Analyzing “the Goal” as Fictional Case Study
Constraint Management at UniCo:

Analyzing “The Goal” as Fictional Case Study

Abstract

As a fictional case study, Eliyahu Goldratt’s novel about manufacturing, “The Goal: A Process of Ongoing Improvement,” presents a constraint-focused approach to production management. As a novel, the book does not emphasize the quantitative details of the plant improvements. However, a great amount of information about the plant is spread throughout the book. By collecting and analyzing this data, a concrete picture may be developed of the plant’s capacity and its improvements, which can greatly help the book’s readers understand and evaluate the cumulative impact from the plant’s “process of ongoing improvement.” Keywords: Production planning, Theory of constraints, Drum buffer rope

Introduction: The Goal as Fictional Case Study

Eliyahu Goldratt’s manufacturing novel The Goal: A Process of Continuous Improvement has inspired countless professionals in production (and many other fields (Whitford, 2004)) to embark on their own efforts of continuous improvement. As Rand (1986) writes, “It’s a novel, but it’s also a manufacturing text-book, and it’s good on both accounts.” Many reviewers have agreed The Goal is an easy-to read way to get an introduction to production realities (Belis, 1994, The Economist 1995, Dani 2006, Rand 1986). However, no one has taken a detailed look at the numbers presented in the book as a fictional case study. The concept of drum-buffer-rope (DBR) production control has been discussed considerably in the literature (for just a small, recent sample, see Ye and Han 2008, Jodlbauer and Huber 2008, and Watson and Patti 2008). The first formal presentation of DBR was by Goldratt and Fox (1986), but before that detailed presentation, it was first known in The Goal, and that is where most practitioners likely first learn about it. After a casual reading (or even a careful one), the reader may be



References: Atwater J, Chavravorty S., 2002. A study of the utilisation of capacity constrained resources in drum-buffer-rope systems. Production and Operations Management 11, 259-273. Belis G., 1994. Peeking into your rival’s briefcase. Fortune March 18, 129, 179-180. Dani S., 2006. Book review – The Goal – A Process of Ongoing Improvement. International Journal of Production Research. 44, 419-420. The Economist, 1995. Tales out of business school. January 21, 334; 63. Goldratt, E., 1988, Computerized shop floor scheduling. International Journal of Production Research, 26 (3) 443-455. Goldratt, E., 1997. Critical Chain: A Business Novel. North River Press, Great Barrington, MA. Goldratt E, Cox, J., 1984. The Goal. North River Press, Croton-on-Hudson, NY. Goldratt E, Cox J., 1986. The Goal, revised edition. North River Press, Croton-on-Hudson, NY. Goldratt E, Cox J., 1992. The Goal, second revised edition. North River Press, Great Barrington, MA. Goldratt E, Cox J., 2004. The Goal, third revised edition. North River Press, Great Barrington, MA. Goldratt E.M., Fox, R.J., 1986. The Race. North River Press, Great Barrington, MA. Herroelen, W., Leus, R., 2007. On the merits and pitfalls of critical chain scheduling. Journal of Operations Management. 19 (5) 559-577. Hopp W, Spearman M., 2001. Factory Physics, second edition. McGraw-Hill Irwin, Burr Ridge IL. Jacobs F., Chase R, Aquilano N., 2009. Operations and Supply Management, 12th edition. McGraw-Hill Irwin, Burr Ridge, IL. Jodlbauer, H., and A. Huber, 2008, Service-level performance of MRP, kanban, CONWIP, and DBR due to parameter stability and environmental robustness. International Journal of Production Research, 8 (15), 2179-2195. Kouvelis P, Chambers C, Yu D., 2005. Manufacturing operations manuscripts published in the first 52 issues of POM: Reviews, trends, and opportunities. Production and Operations Management, 14, 450-567. Rand G., 1986. The Goal (book). European Journal of Operational Research, 26, 412-3. Silver E, Pyke D, Peterson R., 1998. Inventory Management and Production Planning and Scheduling, third edition. John Wiley & Sons, New York. Spearman M., 1997, On the theory of constraints and the goal system. Production and Operations Management, 6, 28-33 U.S U.S. Department of Labor., 1986. Occupational Outlook Handbook. 1986-1987 Edition. U.S. Department of Labor: Washington, D.C. Vollmann T, Berry W, Whybark D, Jacobs F.R., 2001. Manufacturing Planning and Control for Supply Chain Management, 5th edition. McGraw-Hill Irwin, Burr Ridge, IL. Watson, K., Blackstone, J., Gardiner, S., 2007, The evolution of a management philosophy: The theory of constraints, Journal of Operations Management, 25 (2) 387-402. Watson, K., and Patti, A., 2008, A comparison of JIT and TOC buffering philosophies on system performance with unplanned machine downtime, 46 (7) 1869-1885. Whitford D. 2004. An interview with Eli Goldratt and Others. in Goldratt E, Cox J. The Goal, third revised edition. North River Press, Great Barrington, MA. Ye T., W Han 2008. Determination of buffer sizes for drum-buffer-rope (DBR)-controlled production systems, International Journal of Production Research, 46 (10), 2827-2844.