would have been used to select the procurement strategy / building contract.…

    • 1057 Words
    • 5 Pages
    Good Essays
  • Best Essays

    The cost planning is one of important phases for project management. It will goes through whole project’s life cycle. It is foundation of project and it will tell the project are measured, reported and controlled in every process. Estimating is the process of forecasting or approximating the time and cost of completing project deliverables.…

    • 2267 Words
    • 10 Pages
    Best Essays
  • Satisfactory Essays

    Resume Mehanical Engg

    • 600 Words
    • 3 Pages

    • Preparation of contract documents and evaluation of tenders for industrial construction. Prepared around 100 estimations, and performed site measurements…

    • 600 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    A brief review of text books and reports reveal that construction excellence has not only become an option but a necessity, if the UK construction industry is to survive economics dynamics and changing social needs. Considering the industry is one of the pillars of the domestic economy making approximately 10 percent of GDP and employing considerable number of workers, it is important to note that construction excellence is critical for the UK economy and its future.…

    • 1657 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    “Economic systems differ as to (1) who owns the factors of production and (2) the method used to coordinate and direct economic activity” (McConnell & Brue, 2004, p.20).…

    • 993 Words
    • 4 Pages
    Better Essays
  • Good Essays

    Economic Questions

    • 2799 Words
    • 12 Pages

    Economic system refers to the way in which the society solves the basic economic problems of scarcity of resources. Different economic systems have addressed the three basic questions in radically different ways. [Samuelson 2005, pg.7]…

    • 2799 Words
    • 12 Pages
    Good Essays
  • Powerful Essays

    What is the argumentative function of Hobbes’s ‘state of nature’ and of Rawls’s ‘original position?’ Compare these accounts and critically assess their cogency. Both Hobbes’ ‘state of nature’ and Rawls’ ‘original position’ are used to provide individuals with good reason to consent to a social contract and to accept their state. The two arguments are formulated with quite different end goals in mind. The ‘state of nature’ presents a terrifying world without reason or safety and is designed to force one to realize how unsafe they are without a state.…

    • 1720 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    S.KENNEDY & A. AKINTOYE (1995) Quantity Surveyors’ role in design and build procurement method, [online] London : Royal Institute of Chartered Surveyors. Available from :…

    • 1211 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    During building work in modern construction it is not unusual for the 1st point of contact for a client to be with a QS. Cost management is one of the key areas of concern for clients in today’s industry and with QSs being value and cost experts in the construction industry it makes sense for a QS to be relied on heavily during the inception phases as well as before. Their role as cost planner in this section of the industry can often be viewed negatively as often clients or architects change their plans after contracts and plans have been made causing a rise in the costs of the building works which in turn makes the QS look as though the job done earlier before starting the building work seem as though they weren’t accurate. The QS also has a role of dealing with contracting in this section of the industry, the…

    • 1844 Words
    • 8 Pages
    Powerful Essays
  • Better Essays

    A quantity surveyor is a construction professional whose main expertise is primarily to carry out an estimate, project cost control and quantities take off. His duties also includes commercial, risk and contract management to ensure that the party he works for get the best value for money and to allow smooth project flow form inception stage to completion stage-www.picqs.com(Philippines institute of chartered quantity surveyors)…

    • 2553 Words
    • 9 Pages
    Better Essays
  • Better Essays

    A summary of the entire report – not just the introduction. Usually 10% of the word count.…

    • 1112 Words
    • 12 Pages
    Better Essays
  • Good Essays

    Self Praise Essay

    • 566 Words
    • 3 Pages

    My reasons on wanting to be a Quantity Surveyor are varied. Its course of study have been so far interesting and thought provoking, shedding light on appreciation of the costing, economic buildability, procurement and contractual relations of the construction process- essentially an insider’s view to construction. I love how…

    • 566 Words
    • 3 Pages
    Good Essays

Related Topics