I learned to be patient with the design. I also learned that if something does not goes as planned you must consider your options and consider what will work better. I enjoyed brainstorming with my partener the design and then actually drawing the design on graph paper. I learned that you must be very precise while drawing and make sure your measurements are correct. I enjoyed figuring out when to use duct tape and when to use scotch tape. I learned that you should always use duct tape in high stress areas. I learned that only use duct tape in a low stress area and where it might only be used as a guide for the string. Overall I enjoyed the project, but I saw a few things I would improve about the project. I would have limited the amount of materials used per group. I would have limited the amount of duct tape used. I would have changed the voting system as well. I would of made each group turn in a paper for each crane. Lastly I would have let each group redesign their crane and retest it.
Bridge