Crash task Critical Path
Crash Task on critical path
We are confronted with having to reduce the scheduled complete time of a project to meet a deadline. The project duration can be reduced by applying more resources like more labor, additional equipment, and working overtime hours to complete the project.
After observing the MSP timeline, we selected the most critical tasks for the project:
Framing 14-16 Floors Steel Framing
Concrete Flooring 7-16
Rough-Ins
Utilities
Finishes
Furnishings
Closing
In considering the “crashing” method, hypothetical we are trying to reduce the duration by half of the time for each task. To demonstrate the procedure, we will focus on the concrete flooring 7-16; since it has the longest duration out of the other tasks.
Concrete flooring 7th to 16th floor, the normal cost which is $1,900,000.00 with duration of 315, which is our normal point. Since we are assuming that we’re reducing the duration by half, we can divide the duration by 2; 315/2 = 157.5(Crash time). Also the normal cost will be multiply by 2; ($1,900,000.00*2) = $3,800.000.00(Crash cost).
Calculating the Cost slope:
Cost slope = (Crash cost – Normal Cost) / (Normal time – Crash Time) = ($3,800,000.00 - $1,900,000.00) / (315 – 157.5) = $1,900,000.00 / 157.5 = $12,063.49 per unit of time

Now that we have the values for the crash cost and crash time, we can construct an activity graph. See graph below.

Even though the Concrete Flooding 7-16 has the longest duration, it’s not the task with the steepest slope from the rest of the tasks. The steepest slope is Furnishing. It will take $154,451.39 per unit of time, which means this task will cost the most to shorten the duration on the project. See the table below.

The following are the most critical task for the project. The table shows the slopes for all of these tasks.
Reduce Duration by Half on Project

Direct Costs

Normal
Crash

Slope
Max Crash Time
Time
Cost
Time
Cost

You May Also Find These Documents Helpful

  • Satisfactory Essays

    QAT1 Task 4

    • 501 Words
    • 7 Pages

    Determine each of the following: Task Earliest Start Latest Start Earliest Finish Latest Finish Slack A 0 6.5 3 9.5 6.5 B 0 0 7 7 0 CRITICAL C 3 9.5 7.5 14 6.5 D 7 7.5 18.5 19 0.5…

    • 501 Words
    • 7 Pages
    Satisfactory Essays
  • Powerful Essays

    MGT2 Task3

    • 5037 Words
    • 21 Pages

    Increase the project team size to catch up and speed up progress reducing potential for any further schedule…

    • 5037 Words
    • 21 Pages
    Powerful Essays
  • Satisfactory Essays

    Proj586 - Week 2 Quiz

    • 932 Words
    • 4 Pages

    b) If the project schedule is relaxed or lengthened, what is the impact on quality? (15 points)…

    • 932 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The following data were obtained from a project to design a new software package: Activity Duration Predecessors A 5 Days --- B 8 Days --- C 6 Days A D 4 Days C, B E 5 Days A F 4 Days D, E, G G 4 Days B, C H 3 Day G Step 1: Construct a network diagram for the project. Step 2: Answer the following questions: (15 points total) a) Calculate the…

    • 556 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Jim Brown

    • 770 Words
    • 4 Pages

    From what we can determine so far the main issues revolving around your construction project are unionized workers starting strikes and weather concerns during December. We are also informed that the company will suffer from a $500 per week penalty fee on overhead expenses if the construction project is not finished on time. It is also stated in the contract that a penalty clause of $15,000 per week of delay beyond February 15 of the following year will be implemented.…

    • 770 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Whatever the type of project, there are three important elements of cost, schedule and performance project managers must achieve in order to attain a successful project outcome. These elements are interrelated which means a slight change of one of the elements such as prolonging the project time schedule highly affect the element of cost or more…

    • 1428 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Huntsville Project

    • 758 Words
    • 4 Pages

    We can expedite the project by reducing the amount of time we have slated for some of our larger tasks. By recalculating and essentially shortening the schedule we can decrease our project by 10%. “A change in the estimated duration of any activity on that path will cause a corresponding change in the slack for that path.” (Gido and Clements 167). Currently we have several tasks that we can reduce time:…

    • 758 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    A&D High Tech

    • 4238 Words
    • 17 Pages

    We are presenting two alternatives for carrying out the project in a shorter time frame, like working overtime or hiring extra resources. We have mixed the two alternatives so that the tasks that are quality sensitive/critical will be crashed by subcontracting additional resources to avoid employee fatigue that can effect the quality of the work, while the tasks that are indivisible or have a learning curve that need to be done by one resource will be crashed by overtime work.…

    • 4238 Words
    • 17 Pages
    Powerful Essays
  • Good Essays

    1. The reason that smaller projects appear to be more profitable is because of the cost drivers that Linda Evans chose to use to allocate the overhead costs. It is unfair to allocate an equal amount of overhead cost to the different kinds of projects, when the smaller projects cost more in days of data collection than the larger reports do. This is especially important to consider because the days of data collection is directly related to the project salaries, which is the cost driver for the allocation of overhead.…

    • 773 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    a. What was the cost of materials used for repair work during the month of February? $120,250.…

    • 876 Words
    • 4 Pages
    Powerful Essays
  • Powerful Essays

    Curled Metal

    • 1589 Words
    • 7 Pages

    In Exhibit 1 Calculation done according to the Kendrick parameters and used Exhibit 3 to calculate the cost of an hour which total system is waiting for either the replacement of pads or the time lost because of the performance of driving a pile is lower if conventional pads are used. According to the calculation performed, compared to Kendrick and Corey, CMI pads have a differentiation value of $4,254 and $5,702 respectively.…

    • 1589 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    A&D HIGH TECH

    • 263 Words
    • 2 Pages

    What is your opinion on the potential for the project to be completed on time?…

    • 263 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Case Teaneck

    • 991 Words
    • 4 Pages

    Table 1 shows time and cost estimates of Teaneck’s engineers. The trunk sewer extension is to be laid in a tunnel for 1/3 its length; the remaining 2/3 is to be constructed in trenches. To build the tunnel, a primary shaft must be excavated first, then the secondary shafts can be driven and the tunnel can be dug simultaneously. The trench is to be started at the same time as the primary shaft. Another crew of workers follows the trench workers, laying pipes, pouring concrete and refilling trenches as far as they have been excavated. The excavators lose no time as a result of this follow up. A third group would be performing a similar function in the tunnel.…

    • 991 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Scope Management Plan

    • 305 Words
    • 2 Pages

    Budget Information: The Company has allocated $650,000 for this project. Most costs will be from 60 hours of internal labor.…

    • 305 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Cost Effective Materials

    • 1831 Words
    • 8 Pages

    Environment Friendly Indian Building Material Technologies for Cost Effective Housing SHEE Contents 1. Flyash-Sand-Lime-Gypsum Bricks 1 2. Compressed Earth / Fly Ash Sand Lime Gypsum Blocks (Interlocking Type) 7 3. Compressed Earth Bricks/Blocks 9 4.…

    • 1831 Words
    • 8 Pages
    Good Essays